U.S. NUCLEAR REGULATORY COMMISSION
OFFICE OF INSPECTION AND ENFORCEMENT
REGION III
aport No. 50-306/80-03
r
,
eket No. 50-306
License No. DPR-60
I-
teensee: Northern States Power Company
414 Nicollet Mall
l
Minneapolis, MN
Facility Name:
Prairie Island Nuclear Station, Unit 2
Inspection At:
Prairie Island Site, Red Wing, MI
i
Inspection Conducted: January 15-18, 1980
vYbc.ucth .
William J. Key
' 3hl
Inspector: .
!
2 M bcevt P
~
Approved By:
D. H. Danielson, Chief
'
Engineering Support Section 2
Inspection Summary
Inspection on January 15-18, 1980 (Report No. 50-306/80-03)
,
Areas Inspected:
Inservice inspection (ISI) program, implementing proce-
'
dures, observation of work activities, and review and evaluation of non-
destructive examinations (NDE) data and reports of ISI; review and
evaluation of radiographic examination results related to IE Bulletin 79-13; review of data reports of (NDE) examination related to IE Bulletin 79-17.
The inspection involved a total of 21 on site hours by one NRC
inspector.
Results: Of the six areas inspected, no apparent items of noncompliance
were identified in five areas; one apparent item of noncompliance was
identified in one area (infraction - failure to follow NDE procedures -
paragraph 4).
l
I
80040302 55
-.
.
.-.
-
-_
to
DETAILS
.
Persons Contacted
Northern States Power (NSP)
- F. P. Tierney, Plant Manager
- P. Krumpos , QA Manager
- D. B. Hanson, ISI Engineer
- E. L. Watzl, Plant Superintendent,
Engineering and Radiology Protection
- L. C. Dahlman, M&SP Specialist
R. I. Nelson, Quality Engineer
W. Mohoney, Quality Assurance Specialist
Lambert-MacGill-Thomas Inc. (LMT)
E. L. Thomas, Level III Examiner
Hartford Steam Boiler (Hartford)
J. Williams, Authorized Nuclear Inspector
- Denotes those present at the exit interview.
a
Functional or Program Areas Inspected
4
l
1.
Procedure Review
The following examination procedures approved for use were reviewed
j
by the inspector.
NSP-VT-1, Revision 1
Visual Examination
!
NSP-VT-2, Revision i
Visual Examination of Assembled Hanger Assemblies
NSP-PT-1, Revision 1
Liquid Penetrant Examination
.
NSP-NPT-V-S-Revision 1
Liquid Penetrant Examination Special Procedure
l
For 40 F - 125 F
i
!
NSP-MT-1, Revision 0
.
Ultrasonic Examination of Pipe Welds
NSP-UT-2, Revision 0
i
Automatic Data Recording
-2-
. _ .
-
- - .
.
.- -
.
_ - - .
. . - - -
,
)
,
I
NSP-UT-4, Revision 0
-
Ultrasonic Examination of Studs and Bolts
NSP-UT-12, Revision 0
Ultrasonic Examination of Reactor Coolant Pump Flywheel
MRS 2.4.2 Gen-23, Revision 1 (W)
>
Multi-Frequency Eddy Current Inspection of Steam Generator Tubing -
Preservice and Inservice
Peabody Testing Service Procedure 3.20.A.1-3, Revision 0
Radiographic Examination of Welds
No items of noncompliance or deviations were identified.
2.
Personnel Certification and Qualifications
The following certification / qualification records of NDE personnel
were reviewed by the inspector.
Lambert-Macgill-Thomas Inc. (LMT)
Name
E. L. Thomas
III
III
III
III
I
M. E. Guste11y
II
D. A. Hall
I
R
A. Kellerhall
II
II
Il
R. W. Techacek
II
II
W. M. Tighe
I
Peabody Testing Service (PTS)
Name
C. L. Brown
II
I
L. Harston
II
K. Hartinson
II
i
V. A. Olsen
I
Zetec
Name
Eq
E. McKee
IIA
-3-
1
.
Westinghouse Electric Corporation (W)
'*-
.
.Name
4
S. D. Bechner
I
i
!
D. D. Ducar
II
J. E. Stel
II
G. J. Ferenchak
II
R. P. Hazen
II
R. H. Ingraham
III
L. W. Lunden
1
J. E. Mills
l'
R. A. Vollmer
I
T. J. Westcoat
I
1
No items of noncompliance or deviations were identified.
i
3.
Equipment and Materials
The following equipment and materials were examined.
