ML20031F820

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-293/81-17 on 810727-31.No Noncompliance Noted
ML20031F820
Person / Time
Site: Pilgrim
Issue date: 10/02/1981
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Morisi A
BOSTON EDISON CO.
Shared Package
ML20031F821 List:
References
NUDOCS 8110200454
Download: ML20031F820 (2)


See also: IR 05000293/1981017

Text

.

.

-

.

.

Docket No. 50-293

OCT 1981

m

E

Boston Edison Company M/C Nuclear

\\g)

ATTN: Mr. A. V. Morisi

of

/f

N

Nuclear Operations Support Manager

OL

j'

h

800 Boylston Street

9

u

Boston, Massachusetts

02199

5

0 Il 6 Jgg7g

2

W"

'

Gentlemen:

k

Subject:

Inspection 50-293/81-17

p

g

us

This refers to the routine inspection conducted by J. J. Kottan of this

office on July 27-31, 1981 at the Pilgrim Station, Plymouth, Massachusetts

of activities authorized by NRC License No. DPR-35 and to the discussions

of our findings held by Mr. Kottan with Mr. R. D. Machon and others of your

staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter.

Within these areas, the inspection consisted of selective examinations of

procedures and representative records, interviews with personnel, and

observations by the inspector.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

If this report contains any information that you (or

your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4),

it is necessary that you (a) notify this office by telephone within ten

(10) days from the date of this letter of your intention to file a request

for withholding; and (b) submit within 25 days from the date of this letter

a written application to this office to withhold such information.

Con-

sistent with section 2.790(b)(1), any such application must be accompanied

by an affidavit evecuted by the owner of the information which identifies

the document or part sought to be withheld, and which contains a full

statement of the reasons on the basis which it is claimed that the information

should be withheld from public disclosure. This section further requires

the statement to address with specificity the consioerations listed in 10 CFR 2.790(b)(4).

The information sought to be withheld shall be incorporated

as far as possible into a separate part of the affidavit.

If we do not

hear from you in this regard within the specified periods noted above, the

report will be placed in the Public Document Room. The telephone notification

of your intent to request withholding, or any request for an extension of

the 10 day period which you believe necessary, should be made to-the

Supervisor, Files Mail and Records, USNRC Region I, at (215) 337-5223.

p

/ /

'f):DEPOS

JI:DEPOS

RI:DED S

RI:00PI

RI:, DPI

I Mtan:hh

Bores

Snvder

Memesa.

Brunner

9/11/81

7-198(

gl

f# #

/ff/([g/

f

ogg,gg

0FFICIAL RECORD C0ov

-

r

.

.

.

Boston Edison Company M/C Nuclear

2

02 OCT 1981

No reply to this letter is required; however, if you have any questior s

concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

prisinal Signed Sys

Eldon J. Brunner, Chief, Projects

Branch #1, Division of Resident

and Project Inspection

Enclosure: Office of Inspsetion and Enforcement

Inspection Report Number 50-293/01-17

cc w/ encl:

R. D. Machon, Nuclear Operations Manager - Pilgrim Station

Public Document Room (POR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Massachusetts (2)

bec w/ encl:

Region I Docket Room (with concurrences)

Chief, Operational Support Section (w/o encis)

.0FFICIAL RECORD CODY

l