ML19309B204
| ML19309B204 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 03/11/1980 |
| From: | Ziemann D Office of Nuclear Reactor Regulation |
| To: | Counsil W NORTHEAST NUCLEAR ENERGY CO. |
| References | |
| TAC-10660, NUDOCS 8004030268 | |
| Download: ML19309B204 (2) | |
Text
/Z/M)
~
our
/
o UNITED STATES g
NUCLEAR REGULATORY COMMISSION e
o 7,
g WASHINGTON, D. C. 20655
,/
March 11, 1980 Dock:t Nos. 50-245/336 Mr. W. G. Counsil, Vice President Nuclear Engineering and Operations Northeast Nuclear Energy Company P. O. Box 270 Hartford, Connecticut 06101
Dear Mr. Counsil:
We have reviewed the revised Safeguards Contingency Plan dated February 1980 for the Millstone Nuclear Pcwer Station, which is in reference to the coments transmitted by our letter dated January 9,1980.
You are requested within 30 days to submit revised plan pages in accordance with the coments described in the enclosure to this letter.
Please note that the enclosure is being withheld from public disclosure in accordance with 10 CFR Section 2.790(d).
Sincerely, Dennis L. Zieman, Chief Operating Reactors Branct #2 Division of Operating Reactors
Enclosure:
Coments (Withheld from Public Disclosure) cc w/o enclosure:
See next page I
8 004 030hb (
n-Mr. W. G. Counsil March 11, 1980 cc w/o enclosure:
William H. Cuddy, Esquire Conne'cticut Energy Agency Day, Berry & Howard ATTN: Assistant Director Counselors at Law Research and Policy One Constitutien Plaza Development Hartford, Connecticut 06103 Department of Planning and Energy Policy Anthony Z. Roisman 20 Grand Street Natural Resources Defense Council Hartford, Connecticut 06106 91715th Street, N. W.
Washington, D. C.
20005 Director, Technical Assessment Division Northeast Nuclear Energy Company Office of Radiation Programs ATTN: Superintendent (AW-459)
Millstone Plant U. S. Environmental Protection P. O. Box 128 Agency Waterford, Connecticut 06385 Crystal Mall #2 Arlington, Virginia 20460 Mr. Jares R. Himmelwright Northeast Utilities Service Company U. S. Environmental Protection P. O. Box 270 Agency Hartford, Connecticut 0.101 Region I Office ATTN: EIS C0ORDINATOR Resident Inspector JFK Federal Building c/o U. S. NRC Boston, Massachusetts 02203 P. O. Box Drawer KK Niantic, Connecticut 06357 Waterford Public Library Rope Ferry Road, Route 156 Waterford, Connecticut 06385 First Selectman of the Town of Waterford Hall of Records 200 Boston Post Road Waterford, Connecticut 06385 t
+
L