Person / Time | |
---|---|
Site: | Satsop |
Issue date: | 02/27/1981 |
From: | WALLACE/SUPERIOR CONSTRUCTION CO. |
To: | |
Shared Package | |
ML20040C890 | List: |
References | |
IOP-1.0, NUDOCS 8201290363 | |
Download: ML20040C909 (8) | |
Similar Documents at Satsop | |
---|---|
Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20082A8081995-03-31031 March 1995
[Table view]WPPSS Nuclear Projects 1,3,4 & 5 Restoration Plan ML20073P9491991-05-13013 May 1991 Rev 5 to WMC-051, WNP-3 Preventive Maint Requirements by Equipment Type ML20042G4001990-05-11011 May 1990 Revised WMC-051, Washington Nuclear Plant-3 Preservation of Assets Program. ML20211G7021986-08-31031 August 1986 Rev 4 to Procedure WMC-050A, Mgt Plan for Extended Const Delay of WNP-3,Executive Summary (Levels I-III) ML20081C2141983-10-21021 October 1983 Draft Ecological Monitoring Preoperational/Operational Program ML20078H4771983-08-0404 August 1983 Mgt Plan for Extended Const Delay of WNP-3 (Level II) ML20072N4341983-07-12012 July 1983 Procedure WMM-025 Control Room Design Review Program Plan for WPPSS Nuclear Project 3 ML20073K1181983-04-14014 April 1983 Rev 0 to Program Plan for TMI Improvements Integration Effort for WPPSS Unit 3. W/One Oversize Drawing.Aperture Card Is Available in PDR ML20113F6601983-02-0303 February 1983 Rept on Qualification Tests for D60-01 Cable Contract 3240-62B WPPSS Nuclear Project 3 W/Insulation Indents for Class 1E Svc in Nuclear Generating Stations ML20090F7221982-10-28028 October 1982 Testing of Size 2A Figure 215 Stiff Clamp Oven-Heated to 650 F ML20080C6161982-08-15015 August 1982 Rev 9 to Procedure PKS-EP-6, Pressure Test Procedure for Piping & Components ML20096H6871981-10-14014 October 1981 Rev 3 to Mgt Plan for Extended Const Delay of WPPSS Units 4 & 5 ML20040C9091981-02-27027 February 1981 Compliance W/10CFR21. 1995-03-31 Category:TEST/INSPECTION/OPERATING PROCEDURES MONTHYEARML20082A8081995-03-31031 March 1995
[Table view]WPPSS Nuclear Projects 1,3,4 & 5 Restoration Plan ML20073P9491991-05-13013 May 1991 Rev 5 to WMC-051, WNP-3 Preventive Maint Requirements by Equipment Type ML20042G4001990-05-11011 May 1990 Revised WMC-051, Washington Nuclear Plant-3 Preservation of Assets Program. ML20211G7021986-08-31031 August 1986 Rev 4 to Procedure WMC-050A, Mgt Plan for Extended Const Delay of WNP-3,Executive Summary (Levels I-III) ML20081C2141983-10-21021 October 1983 Draft Ecological Monitoring Preoperational/Operational Program ML20078H4771983-08-0404 August 1983 Mgt Plan for Extended Const Delay of WNP-3 (Level II) ML20072N4341983-07-12012 July 1983 Procedure WMM-025 Control Room Design Review Program Plan for WPPSS Nuclear Project 3 ML20073K1181983-04-14014 April 1983 Rev 0 to Program Plan for TMI Improvements Integration Effort for WPPSS Unit 3. W/One Oversize Drawing.Aperture Card Is Available in PDR ML20080C6161982-08-15015 August 1982 Rev 9 to Procedure PKS-EP-6, Pressure Test Procedure for Piping & Components ML20096H6871981-10-14014 October 1981 Rev 3 to Mgt Plan for Extended Const Delay of WPPSS Units 4 & 5 ML20040C9091981-02-27027 February 1981 Compliance W/10CFR21. 1995-03-31 |