ML19309B183

From kanterella
Jump to navigation Jump to search

Forwards Change Application 58 to Amend License NPF-1,Tech Spec Section 4.1.3.3,allowing 25% Extension of Surveillance Interval for Rod Drop Time
ML19309B183
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 04/01/1980
From: Goodwin C
PORTLAND GENERAL ELECTRIC CO.
To: Schwencer A
Office of Nuclear Reactor Regulation
Shared Package
ML19309B184 List:
References
TAC-13053, NUDOCS 8004030240
Download: ML19309B183 (1)


Text

<

e IT.br C CdGQ 2.'EC!.iC CCI.CCI'f

~

C

~

J a

April 1, 1980 Trojan Nuclear Plant Docket 50-344 License NPF-1 License Change Application 58 Director of Nuclear Reactor Regulation ATTN:

Mr. A. Schwencer, Chief Operating Reactors Branch #1 Division of Operating Reactors U. S. Nuclear Regulatory Commission Washington, D. C.

20555

Dear Sir:

Attached are three signed originals and 40 conformed copies of License Change Application 58 requesting amendment of Operating License NPF-1.

This License Change Application has been evaluated to be a Class III amendment request and a check for $4,000 is attached in accordance with 10 CFR 170.

PGE has transmitted a copy of this request to the Oregon Department of Energy for their consultation.

Also attached is one signed copy of a Certificate of Service for License Change Application 58 to the chief executive of the county in which the facility is located and the Director of the State of Oregon, Department of Energy.

Sincerely, N

C. Goedwin, Jr.

Assistant Vice President Thermd El<.rc Operation and Maintenance CG/KM/4sa4A24 Af h

[

Attachment

\\

c: Director t

St.ite of Cregon

.D Department of Energy VO g

8.00403o 2M O