Text
!
.
.
'JAN 1 2 G82
-ry%
f'
'
/
Oh
Docket No. 50-155
6
h,
/
vs
Consumers Power Company
,
ATTN: fir. R. B. DeWitt
l
'
i
,
Vice President
'/
Nuclear Operations
212 West flichigan Avenue
./
Jackson, t!! 49201
-
Gentlemen:
This refers to the routine safety inspection conducted by fir. fl. E. Parker
of this of fice on November 15 - December 15, 1981, of activities at Big
Rock Point Nuclear Plant authorized by NRC Operating License No. DPR-06
and to the discussion of our findings with tir. C. J. Hartman at the con-
clusion of the inspection.
The enclosed copy of our inspection report identifies areas examin d during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
In accordance with 10 CFT. 2.790 of the Commission's regulations, a copy
of this letter and the'enctosed inspection report will be placed in the
NRC's public Document Room.
If this report contains any information
that you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
phone within ten (10) days from the date of this letter of your intention
'
to file a request for withholding; and (b) submit within twenty-five (25)
'
uays from the date of this letter a written application to this office
to withhold such information.
If your receipt of this letter has been
delayed such that less than seven (7) days are available for your review,
please notify this office promptly so that a new due date may be estab-
lished. Consistent with Section 2.790(b)(1), any such application must
,
A. g
.
gRADOCKo1260250 820112
-
05000155
g
} hO l
s;
i//
- .
.
.
Consumers Power Company
-2-
January 12, 1982
be accompanied by an affidavit executed by the owner of the information
which identifies the document or part sought to be withheld, and which
contains a full statement of the reasons which are the bases for the
claim that the information should be withheld fram public disclosure.
This section further requires the statement to address with specificity
the ecnsiderations listed in 10 CFR 2.790(b)(4). The information sought
to be withheld shall be incorporated as far as possible into a separate
part of the af fidavit.
If we do not hear f rom you in this regard within
the specified periods noted above, a copy of this letter and the enclosed
inspection report will be placed in the Public Document Rocm.
We will gladly di:: cuss any questions you have concerning this inspection.
Sincerely,
"Orfginni signed by R.L. Spessard"
R. L. Spessard, Director
Division of Resident and
Project inspection
Enclosure:
Inspection
Report No. 50-155/81-18
cc w/ encl:
D. P. Iloffman, Nuclear
Licensing Administrator
C. J. Ilartman, Plant
Superintendent
DNH/ Document Control Desk (RIDS)
Resident Inspector, Rill
Ronald Callen, Michigan
Public Service Commission
<
.
i
'
b'[ j
Rill
Rill
RIII
,
Kno[pLW
l
f
SpIshard
o
Boyd/jp
1/5/82
g jd, I
jl j)/