Docket No. 50-293
OCT 1981
m
E
Boston Edison Company M/C Nuclear
\\g)
ATTN: Mr. A. V. Morisi
of
/f
N
Nuclear Operations Support Manager
j'
h
800 Boylston Street
9
u
Boston, Massachusetts
02199
5
0 Il 6 Jgg7g
2
W"
'
Gentlemen:
k
Subject:
Inspection 50-293/81-17
p
g
us
This refers to the routine inspection conducted by J. J. Kottan of this
office on July 27-31, 1981 at the Pilgrim Station, Plymouth, Massachusetts
of activities authorized by NRC License No. DPR-35 and to the discussions
of our findings held by Mr. Kottan with Mr. R. D. Machon and others of your
staff at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter.
Within these areas, the inspection consisted of selective examinations of
procedures and representative records, interviews with personnel, and
observations by the inspector.
Within the scope of this inspection, no items of noncompliance were observed.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC's
Public Document Room.
If this report contains any information that you (or
your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4),
it is necessary that you (a) notify this office by telephone within ten
(10) days from the date of this letter of your intention to file a request
for withholding; and (b) submit within 25 days from the date of this letter
a written application to this office to withhold such information.
Con-
sistent with section 2.790(b)(1), any such application must be accompanied
by an affidavit evecuted by the owner of the information which identifies
the document or part sought to be withheld, and which contains a full
statement of the reasons on the basis which it is claimed that the information
should be withheld from public disclosure. This section further requires
the statement to address with specificity the consioerations listed in 10 CFR 2.790(b)(4).
The information sought to be withheld shall be incorporated
as far as possible into a separate part of the affidavit.
If we do not
hear from you in this regard within the specified periods noted above, the
report will be placed in the Public Document Room. The telephone notification
of your intent to request withholding, or any request for an extension of
the 10 day period which you believe necessary, should be made to-the
Supervisor, Files Mail and Records, USNRC Region I, at (215) 337-5223.
p
/ /
'f):DEPOS
JI:DEPOS
RI:DED S
RI:00PI
RI:, DPI
I Mtan:hh
Snvder
Memesa.
Brunner
9/11/81
7-198(
gl
f# #
/ff/([g/
f
ogg,gg
0FFICIAL RECORD C0ov
-
r
.
.
.
Boston Edison Company M/C Nuclear
2
02 OCT 1981
No reply to this letter is required; however, if you have any questior s
concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
prisinal Signed Sys
Eldon J. Brunner, Chief, Projects
Branch #1, Division of Resident
and Project Inspection
Enclosure: Office of Inspsetion and Enforcement
Inspection Report Number 50-293/01-17
cc w/ encl:
R. D. Machon, Nuclear Operations Manager - Pilgrim Station
Public Document Room (POR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Massachusetts (2)
bec w/ encl:
Region I Docket Room (with concurrences)
Chief, Operational Support Section (w/o encis)
.0FFICIAL RECORD CODY
l