Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20034C101 + (12:57:54, 20 December 2024)
- ML20034C091 + (12:57:58, 20 December 2024)
- ML20034C089 + (12:58:00, 20 December 2024)
- BSEP-90-0349, Radiological Environ Operating Rept 1989, Vols I-III + (12:58:03, 20 December 2024)
- ML20034C082 + (12:58:05, 20 December 2024)
- ML20034C081 + (12:58:07, 20 December 2024)
- ML20034C079 + (12:58:08, 20 December 2024)
- PNO-V-90-020, on 900423,Region V Informed by Util of Recent Incidents Involving Vandalism of Two Wooden Power Poles & One Steel Transmission Tower.On 900422,util Discovered That Vandals Had Cut in Half Wooden Power Pole.Pole Repaired + (12:58:19, 20 December 2024)
- ML20034C072 + (12:58:20, 20 December 2024)
- ML20034C070 + (12:58:21, 20 December 2024)
- ML20034C069 + (12:58:22, 20 December 2024)
- PNO-III-90-029A, on 900426,automatic Turbine Runback Occurred Due to Stator Water Cooling Sys Problem.Control Room Operators Properly Responded to Transient in Conservative Manner.Region Special Insp Team Will Hold Meeting on 900427 + (12:58:24, 20 December 2024)
- ML20034C065 + (12:58:25, 20 December 2024)
- IR 05000155/1990009 + (12:58:27, 20 December 2024)
- ML20034C059 + (12:58:28, 20 December 2024)
- ML20034C057 + (12:58:30, 20 December 2024)
- IR 05000298/1990004 + (12:58:32, 20 December 2024)
- ML20034C054 + (12:58:33, 20 December 2024)
- ML20034C049 + (12:58:35, 20 December 2024)
- ML20034C048 + (12:58:37, 20 December 2024)
- ML20034C038 + (12:58:38, 20 December 2024)
- ML20034C037 + (12:58:40, 20 December 2024)
- ML20034C032 + (12:58:41, 20 December 2024)
- IR 05000286/1990004 + (12:58:48, 20 December 2024)
- ML20034C027 + (12:58:50, 20 December 2024)
- ML20034C024 + (12:58:53, 20 December 2024)
- AECM-90-0071, Forwards Rev 0 to Temporary Procedure 04-1-01-P41-1-Temp-10, Contingency Long-Term Cooling for Standby Svc Water Basin a + (12:58:55, 20 December 2024)
- ML20034C021 + (12:59:00, 20 December 2024)
- ML20034C014 + (12:59:01, 20 December 2024)
- ML20034C013 + (12:59:02, 20 December 2024)
- ML20034C012 + (12:59:03, 20 December 2024)
- ML20034C011 + (12:59:04, 20 December 2024)
- ML20034C008 + (12:59:06, 20 December 2024)
- ML20034C007 + (12:59:07, 20 December 2024)
- ML20034C006 + (12:59:08, 20 December 2024)
- ML20034C004 + (12:59:09, 20 December 2024)
- ML20034C003 + (12:59:10, 20 December 2024)
- ML20034C000 + (12:59:11, 20 December 2024)
- ML20034B998 + (12:59:12, 20 December 2024)
- ML20034B996 + (12:59:13, 20 December 2024)
- PNO-I-90-033, on 900424,unit Initiated Tech Spec Required Shutdown Due to Both Hydrogen Recombiners Being Inoperable. Repairs to Recombiners Performed Concurrent W/Shutdown.State & Local Authorities Informed + (12:59:15, 20 December 2024)
- ML20034B993 + (12:59:16, 20 December 2024)
- ML20034B992 + (12:59:17, 20 December 2024)
- ML20034B990 + (12:59:20, 20 December 2024)
- ML20034B989 + (12:59:21, 20 December 2024)
- B13507, Application for Amend to License DPR-95,adding Tech Spec Sections 3/4.7.11 & 3/4.7.12 & Associated Bases Re Structural Aspects of Seismic Qualification Requirements for Piping Sys + (12:59:22, 20 December 2024)
- ML20034B986 + (12:59:24, 20 December 2024)
- B13512, Annual Radiological Environ Operating Rept 1989 + (12:59:25, 20 December 2024)
- ML20034B983 + (12:59:27, 20 December 2024)
- ML20034B982 + (12:59:28, 20 December 2024)
- ML20034B981 + (12:59:29, 20 December 2024)