Forwards QA Program Insp Rept 99900751/81-01 on 810601-05 & Notice of Nonconformance
ML20031F786
Person / Time
Issue date: 07/10/1981
From: Potapovs U
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Louthan F
RICHMOND ENGINEERING CO., INC.
Shared Package
ML20031F787 List:
References
REF-QA-99900751 NUDOCS 8110200423
Download: ML20031F786 (2)


Text

,

w i

b d 0 Std Docket No. 90000751/81-01 Richmond Engineering Company, Inc.

f((

(l0 b

s'o(d_f p

'H j

/

ATTN:

F. G. Louthan, Jr.

President 01.((

3.

O!-

Post Office Box 25189 p,.ggU S Jggy% T Richmond, VA 23260

'W' Gentlemen:

This refers to the inspection conducted by H. W. Roberds of fs office June 1-5, 1981, of your facility at Richmond, Virginia, associa'dhith the t

fabrication of vessels and to the discussions of our findings with you and members of your staff at the com:1usion of the inspection.

This inspection was made as a result of the fillet weld deficiencies identified ca gas decay tanks furnished to Washington Public Power Supply System (WPPSS)

Nuclear Projects 3 and 5.

i Areas examined and our findings are discussed in the enclosed report. Within these areas, the inspection consisted of an examination of procedures and representative records, interviews with personnel, and observations by the inspector.

During the inspection it was found that the implementation of your QA program failed to meet certain NRC requirements. The specific findings and references to the pertinent requirements are identified ir the enclosures to this letter.

Please provide us within 30 days fmm the date of this letter a written state-ment containing _(1) a description of steps that have been or will be taken to correct these items, (2) a description of step-that have been or will be taken to prevent recurrence, and (3) the date your corrective actions and preventive d

measures were or will be completed. Consideration may be given to extending your response time for a good cacse shown.

The responses directed by this Notice are not subject to the clearance pro-cedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, PL %-511.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of.

l this letter and the enclosed inspection report will be placed in the NRC's Fublic Document Room. If this report contains any infomation that you believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by telephone within 10 days from the date of this letter of your intention to file a request for withholding; and (b) sub-mit within 25 days from the date of this letter a written application to this office to withhold such information.

If your receipt of this letter has been i

delayed such that less than seven days are available for your review, please notifyJAis_offica_promptly_so that a naw A= data may ho esM]_jghai

=>..R,1S,WP g,,,,,,RIS g

,,,VIB q,,,,,,,I E{ _,,,, DD IV swmuu >

HRoberds:bt. IBarnes llPotapovs JGahiardo llins b

b

...............g...........

nm b 7 /7 /A1 7/7/81 7/ F/81 7/ /81 7/q /81

/

\\

- n1103OO433 810710

( ty ' ' " "

' - PDR GA999 EECRIEN jf f

. 9900751 PR OFF(ICI AL. RECORD COPY

^-

Richmond Engineering Company, Inc.

2 Consistent with Section 2.790(b)(1), any such application must be accompanied by an affidavit executed by the owner of the information which identifies the document or part sought to be withheld, and which contains a full statement of the reasons on the basis which it is claimed that the information should be withheld from public disclosure. This section further requires the statement to address with specificity the considerations listed in 10 CFR 2.790(b)(4).

The information sougnt to be withheld shall be incorporated as far as possible into a separate part of the affidavit. If we do not hear from you in this regard within the specified periods noted above, the report will be placed in the Public Document Room.

Should you have any questions concerning this inspection, we will be' pleased to discuss them with you.

Sincerely.

Uldis Potapovs, Chief Vendor Inspection Branch

Enclosures:

1.

Notice of Nonconfonnance 2.

Inspection Report No. 99900751/81-01 bec:

Chief, V&SPB, DR&RRI, HQS (Reinmuth)

IE Files AE00 NMSS QAB NRC:PDR Reg. Directors, I, II, III, V JEGagliardo, RIV ASME NBB&PVI

'"c'>

"'""C" L " "c ' " " ' ' " '

OFFICIAL RECORD COPY