Forwards IE Insp Repts 50-295/81-26 & 50-304/81-23 on 811002-1130.No Noncompliance Noted
ML20040B638
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 01/13/1982
From: Spessard R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20040B639 List:
References
NUDOCS 8201260275
Download: ML20040B638 (2)


See also: IR 05000295/1981026

Text

f

.

4

GAN 1 3 082

, ! r g% /

-

,

' < '3

Docket No. 50-295

'u

'

'

Docket No. 50-304

'

i

Commonwealth Edison Company

7

'!

-

ATTN: Fir . Cordell Reed

!

N

Vice President

Post Office Box 767

/

Chicago, IL 60690

/

.-

Gentlemen:

This refers to the routine safety inspection conducted by Flessrs.

J. E. Kohler and J. R. Waters of this office on October 2 - November 30,

1981, of activities at Zion Nuclear Power Station, Units 1 and 2,

authorized by NRC Operating Licenses No. DPR-39 and No. DPR-48 and to

the discussion of our findings with Mr. K. Graesser at the conclusion

of the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted

of a selective examination of procedures and reeresentative records,

observations, and interviews with personnel.

No items of noncompliance with NRC requirements were identified during

the course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

of this letter and the enclosed inspection report will be placed in the

NRC's Public Document Room.

If this report contains any information

that you (or your contractors) believe to be exempt from disclosure under

10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-

-

phone within ten (10) days from the date of this letter of your intention

to file a request for withholding; and (b) submit within twenty-five (25)

l

days from the date of this letter a written application to this of fice

to withhold such information.

If your receipt of this letter has been

0$hhb

PDR

%D l

~~~ S

/

i

-

t

.

!

Commonwealth Edison Company

-2-

January 13, 1982

delayed such that less than seven (7) days are available for your review,

please notify this office promptly so that a new due date may be estab-

lished.

Consistent with Section 2.790(b)(1), any such application must

be accompanied by an affidavit executed by the owner of t.he information

which identifies the document or part sought to be withheld, and which

contains a full statement of the reasons which are the bases for the

claim that the information should be withheld from public disclosure.

This section further requires the statement to address with specificity

the considerations listed in 10 CFR 2.790(b)(4). The information sought

to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within

the specified periods noted above, a copy of this letter and the enclosed

inspection report will be placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

R. L. Spessard, Director

Division of Resident and

Project Inspection

Enclosure:

Inspection

Report No. 50-295/81-26

and No. 50-304/81-23

cc w/ encl:

Louis 0. De1 George, Director

of Nuclear Licensing

K. Graesser, Station

Superintendent

DrlB/Docuruent Control Desk (RIDS)

Resident Inspector, RIII

tiary Jo Flurray, Office of

Assistant Attorney General

tiayor John B. Spencer

City of Zion

RIII

R I

RIII

RIII .

RIf'I

/[Ko i e /jp

Ah

F1ill)er

.fC(

M

l'

L

Hayes

Knop

Spe ,a d

' '

1/5/82

i, s/9

[(/ V2-