Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20031F827 + (18:05:58, 20 December 2024)
- ML20031F826 + (18:06:01, 20 December 2024)
- 05000277/LER-1981-040-01, /01T-0:on 810923,review of Rockbestos RSS-6-104 & RSS 6-110 Cables,Used in Safety Relief Valve Acoustic Monitoring Sys,Revealed Potential Failure at Elevated Temps Following LOCA or Pipe Break Accident + (18:06:02, 20 December 2024)
- ML20031F824 + (18:06:04, 20 December 2024)
- ML20031F823 + (18:06:05, 20 December 2024)
- 05000366/LER-1981-091-03, /03L-0:on 810917,during steady-state Operation at 1942 Mw,Torus Vacuum Relief valve,2T48-F310,was Found Open. Caused by Component Failure.New Switch Installed.Design Change Initiated to Install Compatible Design Switches + (18:06:06, 20 December 2024)
- ML20031F820 + (18:06:08, 20 December 2024)
- B10255, Application for Amend to License DPR-21.Changes Establish Common Water Level Ref Above Bottom of Reactor Vessel Per NUREG-0737 Item II.K.3.27 + (18:06:09, 20 December 2024)
- IR 05000528/2019004 + (18:06:13, 20 December 2024)
- 05000277/LER-1981-040, Forwards LER 81-040/01T-0.Detailed Event Analysis Encl + (18:06:15, 20 December 2024)
- IR 05000344/1981023 + (18:06:17, 20 December 2024)
- ML20031F812 + (18:06:19, 20 December 2024)
- 05000366/LER-1981-091, Forwards LER 81-091/03L-0 + (18:06:21, 20 December 2024)
- IR 05000361/1981020 + (18:06:23, 20 December 2024)
- GO2-81-341, Responds to IE Bulletin 80-21 Re Valve Yokes Supplied by Malcolm Foundry Co,Inc.No Malcolm Foundry Components Used by Manufacturers or Contractors as Supply Source.Manpower Estimate & List of Manufacturers Encl + (18:06:25, 20 December 2024)
- ML20031F805 + (18:06:27, 20 December 2024)
- 05000327/LER-1981-119-03, /03L-0:on 810914,while Performing Surveillance Instruction 157,containment Penetration Leak Rate Test Penetrations X-1,X-108 & X-109 Were Found W/Pipe Plugs Missing.Caused by Personnel Error.Instructions Revised + (18:06:29, 20 December 2024)
- ML20031F802 + (18:06:31, 20 December 2024)
- ML20031F799 + (18:06:33, 20 December 2024)
- ML20031F798 + (18:06:34, 20 December 2024)
- PNO-III-81-087, on 811015,NRC & Kerr-McGee Chemical Co Named as Defendants in Suit Filed in Federal Court by City of West Chicago.Suit Seeks to Halt Dismantling of Kerr-McGee Bldgs Where Thorium & U Compounds Were Processed + (18:06:36, 20 December 2024)
- 05000311/LER-1981-102-03, /03L-0:on 810915,low Reading Discovered on Reactor Coolant Loop Flow Channel 2.Caused by Failure of Flow Transmitter & Equalizing Valve Assembly.Channel Placed in Tripped Condition.Transmitter & Assembly Replaced + (18:06:38, 20 December 2024)
- ML20031F794 + (18:06:39, 20 December 2024)
- ML20031F793 + (18:06:43, 20 December 2024)
- 05000327/LER-1981-119, Forwards LER 81-119/03L-0 + (18:06:45, 20 December 2024)
- ML20031F790 + (18:06:47, 20 December 2024)
- ML20031F788 + (18:06:48, 20 December 2024)
- ML20031F786 + (18:06:49, 20 December 2024)
- ML20031F784 + (18:06:50, 20 December 2024)
- 05000311/LER-1981-102, Forwards LER 81-102/03L-0.Detailed Event Analysis Encl + (18:06:52, 20 December 2024)
- ML20031F781 + (18:06:53, 20 December 2024)
- ML20031F780 + (18:06:54, 20 December 2024)
- ML20031F779 + (18:06:55, 20 December 2024)
- ML20031F778 + (18:06:56, 20 December 2024)
- 05000334/LER-1981-083, Forwards LER 81-083/03L-0 + (18:07:03, 20 December 2024)
- ML20031F770 + (18:07:04, 20 December 2024)
- ML20031F769 + (18:07:06, 20 December 2024)
- 05000304/LER-1981-023-03, /03L-0:on 810913,reactor Coolant Boron Sample Not Obtained on Second Shift.Caused by Normal Sampling Path Being Isolated Due to Mod on Sampling Sys.Alternate Sample Point Isolated for Repairs + (18:07:07, 20 December 2024)
- ML20031F767 + (18:07:09, 20 December 2024)
- ML20031F765 + (18:07:10, 20 December 2024)
- 05000304/LER-1981-023, Forwards LER 81-023/03L-0 + (18:07:12, 20 December 2024)
- IR 05000348/1981017 + (18:07:16, 20 December 2024)
- 05000334/LER-1981-079-01, /01T-0:on 810922,containment Radioactivity Monitors Failed Due to Power Supply Loss.Caused by Formation of Temporary Ground Between Two Adjacent Radiation Monitors. Frayed Power Cable Repaired + (18:07:18, 20 December 2024)
- ML20031F759 + (18:07:21, 20 December 2024)
- ML20031F758 + (18:07:22, 20 December 2024)
- 05000334/LER-1981-079, Forwards LER 81-079/01T-0 + (18:07:24, 20 December 2024)
- ML20031F753 + (18:07:26, 20 December 2024)
- ML20031F752 + (18:07:27, 20 December 2024)
- 05000325/LER-1981-063-03, /03L-0:on 810924,during Reactor Startup,Control Rod 26-31 Set Off Rod Drift Alarm When Fully Inserted W/ full-in RTGB Position Indication.Caused by Failed Reed Switch.Switch Will Be Repaired + (18:07:29, 20 December 2024)
- 05000334/LER-1981-084-03, /03L-0:on 810907,train B Quench Spray Flow Reduction Control Valve Failed to Stroke Closed from Full Open Position.Caused by Failed Torque Switch.Switch Readjusted + (18:07:31, 20 December 2024)
- FVY-81-139, Responds to NRC Re Violations Noted in IE Insp Rept 50-271/81-13.Notarized Statement Added + (18:07:32, 20 December 2024)