ML20040C917

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-271/81-20 on 811201-820104.No Noncompliance Noted
ML20040C917
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 01/15/1982
From: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Rich Smith
VERMONT YANKEE NUCLEAR POWER CORP.
Shared Package
ML20040C918 List:
References
NUDOCS 8201290373
Download: ML20040C917 (2)


See also: IR 05000271/1981020

Text

'

. .

.

.

f

)

v

V

[

e

JAN 151982

}f

REcygygg

Docket No. 50-271

Vemont Yankee fluclear Power Corporation

bn

0 I382 A 52

ATTH: 11r. Robert L. Smith

tznj'?c/r crvng

-

9

na N

Licensing Engineer

d

1671 Worcester Road

[

4

Franingham, flassachusetts 01701

w

'

Gentlenen:

Subject:

Inspection 50-271/81-20

e

i

This refers to the inspection conducted by Mr. W. Raymond of this office on

~

December 1,1981 to January 4,1982, a t the Vemont Yankee Nuclear Power

Station, Vernon, Vermont, of activities authorized by HRC License No. DPR-28

and to the discussions of our findings held by Mr. S. Collins with Mr. fiurphy

and other menbers of your. staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Irispection

and Enforcenent Inspection Report which is enclosed with this letter. Within

these areas, the inspection consisted of selective examirati6ns of procedures

and representative records, interviews with personnel, and observations by the

inspector.

Uithin the scope of this inspection, no items of noncompliance were observed.

In accordance with 10 CFR 2.790 of the Commission!.s regulations, a copy of

-

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

If this report contains any infomation that you (or

l

your contractor) believe to be exempt from disclosure under 10 CFR 9.5(a)(4),

!

it is necessary that you (a) notify this office by telephone within ten (10)

days from the date of this letter of your intention to file a request for

!

withholding; and (b) submit within 25 days from the date of this letter a

,

written application to this office to withhold such infomation. Consistent

with section 2.790(b)(1), any such application must be accompanied by an

affidavit executed by the owner of the infomation which identifies the

,

docuaent or part sought to be withheld, and which contains a full statement

of the reasons on the basis which it is clained that the information should

be withheld from public disclosure. This section further requires the state-

nent to address with specificity the considerations listed in 10 CFR 2.790

(b)(4).

The infomation sought to be withheld shall be incorporated as far

as possible into a separate part of the affidavit.

If we do not hearifrom

you in this regard within the specified periods noted above, the report will

be placed in the Public Docunent Room. The telephone notification of your

.

,

-

._

. - -

__RI

_

R

_

I:EIB

RI:RP [

.d n

k. ' a

dt/. T.

in

E. Br nner

G

\\W(~h1

Vlf

W.

l

,

0 ICIAL RECORD COPY

,

>

82015290373 820115

-

--

PDR ADOCK 05000271

-

.

.

,

.

.

u

O

7

I UF2

Vemont Yankee Nuclear

Power Corporation

2

.

intent to request withholding, or any request for an extension of the 10 day

period which you believe necessary, should be made to the Supervisor, Files,

Mail and Records, USNRC Region I, at (215) 337-5223.

fio reply to this letter is required. Your cooperation with us in this matter

"

is appreciated.

Sincerely,

- [

I

'OA

si m 37,

R. W. Starostecki, Di

ctor

'

ivision of Resident and

i

Project Inspection

g

Enclosure: Office of Inspection and Enforcement.

Inspection Report Number 50-271/81-20

cc w/ enc 1:

Mr. W. P. Murphy, Plant Manager

fir. W. F. Conway, President and Chief Operating Officer

Mr. E. W. Jackson,!!anager of Operations

Mr. L. H. Heider Vice President

PublicDocumentRoom(PDR)

Local Public Document Room (LPDR)

Nuclear Safety Infomation Center (NSIC)

HRC Resident Inspector

State of New Hampshire

State of Vemont

bcc:

Region I Document Room (with concurrences)

Chief, Operational Support Section (w/o encis)

.

{

Mr. V. Rooney, NRR, VY License Project Manager

i

!

i

.

,

OFFICIAL RECORD COPY

t

a