Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20040D907 + (02:37:32, 20 December 2024)
- ML20040D906 + (02:37:32, 20 December 2024)
- ML20040D905 + (02:37:33, 20 December 2024)
- ML20040D904 + (02:37:33, 20 December 2024)
- ML20040D902 + (02:37:35, 20 December 2024)
- ML20040D900 + (02:37:35, 20 December 2024)
- PNO-I-82-009B, on 820125,site Emergency Due to Steam Generator Tube Rupture,Was Downgraded to Alert.Cooldown of RHR Sys Began 820126.No Fuel Failures Found.Surveys Indicate No Radiation Levels Above Background + (02:37:37, 20 December 2024)
- ML20040D898 + (02:37:39, 20 December 2024)
- ML20040D896 + (02:37:40, 20 December 2024)
- ML20040D897 + (02:37:40, 20 December 2024)
- ML20040D894 + (02:37:41, 20 December 2024)
- 05000278/LER-1981-022-03, /03L-0:on 811221,during Surveillance Testing, Torus High Level Switches 3-23-91-A & B Determined to Be Out of Calibr by 1/2 Inch.Instruments Are Robertshaw Type 83035-A2.Caused by Setpoint Drift.Instruments Recalibr + (02:37:43, 20 December 2024)
- ML20040D892 + (02:37:44, 20 December 2024)
- ML20040D889 + (02:37:45, 20 December 2024)
- ML20040D890 + (02:37:45, 20 December 2024)
- ML20040D888 + (02:37:46, 20 December 2024)
- ML20040D887 + (02:37:47, 20 December 2024)
- W3P82-0191, Forwards Response to Question of Effect of Spacer Grid Design on DNBR Prediction,Waterford Steam Electric Station, Unit 3, Proprietary & Nonproprietary Versions.Proprietary Version Withheld (Ref 10CFR2.790) + (02:37:48, 20 December 2024)
- ML20040D885 + (02:37:50, 20 December 2024)
- 05000304/LER-1981-037-03, /03L-0:on 811228 & 820118 During Normal Operation, Operator Noticed Steam Generator 2A Feedwater for Steam Flow Channel 2F-510 Spiking High Erratically.Cause Not Stated.Two Capacitors Replaced & Transmitter Adjusted + (02:37:51, 20 December 2024)
- ML20040D883 + (02:37:53, 20 December 2024)
- ML20040D880 + (02:37:54, 20 December 2024)
- ML20040D882 + (02:37:54, 20 December 2024)
- ML20040D877 + (02:37:55, 20 December 2024)
- ML20040D879 + (02:37:55, 20 December 2024)
- 05000304/LER-1981-037, Forwards LER 81-037/03L-0 + (02:37:57, 20 December 2024)
- IR 05000285/1981036 + (02:37:58, 20 December 2024)
- ML20040D873 + (02:38:00, 20 December 2024)
- ML20040D872 + (02:38:01, 20 December 2024)
- B10379, Forwards Evaluation of Millstone Nuclear Power Station + (02:38:02, 20 December 2024)
- IR 05000458/1981014 + (02:38:05, 20 December 2024)
- ML20040D868 + (02:38:06, 20 December 2024)
- ML20040D865 + (02:38:10, 20 December 2024)
- ML20040D863 + (02:38:11, 20 December 2024)
- ML20040D864 + (02:38:11, 20 December 2024)
- ML20040D861 + (02:38:12, 20 December 2024)
- ML20040D860 + (02:38:13, 20 December 2024)
- IR 05000277/1981010 + (02:38:14, 20 December 2024)
- 05000237/LER-1981-080-03, /03L-0:on 811228,w/DIS-500-7 in Progress,Contacts of Time Delay Relay 590-123B/Aux Failed in Energized Position.Caused by Mechanical Binding of Actuating Mechanism.Relay Replaced + (02:38:19, 20 December 2024)
- ML20040D854 + (02:38:21, 20 December 2024)
- ML20040D851 + (02:38:24, 20 December 2024)
- ML20040D850 + (02:38:24, 20 December 2024)
- ML20040D849 + (02:38:25, 20 December 2024)
- 05000255/LER-1981-050-03, Reviews of Documentation Associated W/Repair Work to Pressurizer power-operated Relief Valves Were Found to Be Incomplete.Caused by Personnel Error.Procedures to Be Reviewed + (02:38:26, 20 December 2024)
- ML20040D845 + (02:38:28, 20 December 2024)
- ML20040D846 + (02:38:28, 20 December 2024)
- ML20040D844 + (02:38:29, 20 December 2024)
- ML20040D843 + (02:38:30, 20 December 2024)
- ML20040D841 + (02:38:31, 20 December 2024)
- 05000255/LER-1981-050, Forwards Updated LER 81-050/03X-1 + (02:38:32, 20 December 2024)
- ML20040D838 + (02:38:33, 20 December 2024)