Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000259/LER-1981-038-03, /03L-0:on 810630,setpoints for Reactor Low Pressure Switches PS-3-74B,PS-68-95 & PS-68-96 Actuated Outside Allowable Limits.Caused by Setpoint Drift.Barton & Barksdale Model Switches Recalibr + (13:02:25, 21 December 2024)
- ML20009G488 + (13:02:27, 21 December 2024)
- ML20009G487 + (13:02:31, 21 December 2024)
- ML20009G486 + (13:02:32, 21 December 2024)
- ML20009G485 + (13:02:33, 21 December 2024)
- PNO-I-81-084, on 810724,two Operators Relieved of NRC Licensed Duties by General Public Utils Pending Outcome of NRC Investigation Into Alleged Improprieties During NRC Operator Licensing Exam.Individuals Reassigned + (13:02:35, 21 December 2024)
- ML20009G482 + (13:02:38, 21 December 2024)
- 05000259/LER-1981-038, Forwards LER 81-038/03L-0 + (13:02:42, 21 December 2024)
- ML20009G479 + (13:02:45, 21 December 2024)
- 05000321/LER-1981-071, Forwards LER 81-071/03L-0 + (13:02:46, 21 December 2024)
- ML20009G475 + (13:02:47, 21 December 2024)
- L-81-289, Responds to IE Bulletin 81-02, Failure of Gate Type Valves to Close Against Differential Pressure. No Subj Valves Installed Where Differential Pressure Required to Close. Vendor Reviewing Gate Valves Per 810622 Deficiency Rept + (13:02:48, 21 December 2024)
- ML20009G472 + (13:02:50, 21 December 2024)
- 05000269/LER-1981-009-03, /03L-0:on 810622,during Normal Operations,Startup Transformer CT-1 Locked Out.Cause Not stated.CT-1 Transformer & Bus Work Checked & Protective Relaying Checked for Malfunction Prior to Return to Svc + (13:02:51, 21 December 2024)
- ML20009G470 + (13:02:52, 21 December 2024)
- ML20009G469 + (13:02:53, 21 December 2024)
- 1CAN078107, Forwards Results of Intake Impingement Monitoring for June 1981 + (13:02:54, 21 December 2024)
- 05000269/LER-1981-009, Forwards LER 81-009/03L-0.Detailed Analysis Encl + (13:03:00, 21 December 2024)
- ML20009G463 + (13:03:01, 21 December 2024)
- IR 05000327/1981018 + (13:03:05, 21 December 2024)
- ML20009G460 + (13:03:07, 21 December 2024)
- 05000327/LER-1981-076-03, /03L-0:on 810627,during Mode 2,1A-A Safety Injection Pump Declared Inoperable When Water Found in Lube Oil.Caused by Condensation Buildup.Oil Changed & Lube Oil Cooler Checked for Leaks + (13:03:08, 21 December 2024)
- ML20009G455 + (13:03:09, 21 December 2024)
- ML20009G454 + (13:03:10, 21 December 2024)
- ML20009G453 + (13:03:11, 21 December 2024)
- 05000327/LER-1981-076, Forwards LER 81-076/03L-0 + (13:03:12, 21 December 2024)
- IR 05000324/1981009 + (13:03:15, 21 December 2024)
- ML20009G449 + (13:03:16, 21 December 2024)
- ML20009G445 + (13:03:22, 21 December 2024)
- ML20009G446 + (13:03:22, 21 December 2024)
- ML20009G444 + (13:03:23, 21 December 2024)
- ML20009G443 + (13:03:24, 21 December 2024)
- ML20009G442 + (13:03:25, 21 December 2024)
- ML20009G441 + (13:03:26, 21 December 2024)
- ML20009G440 + (13:03:30, 21 December 2024)
- A01685, Responds to NRC Re Violations Noted in IE Insp Rept 50-423/81-02.Corrective Actions:Audit Schedule Reassessed & Revised & Audits Performed + (13:03:34, 21 December 2024)
- BSEP-81-1291, Responds to NRC Re Violations Noted in IE Insp Repts 50-324/81-09 & 50-325/81-09.Corrective Actions:Mod Written to Replace Incorrectly Sized Power Cables & Calibr Procedure for Dry Gas Meters Being Written + (13:03:38, 21 December 2024)
- ML20009G437 + (13:03:40, 21 December 2024)
- ML20009G435 + (13:03:41, 21 December 2024)
- ML20009G432 + (13:03:49, 21 December 2024)
- ML20009G431 + (13:03:50, 21 December 2024)
- ML20009G430 + (13:03:50, 21 December 2024)
- ML20009G427 + (13:03:56, 21 December 2024)
- B10238, Informs That WCAP Repts Re Evaluation of Effects of Asymmetric LOCA Loads on Integrity of Primary Rcs,Are Applicable to Haddam Neck Docket & Should Be Regarded as Response to NRC Task Action Plan NRC-TAP-TOPIC-A-2 + (13:03:57, 21 December 2024)
- 0CAN068104, Responds to IE Insp Repts 50-313/81-13 & 50-368/81-11 Re 810324-25 Emergency Plan Exercise.Corrective Actions:Addl Telephones Being Added to Shift Supervisor Ofc in Each Control Room + (13:04:01, 21 December 2024)
- ML20009G422 + (13:04:05, 21 December 2024)
- 05000335/LER-1981-033-03, /03L-0:on 810625,setpoint for Engineered Safeguard Sys Channel C Containment Pressure Was Found Out of Tolerance in Nonconservative Direction.Caused by Setpoint Drift.Setpoint Readjusted + (13:04:15, 21 December 2024)
- ML20009G417 + (13:04:16, 21 December 2024)
- ML20009G416 + (13:04:17, 21 December 2024)
- 05000335/LER-1981-033, Forwards LER 81-033/03L-0 + (13:04:20, 21 December 2024)
- ML20009G413 + (13:04:23, 21 December 2024)