Text
_
_
.
_
-.
-
.
.
,'
yellow
'
.
AUG n 51991
Alabama Power Company
ATTN: Mr. R. P. Mcdonald
Vice President-Nuclear Generation
P. O. Box 2641
Birmingham, AL 35291
Gentlemen:
Subject:
Report Nos. <5F348/81213 and 50-364/81-20
This refers to the routine safety inspection conducted by Mr. W. H. Bradford of
this office on June 16 - July 15, 1981, of activities authorized by NRC n,nerating
License Nos. NPF-2 and NPF-8 for the Farley facility. Our preliminary findings
were discussed with Mr. W. G. Hairston, Plant Manager at the conclusion of the
inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
During the inspection, it was found that certain activities under your license
appear to violate NRC requirerents. This item and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as
Appendix A.
Elements to be included in your response are delineated in
Appendix A.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed report will be placed in the NRC's Public Document Room.
If the report contains any inforration that you believe to be exempt from
disclosure under 10 CFR 9.5(a)(4), it is necessary that you:
(a) notify this
office by telephone within ten days froin the date of this letter of your
intention to file a request for withholding; and (b) submit within twenty-five
days from the date of this letter a written application to this office to
withhold such information.
If your receipt of this letter has been delayed such
that less than seven days are available for your review, please notify this
office promptly so that a new due date may be established. Consistent with
'
section 2.790(b)(1), such application must be accompanied by an affidavit
executed by the owner of the information which identifies the document or part
thereof sought to be withheld, and a full statement of the reasons on the basis
of which it is claimed that the information should be wit.hheld from public
disclosure. This section further requires the statement to address with
specificity the considerations listed in 10 CFR 2.790(b)(4).
The information
sought to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within the
specified periods noted above, the report will be placed in the Public Document
Room.
' 8 A 10200390 ~ 011013
DR ADOCK 05000g .
-
-
- -
-
--
-
..
,
,
s
.
Al's n 51981
Alabama Power Company
2
.
Should you have any questions concerning this letter, we will be glad to discuss
]
them with you.
Sincerely,
?
4/
R. C. Lewis, Director
Division of Resident and
Reactor Project Inspection
i
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-348/81-17
and 50-364/81-20
cc w/ encl:
W. O. Whitt, Executive Vice P- sident
F. L. Clayton, Jr. , Senior Vit . President
H. O. Thrash, fianager-Nuclear Generation
'
0. D. Kingsley, Jr., Manager, Nuclear Engineering
and Technical Services
1
J. W. McGowan, Manager-0perations
'
Quality Assurance
W. G. Hairston, III, Plant Manager
W. C. Carr, Supervisor-Safety
. Audit and Engineering Review
bec w/ enc 1:
NRC Resident Inspector
Document Management Branch
i
State of Alabama
'
,
VL6(+j
RII,
RII
RII
RII
yt/>
WBradford:dt
PJK
logg
VBrownlee
RC ewis
f/(/81
F/81
t/4181
pg/81
.