Forwards IE Insp Rept 50-327/81-18 on 810512-15 & Notice of Violation.Details & Notice of Violation Withheld (Ref 10CFR2.790)
ML20009G454
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 06/02/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19260H990 List:
References
NUDOCS 8108040277
Download: ML20009G454 (2)


See also: IR 05000327/1981018

Text

MATERIALTR.U!SMITTED HEREWITH

,-)

u A7 O>

-

",

rg

CONTAlHS 2.700INFORMATION

d

o

UNITED STATES

OFFICIAI, COPY

8I

N.

NUCLEAR REGULATORY CCMMiSSION

Chg

&.

A

aE

REGION 11

o,

'[

101 MARIETTA ST.. N.W., SUITE 3100

-

j'

ATLANTA, GEORGIA 30303

.....

JUN 0 21981

Tennessee Valley Authority

ATTN:

Mr. H. G. Parris

Manager of Power

500A Chestnut Street Tower II

Chattanooga, TN 37401

Gentlemen:

Subject: Report No. 50-327/81-18

This refers to the routine inspection conducted by Ms. C. D. Perny of this office

on May 12-15. 1981, of activities authorized by NRC Operating License No. OPR-77

at the Sequoyah facility and to the discussions of our findings held with

V

J. M. McGriff, Assistant Plant Superintendent, at the conclusion of the

inspection.

Areas examined during this inspection included your physical security program as

implemented under the provisions of Title 10, Code of Federal Regulations, Part

73, " Physical Protection of Plants and Materials", and the specific requirements

of your approved Security Plan. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, performance tests, and observations by the inspector.

During the inspection, it was found that certain activities under your license

appear to violate NRC requirements.

These items and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as Appen-

dix A.

Elements to b? included in your response are delineated in Appendix A.

Details of activities involving safeguards and security measures are exempt from

disclosure in accordance with 10 CFR 2.790(d). Therefore, your response should

be incorporated in a separate paper and referenced in your reply.

We have examined actions you have taken with regard to previously identified

enforcement matters and unresolved items. The status of these items is discussed

in the enclosed report.

One new unresolvea item resulted from this inspection and is discussed in the

enclosed report. This item will be examined during subsequent inspections.

In accordance with Section 2.790(d) of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, activities involving safeguards and

security measures are exempt from public disclosure; therefore, the enclosures to

this letter with the exception of the report cover page, which is an inspection

summary, will not be placed in the Public Document Room.

8108040277 810721

PDR ADOCK 05000327

G

PDR

MATER 1,R TRANSMITTED HEREWITH

CONTAINS 2.700 INFORMATIDM

_

JUN 0 21981

MATER 1AlTRANSMRTED HEREWUH

-

-

CDHTAINS 2.790INFORMATION

-

Tennessee Valley Authority

2

Should you have any questions concerning-this letter, we will be glad to discuss

thein with you.

Sincerely,

8 C.

D

R. C. L wis, Acting Director

Division of Resident and

Reactor Project Inspection

Enclosures:

1.

Appendix A, Notice of Violation

(Exempt from Disclosure)

2.

Inspection Report No. 50-327/81-18

(Exempt from Disclosure)

3.

Inspection Summary

(Not Exempt)

cc w/ encl:

H. J. Green, Division Director

G. G. Stack, Project Manager

J. M. Ballentine, Plant

Superintendent

J. F. Cox, Supervisor, Nuclear

Licensing Section

M. J. Bur.ynski, Project Engineer

H. N. Cu',ver, Chief, Nuclear Safety

Review Staff

MATERIAL TRANSMITTED HEREWITH

CONTAINS 2.790 INFORMATION