IR 05000155/1990009

From kanterella
Jump to navigation Jump to search
Insp Rept 50-155/90-09 on 900409-13.No Violations Noted. Major Areas Inspected:Security Plan & Procedures,Mgt Support & Effectiveness,Security Program Audit,Personnel Training & Qualification & Previous Insp Findings
ML20034C063
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 04/25/1990
From: Creed J, Kniceley J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20034C060 List:
References
50-155-90-09, 50-155-90-9, NUDOCS 9005020025
Download: ML20034C063 (4)


Text

_

.

.

.

,

..

.

E U.S. NUCLEAR. REGULATORY COMMISSION

REGION III

Report No. 50-155/90009(DRSS)

-Docket'No. 50-155 License No. DPR-6

Licensee:

Consumers Power Company, 1945 West-Parnall Road Jackson, MI 49201

,

Facility Name:

Big Rock Point Nuclear Power Plant

]

Inspection At: Big Rock Point, Charlevoix,L Michigan Inspection Conducted: April 9-13, 1990

'

Inspector:

R

fJ es R. Kniceley Date P sical Security Inspector

'

Approved By: h

.

70

.

J ' n R. Creed, ChTef Date eguards Section Inspection Summary-

-I Inspection on April 9-13, 1990 (Report No.-50-155/90009(DRSS))

Areas Inspected:

Routine, unannounced physical-security: inspection involving:

Security Plan and Procedures; Management Support and Effectiveness; Security Program Audit; Access Control - Personnel; Assessment Aids; Personnel Training-

.!

and Qualifications; TI 2515/102 " Land Vehicle Bomb Contingency Procedure Verification" (SIM No. MPA L9-07) and review. of-previous inspection findings.

!

Results: The licensee was found to be in compliance with NRC _ requi-ements in the areas examined.

!

Licensee management attention to and involvement in. security performance is good.

Licensee resources are adequate and performance meets regulatory l

requirements.

>

l U

9005020020 900425 PDR ADOCK 05000155 O

PDC e

_ _.....

....

,

!

j

+

.,

'

_;

..

'

'

-..

..

DETAILS 1.

Key Persons Contacted

,

L In additior.: to the key members of the licensee's staff listed below, the inspector interviewed other licensee employees and members of the security organization. The asterisk (*) denotes those present at the

' ;

Exit Interview conducted on April 12, 1990.

Due to April 13, 1990 being.

l a plant holiday, the exit was held on April 12,1990 ~but the inspection L

officially did not end until April' 13, 1990.

l L

W. Beckman, Plant Manger, Consumers Power Company (CPCo)

.

,

L

  • G. Withrow, Engineering Superintendent, CPCo.
  • B. Alexander, Technical Engineer, CPCo l
  • B. Rabideau, Property Protection Operations Supervisor, CPCo
  • D. Zastrow,' District Manager, Burns International Security Services lac.

t (BISSI)'

.

  • R. Baker, Security Captain, BISSI

,

  • E. Plettner, Senior Resident Inspector, NRC Region III N. Williamson, Resident Inspector,;NRC Region III.

2.

Followup on a Generic Letter (IP 92703)

,

r l

(Closed) Land Vehicle Bomb Contingency Procedure-Verification -Ter;m.* cry-Instruction 2515/102))

Generic Letter 89-07, dat'ed April 28, 1989, and its enclosure, provided guidance for licensees-to consider in. planning for a land vehicle' bomb

_

potential threat. Generic Letter 89-07 also required licensees to

'

confirm in writing, within 180 days from the date _of receipt' of the a

generic letter, that they have included in their safeguards contingency-planning those short-term actions that could be taken to cope with the land vehicle bomb threat.

,

The licensee provided the written confirmation by letter dated November 2, 1989, stating that their safeguards contingency: plan had been revised to include short-term measures that could be taken to protect against

,

attempted radiological sabotage involving a land vehicle bomb.

The inspector verified by interviews and a review-of records that the safeguards contingency plan and appropriat9 safeguards' contingency inplementing procedure were' revised to ir.:Tuded planning _ to. counter the

-

H 1and vehicle bomb threat. Also, the inspector verified that the y

procedure addressed the possibility of receiving a warning from the NRC; j

about the threat and that resources needed to implement short-range

'

contingency measures are available. This item is closed.

.

}

-

,

,

'

...

.

-

r i

..,

.