In addition,
.
certifications and calibrations were reviewed by the inspector.
4
LMT
j
Magnaflue Penetrant - SKL-HEL/S - Batch 7A004
i
Magnaflux Developer SKD-NF - Batch 78L050
Magnaflux Cleaner SKC-NF - Batch 78LO35
Ultrasonic Couplant - LMT Gel - Batch - 111778
Gel 3000 - Batch - 1378
Ultrasonic Instruments
,
i
Nortec
'Model - 131D S/N 129
Nortec - Model - 131D S/N 111
Sonic - Model - FTS-MK-1-S/N 755111
i
t
Brush Recorder
!
Gould 220 S/N 14012
,
Gould 220 S/N 14596
!
Gould 220 S/N 00647
Calipers - Mitutoyo - Dial - S/N - LMT-104
i
-4-
-
. ..
-
. - .
.
.. ---
-.
.
.
'
Reference Blocks
,
Rampas Block 4140 C/S S/N 013
Rampas Block 304 S/S S/N 14
Rampas Block 304 S/S S/N 024
IIW Block S/N 01
Surface Temperature Thermometers
50 F - 1000 F Model 573 S/N 192
4
50*F - 1000 F Model 573 S/N 211
0'F - 360 F Model 310F S/N 216
0 F - 360 F Model 310F S/N 215
Magnetic Yoke
Magnaflux S/N LMT-100
S/N GTL-001
Ultrasonic Transducers
Manufacturer
Size
MHZ
S/N
Panatrametics
3/4"-0
2.25
5290
Harsonics
1"-0
2.25
P362
1/2" X 1/2" (dual)
2.25
P8120
1/2" X 1/4" (dual)
1.5
Q1032
1/4" X 1/4"
1.25
R1150
1/4" X 0
5
R10020
1
1/4" X 1/4"
2.25
R12200
3/8" X 3/8"
3.5
R169
3/8" X 3/8"
3.5
R30103
1/2"
2.5
Q11123
1/2" X 1/2"
2.25
N979
1/2" X 1/2"
2.25
R7166
!
Peabody Testing Service
Densitometer X-Rite, S/N 12831
Westinghouse (W) Eddy Current Equipment
Data Collection Station No. 1
Teac-FM2300 NSD S/N 0036
Brush Recorder MX 220 S/N 0530
MK 220 S/N 0533
Eight Channel Recorder HP3968AZ S/N 0535
Main Frame MIZ 12 S/N 0557
Plug In's MIZ 12 S/N 0559
MIZ 12 S/N 0560
MIZ 12 S/N 0561
1
-5-
- .
.- -
.
- -
Mixer Plug Ins MIZ 12-S/N 0562
MIZ 12 S/N 0583
Display Module MIZ 12 S/N 0583
Storage Scope TekS111 S/N 0564
Data Collection Station No. 2
Reae FM2300 NSD S/N 0272
Brush Recorder MK220 S/N 0156
MK220 S/N 0276
Channel Recorder HP 3968AZ S/N 0534
Main Frame MIZ 12 S/N 0538
Plug Ins MIZ 12 S/N 0539
MIZ 12 S/N 0584
MIZ 12 S/N 0540
MIZ 12 S/N 0541
Mixer Plug Ins MIZ12 S/N 0542
MIZ 12 S/N 0543
Display Module MIZ 12 S/N 0556
Storage Scope Tek5111 S/N 0555
Eddy Current Standards
Zetec Inc. inconel 600 S/N I33W, Heat No. N17735
inconel 600 S/N I30W, Heat No. N17735
Zetec Equipment
Victor Analyzer Model III S/N 001
Display Module MIZ12 S/N 002
Scope TekS111 S/N B120356
No items of noncompliance or deviations were identified.
4.
Observation of Activities
Inservice Inspection (ISI) Unit 2
The inspector observed liquid penetrant examination of pressurizer
nozzles on line No. 6-2-RC-20A and 6-2-RC-20B identified on NAVC0
drawing No. A7636(8) and determined that procedure No. NSP-PT-1,
Revision 1, was that not being followed. This is an infraction
identified in Appendix'A of this report.
(306/80-03-01)
Eddy Current Examination (ET)
The inspector observed the collection of ET data by W personnel of
steam generator 22.
The examination program identified a total of 499 tubes to be examined
in the hot leg of generator No. 21, two (2) tubes were identified
as having more than 70% wastage and were plugged. An expanded
-6-
.
