Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20040B673 + (03:17:51, 20 December 2024)
- ML20040B672 + (03:17:52, 20 December 2024)
- ML20040B671 + (03:17:53, 20 December 2024)
- ML20040B670 + (03:17:54, 20 December 2024)
- ML20040B667 + (03:17:55, 20 December 2024)
- ML20040B666 + (03:17:56, 20 December 2024)
- ML20040B665 + (03:17:58, 20 December 2024)
- ML20040B664 + (03:17:59, 20 December 2024)
- 05000364/LER-1981-056, Forwards LER 81-056/01T-0 + (03:18:00, 20 December 2024)
- ML20040B661 + (03:18:01, 20 December 2024)
- ML20040B660 + (03:18:03, 20 December 2024)
- ML20040B658 + (03:18:04, 20 December 2024)
- ML20040B657 + (03:18:04, 20 December 2024)
- ML20040B656 + (03:18:05, 20 December 2024)
- ML20040B654 + (03:18:06, 20 December 2024)
- IR 05000295/1981026 + (03:18:11, 20 December 2024)
- ML20040B652 + (03:18:12, 20 December 2024)
- ML20040B651 + (03:18:13, 20 December 2024)
- 05000259/LER-1981-092-03, /03L-0:on 811218,reactor Water Cleanup Sys Floor Drain High Temp Switch on Units 1 & 2 Did Not Meet Seismic Installation Requirements.Caused by Incorrect Installation of Temp Switch.Switch Repaired + (03:18:15, 20 December 2024)
- ML20040B647 + (03:18:16, 20 December 2024)
- ML20040B646 + (03:18:16, 20 December 2024)
- ML20040B645 + (03:18:17, 20 December 2024)
- ML20040B644 + (03:18:18, 20 December 2024)
- ML20040B640 + (03:18:21, 20 December 2024)
- ML20040B638 + (03:18:22, 20 December 2024)
- 05000259/LER-1981-092, Forwards LER 81-092/03L-0 + (03:18:24, 20 December 2024)
- ML20040B634 + (03:18:26, 20 December 2024)
- ML20040B633 + (03:18:27, 20 December 2024)
- ML20040B632 + (03:18:27, 20 December 2024)
- ML20040B631 + (03:18:28, 20 December 2024)
- PNO-III-82-009, leak of 1.5 Gpm Discovered in 6-inch Reactor Water Cleanup Pipe.Ultrasonic Testing of Cleanup Piping Sys from Reactor to HXs Begun W/Unit Shut Down + (03:18:29, 20 December 2024)
- IR 05000155/1981018 + (03:18:31, 20 December 2024)
- ML20040B623 + (03:18:32, 20 December 2024)
- ML20040B625 + (03:18:32, 20 December 2024)
- ML20040B622 + (03:18:33, 20 December 2024)
- ML20040B621 + (03:18:37, 20 December 2024)
- PNO-V-82-005, on 820115,NRC Received Ga Co Notification of Potential Finding Through Facility Seismic Design Verification Process.Cantilevered Line Branching Off Safety Injection Line Was Not in Computer Model + (03:18:39, 20 December 2024)
- ML20040B616 + (03:18:40, 20 December 2024)
- ML20040B614 + (03:18:41, 20 December 2024)
- ML20040B615 + (03:18:41, 20 December 2024)
- ML20040B613 + (03:18:42, 20 December 2024)
- ML20040B611 + (03:18:44, 20 December 2024)
- ML20040B610 + (03:18:45, 20 December 2024)
- 05000296/LER-1981-074-01, /01T-0:on 811230,2-stage Relief Valves Initially Failed to Lift within Allowable Range During as-found Set Pressure Tests.Cause Under Evaluation.Valves Will Be Reset, Repaired & Retested Prior to Installation + (03:18:47, 20 December 2024)
- ML20040B606 + (03:18:49, 20 December 2024)
- ML20040B605 + (03:18:50, 20 December 2024)
- IR 05000298/1981023 + (03:18:52, 20 December 2024)
- ML20040B603 + (03:18:59, 20 December 2024)
- ML20040B602 + (03:19:00, 20 December 2024)
- ML20040B601 + (03:19:01, 20 December 2024)
- ML20040B600 + (03:19:02, 20 December 2024)