Text

..,...

'Af M

(4m 4ss-sooo 435 S.sm Avenue n

gh. Pa March 31, 1980 Director of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Attn:

D. G. Eisenhut, Acting Director Division of Operating Reactors Washington, DC 20555

Reference:

Beaver Valley Power Station, Unit No. 1 Docket No. 50-334 Discussion of Lessons Learnea Short Term Requirements Gentlemen:

Attached for your information is a table for March 1980 indicating the current status of the action items from NUREG 0578. The status for most of the items has not changed since the February submittal. The present status of the items that have changed follows:

Section 2.1.1

- Emergency Power Supply - Pressurizer Heater Four (4) groups of Pressurizer Back Up Heaters are normally powered from the Class IE electrical buses.

total of 485 W in 2 groups of 270 and 215 W a

can be connected to each of the two diesel generators via manual control from the control board or shutdown panel.

This capacity exceeds the 125 W required to maintain subcooled conditions for a 1400 cubic foot pressurizer. The manner in which these connections are presently made meets all requirements in your October 30, 1979, letter.

Section 2.2.2(b) - Onsite Technical Support Center A temporary Onsite Technical Support Center shall be established in accordance with the staff position as clarified in yot r October 30, 1979, letter prior to returning the unit to operation in mid 1980.

o s

\\

\\

t 8004 ognN

Beaver Valley Power Station, Unit No. 1 Docket No. 50-334 Discussion of Lessons Learned Short Term Requirements Page 2 Our long range plan for construction of the new permanent technical support center to meet all requirements was submitted on March 7, 1980. We requested some indication as to the acceptability of the location of the 4

building which has not yet been forthcoming.

It is our goal to complete the installation of the permanent center, complete with necessary instrumentation and data transmission facilities, by January 1, 1981.

Very truly yours, WR fn C. N.

n Vice President, Operations Attachment 1

i I

4 I

1 l

,.y

-y-y w-e' w

w

^

^

DUQUESNE LIGHT COMPANY Beaver Valley Power Station, Unit No. 1 Swamary of Stattis NUREC 0578 Action Items stCTBoN SHrmi.

tNcinimo um land Mau R tai.

ruoctDUnes exrtCT'"

Res htM4tR CAT.

STATU$

EM or DCP STATUS STATUS COHrLETION

,,3t,,,,,,

3.8.8 Emergency Power supply

-Fressuaiser Neaters A

N/R IM 20229 N/a N/R absplete Satisfactory as lastalled

-Fressustaer Level A

N/R N/1 N/R Complete Satisfactory as laatalled

-loRV and Block Valves A

N/R Mf'A N/R kbaplete Satisf actory as Ir.atalled July 1.1981 EPRI Testing Frogram 2.4.2 kallet Valve and Safety Valve Test A

l'1 20210 By Jul, 15. 3980 July 7. 1980 2 6. f. a utsest Indicattom of PORV and A

Deeg6n Concept W Fosilloe Complete DCP 292

2. 5.1 b laatsumentattou for leadequate A

Design Concept EM 20211 By July 15. 1980 July 7. 1980 Core Coullas Complete IWP 291 N/R N/R Complete Systems Review Complete 2.1.4 Cuntainment Isolettom A

N/R N/R February 8. 1980 2.6.5.a twJacased N Control remetratione A

N/A N/3 N/A Complete Setlefactory se Imstelled 2.l.5.c N Re uebiner Frocedures A

N/3 N/ I Avalting July 7. 1980 OSC Approval 2

In Frogress July 7.1980 A

2.1.6.a Systems Integrity for tilgh Radioactivity July 7. 1980 A

la Progress EM 20212 2.1.6.b Flaat Shielding Deview January 1. 1981 Plant Hodifications B

3.1. I. a Auto inst a.;*on of Aus. FW

-Control Grade A

N/R N/A N/R Complete

$atisfactory as lastalled January 1. 1981

-Safety crede B

2.1. 7. b Aua. lW fluw W/R N/A Complete Satisfactory as lastalled

-Control wrade A

N/2 EM 20211 January 1. 1981 Review of Design Required - NRC Dtr 299 B

Dess a Concept s

-$afety Csede Complete 2.6.e.a Post-Acc!Jee* Samp!!ng July 7. 1980

-tweign Daview and Procedures A

la Progress EM 2n214 July 7. 1980

-Desculption of Flant Nos.

A DCP 320 January 1, 1981

-Plant Nodifications R

D

' h Q

{ fi{ ((

AM W J C

DUQUESNE LICIIT COMPA-.

Bsaver Valley Power Station, Unit No. 1 Sununary of Status NUREG 0578 Action Itects SLCllON IAI DESCRIPTION PLAll3 5 AL FROCLINkES EXPECTED EUM8ER CAT.

STAfliS L1 or DCP SIATLS STATUS CuMPLETION l

2.1.8.b utsk Range Radiation Nettose

-In Osatainment B

Design Concept IsCP 30)

Honitore By January 1. 1981 Revtew of Destan Required - NRC Complete 9/15/80

-tifluents - Freceduaes A

July 7. 1980

-Eifluente - Implementation 3

Deslan Concept EM 20246 Nonitore by C**PI

DCP 303 9/15/80 January 1, 1981 Revleu of Design Required - NRC 2.1.8.c Improved Iodine lastrumentation A

N/R N/R Complete Complete Silver Zeolite Cartridges low Background Anal) ate B

January I. 1981 2.1.9 Transient and Accident Analyste

-Containment Pressure Indication B

Design Concept EM 202)$

Transmitter By January 1. 1981 Complete DCP 292 9/15/40

-Containment Water LAvel B

Deelga Concept EM 20236 Transmitter By January 1. 1981 Indication Complete DCP 298 9/15/40

-Conteinment Hydrogen ladication 8

Design Concept EM 20237 January 1. 1981 Complete DCP 294

-RCS Venting Revised

-bestga A

Conceptual Design EM 20218 August 1. 1980 la OSC DCP 295

-Installation a

Valve-June, 1984 January 1. 1981 Review of Design Required - haC 2.2.4.s Shift Supervisor's Responetbt!!tles A

N/R N/R N/R Cumplete 2.2.5.b Shift Technical Advisor

-Advlaar on Duty A

N/R N/A July 7.1980

-Complete Tsalaing 3

N/R N/R January 3.1981 2.2.1.c Shift Turnover Procedure A

N/R N/R Complete Complete 2.2.2.s Contra 8toom Access A

N/R N/R Complete Complete 2.2.2.b onalte schalce! Support Center

-fatab!!ahment A

(<F 116 July 7. 1980 EM 20239, 20240

-t!paraJe B

DCP 296 January 1. 1981 Detailed Schedule Subetsted March 7. 1980 2.2.2.c Oueite Operating Support Center A

EM 20241 July 7. 1930 O O\\\\i b