ML20040B616

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-155/81-18 on 811115-1215.No Noncompliance Noted
ML20040B616
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 01/12/1982
From: Spessard R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dewitt R
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML20040B617 List:
References
NUDOCS 8201260250
Download: ML20040B616 (2)


See also: IR 05000155/1981018

Text

!

.

.

'JAN 1 2 G82

-ry%

f'

'

/

Oh

Docket No. 50-155

6

h,

/

vs

Consumers Power Company

,

ATTN: fir. R. B. DeWitt

l

'

i

,

Vice President

'/

Nuclear Operations

212 West flichigan Avenue

./

Jackson, t!! 49201

-

Gentlemen:

This refers to the routine safety inspection conducted by fir. fl. E. Parker

of this of fice on November 15 - December 15, 1981, of activities at Big

Rock Point Nuclear Plant authorized by NRC Operating License No. DPR-06

and to the discussion of our findings with tir. C. J. Hartman at the con-

clusion of the inspection.

The enclosed copy of our inspection report identifies areas examin d during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

In accordance with 10 CFT. 2.790 of the Commission's regulations, a copy

of this letter and the'enctosed inspection report will be placed in the

NRC's public Document Room.

If this report contains any information

that you (or your contractors) believe to be exempt from disclosure under

10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-

phone within ten (10) days from the date of this letter of your intention

'

to file a request for withholding; and (b) submit within twenty-five (25)

'

uays from the date of this letter a written application to this office

to withhold such information.

If your receipt of this letter has been

delayed such that less than seven (7) days are available for your review,

please notify this office promptly so that a new due date may be estab-

lished. Consistent with Section 2.790(b)(1), any such application must

,

A. g

.

gRADOCKo1260250 820112

-

05000155

g

} hO l

PDR

s;

i//

- .

.

.

Consumers Power Company

-2-

January 12, 1982

be accompanied by an affidavit executed by the owner of the information

which identifies the document or part sought to be withheld, and which

contains a full statement of the reasons which are the bases for the

claim that the information should be withheld fram public disclosure.

This section further requires the statement to address with specificity

the ecnsiderations listed in 10 CFR 2.790(b)(4). The information sought

to be withheld shall be incorporated as far as possible into a separate

part of the af fidavit.

If we do not hear f rom you in this regard within

the specified periods noted above, a copy of this letter and the enclosed

inspection report will be placed in the Public Document Rocm.

We will gladly di:: cuss any questions you have concerning this inspection.

Sincerely,

"Orfginni signed by R.L. Spessard"

R. L. Spessard, Director

Division of Resident and

Project inspection

Enclosure:

Inspection

Report No. 50-155/81-18

cc w/ encl:

D. P. Iloffman, Nuclear

Licensing Administrator

C. J. Ilartman, Plant

Superintendent

DNH/ Document Control Desk (RIDS)

Resident Inspector, Rill

Ronald Callen, Michigan

Public Service Commission

<

.

i

'

b'[ j

Rill

Rill

RIII

,

Kno[pLW

l

f

SpIshard

o

Boyd/jp

1/5/82

g jd, I

jl j)/