Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19309B204 + (08:46:38, 2 January 2025)
- ML19309B202 + (08:46:41, 2 January 2025)
- ML19309B201 + (08:46:42, 2 January 2025)
- ML19309B200 + (08:46:43, 2 January 2025)
- ML19309B199 + (08:46:44, 2 January 2025)
- ML19309B197 + (08:46:45, 2 January 2025)
- ML19309B196 + (08:46:46, 2 January 2025)
- ML19309B195 + (08:46:47, 2 January 2025)
- ML19309B194 + (08:46:48, 2 January 2025)
- ML19309B192 + (08:46:49, 2 January 2025)
- IR 05000298/1979019 + (08:46:52, 2 January 2025)
- ML19309B189 + (08:46:53, 2 January 2025)
- ML19309B188 + (08:46:54, 2 January 2025)
- ML19309B187 + (08:46:55, 2 January 2025)
- ML19309B186 + (08:46:56, 2 January 2025)
- ML19309B185 + (08:46:57, 2 January 2025)
- ML19309B183 + (08:46:58, 2 January 2025)
- ML19309B182 + (08:46:59, 2 January 2025)
- ML19309B180 + (08:47:01, 2 January 2025)
- ML19309B181 + (08:47:01, 2 January 2025)
- ML19309B178 + (08:47:02, 2 January 2025)
- ML19309B176 + (08:47:03, 2 January 2025)
- ML19309B174 + (08:47:03, 2 January 2025)
- ML19309B173 + (08:47:04, 2 January 2025)
- 05000338/LER-1980-030-03, /03L-0:on 800227,during Normal Operation,B Gaseous Waste Filter Charcoal Adsorber Was Operated for 934-h W/O Lab Analysis of Carbon Sample.Caused by 720-h Limit Not Being Included in Operator Log After Timer Installation + (08:47:07, 2 January 2025)
- 05000338/LER-1980-030, Forwards LER 80-030/03L-0 + (08:47:11, 2 January 2025)
- 05000338/LER-1980-031-03, /03L-0:on 800229,discovered Foxboro Model E17DM Transmitter,Installed to Replace Rosemount Model on Casing Cooling Tank Level Transmitter,Was Not Seismically Qualified as Required.Caused by Misinterpretation of Data + (08:47:13, 2 January 2025)
- ML19309B168 + (08:47:14, 2 January 2025)
- 05000338/LER-1980-031, Forwards LER 80-031/03L-0 + (08:47:15, 2 January 2025)
- 05000333/LER-1980-025-03, /03L-0:on 800228,during Normal Operation While Conducting Surveillance Tests,Average Power Reactor Monitor B Remained Inoperable When Function Switch Was Returned to Operation Position.Caused by Normal Hysteresis Effect + (08:47:16, 2 January 2025)
- ML19309B163 + (08:47:17, 2 January 2025)
- 05000333/LER-1980-025, Forwards LER 80-025/03L-0 + (08:47:18, 2 January 2025)
- ML19309B160 + (08:47:20, 2 January 2025)
- ML19309B159 + (08:47:20, 2 January 2025)
- ML19309B157 + (08:47:21, 2 January 2025)
- ML19309B155 + (08:47:22, 2 January 2025)
- ML19309B156 + (08:47:22, 2 January 2025)
- ML19309B154 + (08:47:23, 2 January 2025)
- ML19309B153 + (08:47:23, 2 January 2025)
- ML19309B152 + (08:47:24, 2 January 2025)
- ML19309B150 + (08:47:25, 2 January 2025)
- ML19309B151 + (08:47:25, 2 January 2025)
- ML19309B149 + (08:47:26, 2 January 2025)
- ML19309B148 + (08:47:27, 2 January 2025)
- ML19309B147 + (08:47:27, 2 January 2025)
- ML19309B145 + (08:47:28, 2 January 2025)
- ML19309B144 + (08:47:28, 2 January 2025)
- ML19309B143 + (08:47:29, 2 January 2025)
- ML19309B140 + (08:47:30, 2 January 2025)
- ML19309B142 + (08:47:30, 2 January 2025)
- ML19309B139 + (08:47:31, 2 January 2025)