ML20034C082

From kanterella
Jump to navigation Jump to search
Forwards Requalification Exam Rept 50-266/OL-90-01 Administered During Wk of 900326
ML20034C082
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 04/24/1990
From: Wright G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Fay C
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML20034C083 List:
References
NUDOCS 9005020048
Download: ML20034C082 (2)


Text

p r

l

. APR 2 4' 1990 Docket No. 50-266 Docket'No. 50-301 Wisconsin Electric Power Company.

I

-ATTH: Mr. C.

W.. Fay Vice President I

Nuclear Power 231 West Michigan Street.- P379 i

-Milwaukee, WI 53201

. Gentlemen:

1

SUBJECT:

REQUALIFICATION EXAMINATION REPORT During the week of March-26,.1990, the NRC adininistered requalification -

examinations to employees of your organization who operate your Point Beach Nuclear Plant. At the conclusion of the examination, any generic findings.

that evolved as a result of the. examinations were discussed with those members of your staff identified in the enclosed report.

As a result of this evaluation' of-your requalification program, it-has been l

assigned an uveral', program rating of satisfactory.in accordance with-the-criteria of NUREG-1021, ES 601.

For those individuals with unsatisfactory results, the facility should'take corrective action as required by its.

approved requalification program.

In accordance with 10 CFR 2.790 of-the Commission's regulations,:a copy of this letter and the enclosures will be placed in the NRC Public Document Room.

Should you have any questions concerning this examination', please contact us.

~

Sincerely, M. J. Jordan.for

~

Geoffrey C. Wright, Chief Operations. Branch

Enclosures:

4 1.

Examination Report

,J8 No. 50-266/0L-90-01 Jg' 2.

Examination and gg Answer Key o.o See Attached Distribution g.

18 Se

-h RIII rig RIII RJ

j. b Damof"/dg Burf"ick c W W

NY

(

l

(\\

4 y

g4

j wmc_'i n

^

g.,

.y

<l w

q-7 f

'[ p -

~

d s

h LWisconsin' Electric. Power Company.

- 2l APff211n4

[^f l

EDistribution-J 1

y-cc w/ enclosures:-

'J. JB Zach,. Plant ManagerL DCD/DCB (RIDS)'

4 4

Licensing F.ee^ Management: Bra'nchi

%i Resident inspector,- RIIIL

~i

. Virgil Kanable, Chief-1 Boiler Section.,

E Charles Thompson,: Chriirman

/

ll

/ Wisconsin Public!Ser,icei 1

Comission j

R. t 1. - Braund: (SLO); -

'H

?!

-WI Div.-of' Emergency Government--

1..

4

'Teri L.LVierima', Chief-Radiation Protectio'n-Section g,

1:1 Wl: Departmentiof' Health and.::

-Social Services,:.Divisionc l.)

of Health R.-. Zyduck,- Plant' Training ; Manager !

1

- W. H.4 Swensen, Project Manager,: NRR.

l

s.,

R, Gruel. ; Contract. Exam Supervisor::

~

I j

)

k t

6 41

-I N

-}

s

+

k t

I

  • (

a-q l.

I

~

s r

f f

3 e

s--

s y

y

+

4

+

t

.c'--

p