NII Metropolitan Edison Company Post Office Box 480 Middletown, Pennsylvania 1705i 1
Writer's Direct Dial Nurnber June 24,1981 Llt 133 m
\\
,N
. c-Office of Nuclear Reactor Regularion Attn:
J. F. Stolz, Chief f.
I,a s
Operating Reactor, Branch No. 4 y'
7 y- "
s.c31
_O U. S. Nuclear Regulatory Commission a
t.
Washington, D.C.
20555 7,q u.s. m-.i., u w rei, su cc. a s ss en 77
Dear Sir:
b:i,
., ~.
'ed [g $,' d
Three Mile Island Nu lear Station, Unit 1 (TMI-1)
Operating License No. DPR-50 Docket No. 50-289 Process Control Plan Rev. 2 Enclosed please find Revision 2 to the Process Control Program (PCP) previously submitted on August 21, 1980 (TLL 345) Rev. 1 and May 21, 1980 (TLL 237) Rev. O.
Sincerely,
'kil Director, TMI-l 11Dil: L'a11:1ma Enclosures cc:
B. 11. Crier L. Barrett D. Dilanni
\\ l 810 6 30 0N' THis DOChMENT CONTAINS P00R QUALITY PAGES
~
Me!'OCohtan Ed SCn CCmCdry S J ?.'emter Of tre Gecer3i PAsc (*c!es $,s em
l 1
j 0
l 1
1.
Process Control Plan Rev. 2 The licensee requests that the attached changed pages replace page 1-13 of the existing PCP.
II.
Reason for Revision The attached PCP change was made to incorporate guidance for the solidifi-cation of oil with the Hittman In-Container Cement Solidification System.
III. Safety Evaluation Justifying Change The change to the PCP provides guidance for the solidification of a waste type in addition to those in the original. The process has been tested by the contractor and will be verified through laboratory scale solidification testing as described in the original PCP.
Therefore, these changes do not reduce the overall conformance of the solidified waste product to existing criteria for solid waste. These changes 'iave been reviewed and approved by the Plant Operations Review Committee.
9 1