- - _
'
.
examination program identified 427 tubes to be examined in the cold
leg. Nine (9) tubes were identified as having greater than 20% wast-
age and thirty (30) with less than 20%.
Examination of steam generator 22 identified 1079 tubes to be examined
on the cold leg of which four (4) were identified with greater than
50% wastage, eight (8) with greater than 45% and 52 with less than
20% wastage.
575 tubes are scheduled for examination on the hot leg
of generator 22.
The licensee held a meeting with W and determined
to pull a tube in generator 22 for analysis. A report of examination
results will be submitted to the NRC.
Except as noted, no items of noncompliance or deviations were identi-
fied.
5.
Examination Record Review
Inservice Inspection Records
The inspector reviewed the following ISI records of examinations
performed by LMT.
a.
Report No. 80-1 (Visual)
Item - Hanger No. E-GWH-73
System - Feedwater, Loop "A"
ISO-2ISI 48A
b.
Report No. 80-3 (Visual)
Item - Hanger No. K-FWH-58
System - Feedwater, Loop "A"
ISO-2ISI 48A
c.
Report No. 80-7 (Visual)
Item - Hanger No. FWH76
System - Feedwater, Loop "B"
ISO-2ISI 49A
d.
Report No. 80-18 (Ultrasonic)
System - Feedwater, "A"
Weld No. FW-174
ISO-2ISI, 48A
Procedure No. NSP-UT-1, Revision 0
e.
Report No. 80-21 (Ultrasonic)
System - Feedwater "B"
Weld No. FW-133
f.
Report No. 80-85 (Ultrasonic)
System - Pressurizer Spray Nozzle
Weld No. 22A
'
ISO --2ISI - 7C
i
-7-
_ _ , _ - . - -
-r
.
'
g.
Report No. 80-26 (Magnetic Particle)
System.- Feedwater, "A"
Weld No. FWA - 53/L
ISO-2ISI, 48A
Procedure No. NSP-MT-1, Revision I
h.
Report No. 80-38 (Magnetic Particle)
System - Feedwater "B"
Weld No. FW-133
ISO-2ISI, 49A
No items of noncompliance or deviations were identified.
6.
IE Bulletin 79-13 Reedwater Nozzle Examination
The inspector reviewed radiographs of the following Unit No. 2 steam
generator nozzle welds for evidence of cracking in accordance with
Bulletin 79-13 requirements.
a.
Loop "A" Pipe to Nozzle
Weld No. FW174
b.
Loop "B",
Pipe to Nozzle
Weld No. FW133
ISO-2ISI 49A
c.
Loop "A", Elbow to Pipe
Weld No. FW174
ISO, 2ISI 48A
d.
Loop "A", Base Metal
e.
Loop "B", Base Metal
f.
Loop "A", Pipe to Pipe
Weld No. FW161
ISO-2ISI 48A
No evidence of cracking was noted during review and examination of
these radiographs.
7.
IE Bulletin 79-17, Cracking in Stagnant Borated Water Systems
The inspector reviewed records of examinations performed by LMT of
systems identified by the licensee as containing stagnant or borated
water.
a.
Report No. 97-01 (liquid Penetrant)
System - Caustic Stand Pipe Header Containment Spray Pump
Weld Nos. 335, 340, 348, 351
-8-
--
, . -
_
._
..
-.
i
i
'
l
l
'
b.
Report No. 79-03 (Ultrascnic)
System - Safety Injection
Weld No. W204
c.
Report No. 79-8 (Ultrasonic)
System - Chemical Volume Control
Weld No. W-160
ISO-A-667
d.
Report No. 79-16 (Ultrasonic)
System - RHR
Weld No. 113
ISO-A-667
e.
Report No. 79-21 (Ultrasonic)
System - Chemical Volume Control
Weld No. W154
ISO-A-6672
f.
Report No. 79-30 (Ultrasonic)
System - RHR Discharge
Weld NO. W176
g.
Report No. 79-25 (Ultrasonic)
System - Containment Sump B Discharge
ISO-2ISI, 60
i
^
A summary of examinations performed on Unit 2 has been submitted to
j
NRC in accordance with bulletin requirements.
J
No items of noncompliance or deviations were noted.
Exit Interview
1
The inspector met with licensee personnel (denoted in the Persons Contacted
paragraph) at the conclusion of the inspection on January 18, 1980.
The
inspector summarized the scope and findings of the inspection and discus-
sed the item of noncompliance identified in Appendix A of this report.
-9-
.__ _
.
._
-
.