Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20040C944 + (02:58:11, 20 December 2024)
- 05000335/LER-1981-061-03, /03L-0:on 811221,routine Surveillance Revealed That HCV-14-8B Would Shut Only 70% of Full Stroke.Caused by Leaking Air Supply Control Solenoid.Solenoid Replaced + (02:58:13, 20 December 2024)
- ML20040C942 + (02:58:14, 20 December 2024)
- ML20040C941 + (02:58:15, 20 December 2024)
- 05000335/LER-1981-061, Forwards LER 81-061/03L-0 + (02:58:17, 20 December 2024)
- 05000321/LER-1981-142-03, /03L-0:on 811225,reactor Water Conductivity Increased Above Tech Spec Limit.Caused by Tube Leaks of Waterbox C in Condenser B Due to Turbine Bucket & Diaphragm Metal Impingement.Turbines Repaired & Tubes Plugged + (02:58:19, 20 December 2024)
- ML20040C937 + (02:58:20, 20 December 2024)
- ML20040C936 + (02:58:21, 20 December 2024)
- ML20040C935 + (02:58:22, 20 December 2024)
- ML20040C933 + (02:58:23, 20 December 2024)
- 05000321/LER-1981-142, Forwards LER 81-142/03L-0 + (02:58:24, 20 December 2024)
- IR 05000546/1981024 + (02:58:26, 20 December 2024)
- ML20040C929 + (02:58:28, 20 December 2024)
- ML20040C927 + (02:58:29, 20 December 2024)
- ML20040C925 + (02:58:30, 20 December 2024)
- ML20040C924 + (02:58:30, 20 December 2024)
- ML20040C923 + (02:58:31, 20 December 2024)
- ML20040C922 + (02:58:31, 20 December 2024)
- PNO-V-82-007, on 820125-29,network of 40 Emergency Alert Sirens for Plume Exposure Pathway Zone Will Be Tested.Sirens Will Be Heard within Radius of About 10 Miles from Site + (02:58:33, 20 December 2024)
- IR 05000271/1981020 + (02:58:39, 20 December 2024)
- ML20040C919 + (02:58:40, 20 December 2024)
- ML20040C917 + (02:58:41, 20 December 2024)
- ML20040C916 + (02:58:42, 20 December 2024)
- ML20040C913 + (02:58:44, 20 December 2024)
- ML20040C912 + (02:58:44, 20 December 2024)
- ML20040C911 + (02:58:45, 20 December 2024)
- ML20040C909 + (02:58:46, 20 December 2024)
- ML20040C908 + (02:58:46, 20 December 2024)
- ML20040C904 + (02:58:47, 20 December 2024)
- ML20040C901 + (02:58:48, 20 December 2024)
- ML20040C900 + (02:58:49, 20 December 2024)
- 05000312/LER-1981-058-03, /03L-0:on 811221,repts Required by Tech Specs 4.2.8 Re Cumulative Reactor Utilization Factor Had Not Been Written Since Jul 1980.Generation Engineering Is Writing Rept + (02:58:50, 20 December 2024)
- 05000324/LER-1981-139-03, /03L-0:on 811220,during Reactor Core Isolation Cooling Exhaust Diaphragm High Pressure Channel Test, 2-E51-PS-NO12A & C Did Not Actuate W/Test Signal Applied. Caused by Corrosion from Moisture on Switch Internals + (02:58:55, 20 December 2024)
- ML20040C897 + (02:58:59, 20 December 2024)
- 05000312/LER-1981-058, Forwards LER 81-058/03L-0 + (02:59:01, 20 December 2024)
- 05000324/LER-1981-139, Forwards LER 81-139/03L-0 + (02:59:02, 20 December 2024)
- ML20040C892 + (02:59:03, 20 December 2024)
- 05000259/LER-1981-085-03, /03L-0:on 811211,HPCI Suppression Chamber High Level Switches Discovered to Be Set 8 Inches Above Normal Level.Caused by Change to Tech Specs Not Being Reflected in Table 3.2.B.Switches Physically Lowered + (02:59:08, 20 December 2024)
- ML20040C887 + (02:59:10, 20 December 2024)
- 05000259/LER-1981-085, Forwards LER 81-085/03L-0 + (02:59:11, 20 December 2024)
- 05000335/LER-1981-054-03, /03L-0:on 811207,during QC Review of Records,Noted That Nov Surveillance on 1C Intake Cooling Water Pump Had Not Been Done on 811116.Cause Not Stated.Surveillance Run on Pump Satisfactorily Completed on 811218 + (02:59:13, 20 December 2024)
- ML20040C882 + (02:59:14, 20 December 2024)
- ML20040C881 + (02:59:15, 20 December 2024)
- 05000335/LER-1981-054, Forwards LER 81-054/03L-0 + (02:59:16, 20 December 2024)
- 05000335/LER-1981-052-03, /03L-0:on 811210,more than Three Incore Detector Alarms in Alarm Condition & Appropriate Action Not Taken. Caused by vendor-supplied Software Utilizing Incorrect Flux Inputs in Arriving at Setpoints + (02:59:18, 20 December 2024)
- IR 05000361/1981030 + (02:59:20, 20 December 2024)
- ML20040C876 + (02:59:20, 20 December 2024)
- ML20040C874 + (02:59:22, 20 December 2024)
- 05000335/LER-1981-052, Forwards LER 81-052/03L-0 + (02:59:23, 20 December 2024)
- ML20040C871 + (02:59:25, 20 December 2024)
- ML20040C870 + (02:59:26, 20 December 2024)
- ML20040C869 + (02:59:27, 20 December 2024)