Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20244B568 + (09:20:19, 2 December 2024)
- ML20244B567 + (09:20:20, 2 December 2024)
- ML20244B566 + (09:20:21, 2 December 2024)
- ML20244B564 + (09:20:21, 2 December 2024)
- ML20244B563 + (09:20:22, 2 December 2024)
- ML20244B561 + (09:20:23, 2 December 2024)
- 05000328/LER-1988-041, :on 881209,discovered That as-installed Instrument Cabinets Supplied by Bailey Meter Co Did Not Meet Seismic Qualification Requirements.Caused by Lack of Two Restraint Bars on Vendor Drawings + (09:20:24, 2 December 2024)
- IR 05000309/1988200 + (09:20:25, 2 December 2024)
- ML20244B558 + (09:20:26, 2 December 2024)
- ML20244B557 + (09:20:27, 2 December 2024)
- ML20244B556 + (09:20:27, 2 December 2024)
- ML20244B553 + (09:20:28, 2 December 2024)
- ML20244B551 + (09:20:29, 2 December 2024)
- ML20244B552 + (09:20:29, 2 December 2024)
- 05000457/LER-1988-029-02, :on 881025,reactor Manually Tripped When Alarm Received at Main Control Panel for High Suction Strainer Differential Pressure for Condensate Pumps 2A & 2C.Caused by Plugged Suction Strainers.Condenser Cleaned + (09:20:31, 2 December 2024)
- ML20244B546 + (09:20:33, 2 December 2024)
- 05000327/LER-1988-033, :on 881004,unplanned Reactor Trip Signal Generated Due to Reactor Protection Sys (RPS) Channel I Instrument Failure During RPS Channel II Calibr.Possibly Caused by Component Aging + (09:20:34, 2 December 2024)
- ML20244B543 + (09:20:36, 2 December 2024)
- LD-89-031, Application for Amend to License SNM-33,allowing Startup & Test of New Pellet Lines Using Depleted U.Fee Paid + (09:20:36, 2 December 2024)
- ML20244B542 + (09:20:37, 2 December 2024)
- ML20244B540 + (09:20:40, 2 December 2024)
- ML20244B537 + (09:20:41, 2 December 2024)
- ML20244B536 + (09:20:41, 2 December 2024)
- ML20244B533 + (09:20:43, 2 December 2024)
- 05000327/LER-1989-007-01, :on 890319,train a Control Room Isolation (Cri) Occurred.Caused by Personnel Error.Facility Assistance Shift Operations Supervisor Suspended Maint Activity on Smoke Detectors & Verified Train a Cri for Radiation + (09:20:45, 2 December 2024)
- ML20244B527 + (09:20:46, 2 December 2024)
- ML20244B526 + (09:20:47, 2 December 2024)
- ML20244B522 + (09:20:47, 2 December 2024)
- ML20244B521 + (09:20:48, 2 December 2024)
- IR 05000277/1989014 + (09:20:49, 2 December 2024)
- ML20244B518 + (09:20:49, 2 December 2024)
- ML20244B515 + (09:20:50, 2 December 2024)
- ML20244B514 + (09:20:51, 2 December 2024)
- ML20244B512 + (09:20:51, 2 December 2024)
- ML20244B511 + (09:20:52, 2 December 2024)
- ML20244B508 + (09:20:52, 2 December 2024)
- 05000440/LER-1989-015, :on 890512,discovered Error in Calculating Head Correction for Narrow Range Reactor Vessel Water Level. Caused by Design Deficiency.Transmitters Using Correct Head Correction Value Calculated & Adjusted + (09:20:54, 2 December 2024)
- ML20244B505 + (09:20:55, 2 December 2024)
- ST-HL-AE-3039, Forwards Summary of Dynamic Rod Drop Test Performed at Tihange 3 in 1985,in Response to 890221 Request for Addl Info Re Tests Deleted from Startup Test Program + (09:20:56, 2 December 2024)
- ML20244B503 + (09:20:56, 2 December 2024)
- IR 05000353/1989010 + (09:20:58, 2 December 2024)
- ML20244B501 + (09:20:58, 2 December 2024)
- ML20244B499 + (09:20:59, 2 December 2024)
- ML20244B498 + (09:20:59, 2 December 2024)
- ML20244B497 + (09:21:00, 2 December 2024)
- ML20244B495 + (09:21:01, 2 December 2024)
- ML20244B494 + (09:21:02, 2 December 2024)
- ML20244B492 + (09:21:02, 2 December 2024)
- ML20244B491 + (09:21:03, 2 December 2024)
- ML20244B490 + (09:21:04, 2 December 2024)
- ML20244B489 + (09:21:04, 2 December 2024)
- ML20244B488 + (09:21:05, 2 December 2024)