ML20244B563
| ML20244B563 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 04/07/1989 |
| From: | Ronald Bellamy NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Mroczka E NORTHEAST NUCLEAR ENERGY CO. |
| Shared Package | |
| ML20244B565 | List: |
| References | |
| NUDOCS 8904190271 | |
| Download: ML20244B563 (2) | |
See also: IR 05000245/1989006
Text
, . - -
-_
. - . _ - _ - _ - - - . - - , -
-- -_
-
.--
- - _ - . _ - - - _
- _ - _ - - - - - -
_ - _ _ - _ - - - - _ _ _ _ _ - - _
_-_--
f
. .;
..
w
,'
".
c
APR 0 711989
i
1
Li
Docket Nos. 50-245
50-336
'I
'50-423-
,
Northeast Nuclear Energy' Company
'ATTNi
Mr.,E. J. Mroczka-
Senior Vice President'- Nuclear
,
Engineering and Operations Group.
P. 0.~ Box 270
Hartford, Connecticut - 06141-0270
Gentlemen:
,
Subject:
Combined Inspection Report Nos. 50-245/89-06, 50-336/89-09 and
50-423/89-06
h
A-routine, unannounced inspection.was' conducted at the Millstone Station on
-March 6-10, 1989. The purpose of this inspection waszto continue the review-
.
- of the implementation of the Radiation Protection Program at Unit 2 during the'
refueling outage, and preparation for the refueling outages at Units. l. and 3.
Within the' scope of this , inspection, no violations were. identified. The
' inspector concluded that the Radiation Protection Program was properly
implemented, and that preparations for the refueling outages at Units 1 and 3
were proceeding adequately.
,
No reply.to this letter is required. Your cooperation with us is appreciated.
Sincerely,
Original Signed BY;
V/ alter J. Pasciak
. Ronald R. Bellamy, Chief
Facilities Radiological Safety
and Safeguards Branch
Division of Radiation Safety
and Safeguards
Enclosurc:
NRC Region I Combined Inspection Report Nos. 50-245/89-06, 50-336/89-09 and
50-423/89-06
g -we ~
gns
t
j%m
-
t
g
b
cam
%
i\\
OFFICIAL RECORD COPY
CIR MILLSTONE 89-06/09/06 -
0001.0.0
03/22/89
8904190271 890407
ADOCK 00000336
Q
,_
.__.
.
- - - _ . - - - _ - _ _ - _ _ _ - _ _ _ - _ - _ - - - _ _ - _ _ - - - _ _ - .
.
,
'[
,r
. . .
. .
,-
.
Northeast' Nuclear
'2_
APR 0 71989
-
Energy Company
i
h/ encl:
<!
[
b . D. Romberg, Vice President, Nuclear Operations
.
l'{N..E.Scace,StationSuperintendent liRL,0. Nordquist, Director
1.
,
M. Kacich,: Manager, Generation Facilities Licensing
' Gerald Garfield,' Esquire
-
Public Document Room 1(POR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
-NRC Resident Inspector-
State of' Connecticut
bec w/ encl.:
.
.
Region I Docket-Room _(with. concurrences)
Management Assistant, DRMA (w/o encl)-
DRP Section Chief-
J.'Shedlosky,. SRI, Haddam Neck
.W. Raymond, SRI, Millstone 3
M. Boyle-, LPM,:NRR
k.'Bures, DRSS
.y
RI:DRSS
- DRSS
J(1.RSS
H
Thomas /
Sha g
ellamy
03/.27/8
/'//89
4 /n/89
0FFICIAL AECORD COPY
CIR MILLSTONE 89-06/09/06 -
0002.0.0
03/29/89
_
_ - _ _ _ = _ _ _ _ - _ _ _ _ - - _ _
-