3. -

Entrance and Exit lncerviews (IP 30703)

j Atthebeginning.oftheinspection~,IMr.;B.Rabideau,theProperty l

a.-

Protection Operations Supervisor, was informed of the purpose of.

!

this visit and the functional areas to be examined, i

b.

The inspector met with the licensee representatives denoted in Section 1-at.the conclusiow of the inspection'on April 12,-1990.

,

A general description of the scope of,the inspection was provided.

Briefly listed below are the findings discussed during.the exit:

. interview.

Included below is e statement'provided by or' describing

'

licensee management's response to each finding,

,

(1) The licensee acknowledged.the inspector's comtents. regarding'.

b the closure of T1 2515/102 entitled " Land Vehicle Bomb..

Contingency Procedure Verification,"

g

'(2) The licensee representatives were advised that no viol'ations o'r open items were noted during this inspection _and that although.

,

the. previously identified concerns involving,the vital.~ areal

!

doors and CCTV are improving, continued management, support.for.

l resolution is needed.

This area will be monitored closely during future inspections.

l 4.

Clear Functional / program Areas Inspected (MC0610):

Listed below are the areas which were examined by the inspector within the. scope of these~ inspection activities in which no = violations, deviations,

,

unresolved or open items were. identified.

These areas'were reviewed and evaluated as c;eemed necessary by the irapector to. meet the specified

,

" Inspection Requirements" (Section102) or the applicable NRC. Ins'pection-

Procedure (IP) as-applicable to the security plan. -Sampling reviews

' included interviews, observations, testing of equipment, documentation

.

review and at times drills or exercises ~that provide. independent

~

i verification of your ability to meet security commitments. LThe depth.

,

and. scope of activities were conducted as deemed appropriate and L

necessary for the Program Area and operational status of the security

,

'

system.

' Number Program Area and Inspr. tion Requirements Reviewed 81018'

Security Plan / Implementation Procedures: -(01) Review Changes;=

l (02) Management of Security Procedure Development;>

(03) Evaluate Administrative Procedures; (04) Evaluate a

Procedures; (05) Evaluate Changes to Procedures.

,i

,

81020 Management Effectiveness:

(01)-Effectiveness in Administering Security Program; (02) Management: Awareness:and Attitude.

81034 Security Program Audit:

(01) Frequency of Audit, (02)' Audit Personnel; (03) Comprehensiveness of Audit; (04) Audit Report';

'(05) Quality of Audit; (06). Audit Report.. Findings; (07)- Response

'

to Audit Recommendations.

..

'l

,

'

. -.

,

.-

-

-

'

y 3;

,

,

,

,

.

,

,

,

,

,

>L~-

.-J

.

'

m

,

,

,

,

..

..

81066 Assessment Aids: (01) Provisions'of Assessment' Aids; l

'

'

,(02) Adequacy of-Assessmen't' Aids;L(03) Protected Area.

j Assessment LAids; (04) CASLand. SAS Monitoring;/ (05) System"

{

Security;-(06) Eye ' Augmentation'. Equipment;-(08) Posts Used

.for Assessment.

,

-

81070'

Access Control - personnel:

(01) General Access Control

.

,.

' Requirements;-(02) Protected' Area Access Control;'(03) Vital Area-Access Controli:(04) Control'ofLActivities and Conditions;

'

,

.in Protected.and Vitel Areas 'and Identification and Actr.oriza,.

.t tion; (05) Badging; (06)l Searching.and Search Equipment;_

.

-!

!

(07_) Escorting; (08) Access Control. Facilities' and Equipment.-

.'

,

s 81501 Training and Qualification ~- General Requirements:.

I (01) General Requirements; ~ (02) Trainingcand(Qualification:-

"j Program;- (03) General Training; '(04)- Demonstration' of -

Abilities; (05) Documentation;.-(06); Empioyment. Suitability:.

fr and Qualificar. ion Criteria;L(07), Physical Fitnass-;.

.

Qualif.ication;:(08) Security-Knowledges,; Skills, and.

'

Abilities;.(10) Requalification; (11) Weaporis Qualification

and Requalification Progren; (12) Equipment-for Guards,

'

Armed Response Personnel, and Armed. Escorts; (13).Co.ntract.

Personnel.

-

j i

>

q

!

i

-

\\

~

[

l; i'.

4f'

.

,

4'

jr

.

.,

qum

.

.