ML20040B666
| ML20040B666 | |
| Person / Time | |
|---|---|
| Site: | La Crosse File:Dairyland Power Cooperative icon.png |
| Issue date: | 01/19/1982 |
| From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| Shared Package | |
| ML20040B659 | List: |
| References | |
| NUDOCS 8201260300 | |
| Download: ML20040B666 (2) | |
Text
. -,
O tto
+*
UNITED STATES
- # 8" NUCLEAR REGULATORY COMMISSION n
.E REGION ill 8
799 ROOSEVELT ROAD Q,
,s
$t GLEN ELLYN, ILLINOl$ 40137 January 19, 1982 NOTICE OF SIGNIFICANT LICENSEE MEETING Name of Licensee: Dairyland Power Cooperative Name of Facility: Lacrosse Boiling Water Reactor Docket No.
50-409 Date and Time of Meeting: January 22, 1982, 10:00 a.m.
(CST)
Mecting Location:
U. S. Nuclear Regulatory Commission Region III Office 799 Roosevelt Road Glen Ellyn, IL 60137 i
Purpose of Meeting: Enforcement conference to discuss potential NRC actions related to the March 16, 1981, event involving operation on the main steam bypass valve at power and to discuss licensee corrective actions.
j l
1 Region III Attendees:
J. G. Keppler, Regional Administrator A. B. Davis, Deputy Regional Administrator R. F. Warnick, Director, Enforcement and Investigation Staff R. L. Spessard, Director, Division of Resident and Project Inspection J. F. Streeter, Chief, Projects Branch 2 D. R. Ilunter, Section Chief, Projects Section 2B L. G. McGregor, Projects Inspector, Projects Section 2B M. W. Branch, Resident Inspector, LACBWR Site W. L. Forney. Senior Resident Inspector, Byron Station j
Others as designated by Region III.
Licensee Attendees:
l j
J. Taylor, Assistant General Manager for Power R. Shimshak, Plant Superintendent J. Parkyn, Assistant Plant Superintendent G. Boyd, Operations Supervisor i
l
- 11. Towsley, Quality Assurance Supervisor Others ne designated by the licensee.
NOTE: Attendance by NRC personnel at the Region III/ Licensee meeting should be made known by 3:00 p.m., CST, January 21, 1982, via telephone call to J. F. Streeter, Region III, FTS 384-2541.
Distribution:
J. Taylor, Director, Division of Reactor Programs E. L. Jordan, Director, Division of Engineering and Quality Assurance J. Leiberman, Acting Director, Enforcement Staff 8201260300 gggggo t
gDRADOCK 05000409 PDR I
-. _ _- =_.
Ja
' Distribution:
G. Lainas, Assistant Director for Safety Assessment, !!RR D. M. Crutchfield, Chief, ORB 5, iiRR J. P. Murray, Jr., Director, Rulemaking and Enforcenent Division, ELD