ML20244B527

From kanterella
Jump to navigation Jump to search
Notification of 890627 Meeting W/Util in Rockville,Md to Discuss Matters Related to 10CFR50.44, Active Combustible Gas Control Sys - Oyster Creek Nuclear Generating Station
ML20244B527
Person / Time
Site: Oyster Creek
Issue date: 06/05/1989
From: Dromerick A
Office of Nuclear Reactor Regulation
To: Stolz J
Office of Nuclear Reactor Regulation
References
NUDOCS 8906130155
Download: ML20244B527 (5)


Text

>vm June 5,.1989. (

Docket'No. 50-219

. 1 MEMORANDUM FOR: John F. Stolz, Director-Project Directorate I-4 Division of Reactor Projects I/II FROM: Ale'xander W. Dromerick, Project Manager

( Project Directorate I-4' f

Division of Reactor Projects I/II

SUBJECT:

. FORTHCOMING MEETING WITH GPU NUCLEAR CORPORATION 't

'(GPUN)ONOYSTERCREEKHUCLEARGENERATINGSTATION L DATE & TIME: Tuesday, June 27, 1989 l- 1:00 pm - 5:00 pm LOCATION:- One White Flint North' 11555 Rockville Pike -

{

Rockville, Maryland

' .1 Room 14B11

~ PURPOSE: To discuss matters related to 10 CFR 50.44', Active.

Combustible Gas Control System - Oyster Creek Nuclear Generating $tation (meeting agenda. attached)

  • PARTICl? ANTS: NRC GPUN-J. Sniezek M. Laggart, et al.-

S. Varga B. Boger '

A. Thadani J. Stolz I J. Kudrick A. Dromerick S. Brown i

\

/s/

Alexander W. Dromerick, Project Manager Project Directorate I-4 Division of Reactor' Projects I/II Office of Nuclear Reactor Regulation cc: See next page  !

  • Meetings between NRC icchnical. staff and applicants or licensees are open for interested members of-the public, petitioners, interveners ' or other parties {

to attend as observers pursuant to "Open Meeting Statement of MRC Staff Policy " ~

43 Federal Recister 28058,6/28/78.

[MEtllNE OF 1UE5 DAY JUNE 2 ]

LA:PDI-4 ' 4 PD:PD 4 SNoWis rick:cb JStolz' ,d 5/S//89 S

/g/89 ht/b/

O of 8906130155 890605 PDR ADOCK 05000219 P FDC l

. Mr. E. E. Fitzpatrick Oyster Creek Nuclear

~0yster Creek Nuclear Generating Station Generating Station ec:

Ernest 1.. Blake, Jr. Resident Inspector Shaw, Pittman, Potts and Trowbridge c/o U.S. NRC 2300 N Street, NW Post Office Box 445 Washington, D.C. 20037 Forked River, New Jersey 08731 J.B. Libeman, Esquiro Commissioner Bishop, Liberman, Cook, et al. New Jersey Department of Energy 1155 Avenue of the Americas- 101 Comerce Street New York, New York 10036 Newark, New Jersey 07102 Jennifer Moon, Acting Chief Regional Administrator, Region I New Jersey Department of Environmental U.S. Nuclear Regulatory Commission Protection 475 Allendale Road Bureau of Nuclear Engineering King of Prussia, Pennsylvania 19406 CN 415 Trenton, New Jersey 08625 BWR Licensing Manager GPU Nuclear Corporation 1 Upper Pond Road Parsippany, New' Jersey 07054 Deputy Attorney General State of New Jersey Department of Law and Public Safety 36 West State Street - CN 112 Trenton, New Jersey 08605 Mayor Lacey Township 818 West Lacey Road '

Forked River, New Jersey 08731 Licensing Manager Oyster Creek Nuclear Generating Station Mail Stop: Site Emergency Bldg.

P. O. Box 388 Forked River, New Jersey 08731

r f

.. l;

-1 MEETING' AGENDA FOR ,

DISCUSSION OF PLANT SPECIFIC DESIGN OF ACTIVE COMBUSTIBLE GAS CONTROL SYSTEM I. INTRODUCTION BY NRC STAFF II. MEETING OBJECTIVE To provide sufficient design details of the Nitrogen Injection Capability for each plant to determine if the provisions are adequate to meet the intent of 10 CFR S0.44

~

III. AIR-CAD SYSTEM /

NRC staff will provide the basis for concluding that_the syst'em should not be used for combustible gas control. "

. Represents an air source per GL' 84-09 guidence

. Potential misuse of system

. Impact of deinerting on course of the accident

'IV. LICENSING BASIS AND BWR EPG'S ,

Reconcile any conflicts between original licensing basis and Rev. 4  ;

to the EWR EFG's. ,

j

. When will CAD be used (under what system conditions)

. Is the E0P consistent with FSAR assumptions I V. PLANT SPECIFIC DESCRIPTION OF INERTING SYSTEM The objective is to identify all essential components, design conditions, instrumentation, and power supply for the normal'inerting system to  !

determine under what post LOCA conditions the system could be expected to function as a combustible gas control system. l A. System / component description All components required to operate under post LOCA conditions should  ;

be described.

Design specification (i.e. seismic, redundancy, quality group, etc) for a parameter where the component has not been designed for, such as seismic, but is expected to s!:rvive, provide the basis

. Location

s e

. Design pressure and temperature Maximum containment conditions for component operability should also be noted

. Design flow rate as a function of containment pressure B. System Instrumentation Instrumentation recessary to operate the system post LOCA should be identified. f-

. Identify each sensor, number and location -

. Location of instrument readout If outside control room, determine accessability post LOCA

_ . System use of sensor output What is sensor used for-(automatic valve operation? or not) if operator information only, indicate what type of action is anticipated (flowchange,systemshutoff,etc)

C. Operational requirements post LOCA Identify those actions that will be required to initiate system operation and those necessary for monitoring operation. For each action, identify whether it is from the control room or at a remote site.

. Instrumentation needed for startup l

. Instrumentation needed for operation

. Power supply (off site and diesel?)

D. Nitrogen capacity (onsite and time to get added supply)

E. Identification of deviations from GDC 41,42, and 43 '

l F. Modificationstoeliminatedeviationsfrom(e)

G. Operational, maintenance, and surveillance history objective is to obtain some basis for determining system availability I

.q

..g

,}

l

. .;. .i. '- ,

h

. DISTRIBUTION-

-(dMNor

-NRC & LocalCentral PDRs- $k" }sI@ l PDI-4 Reading

'T.'Murley/J. Sniezek ] ;

'J. Partlow-S.:Varga B. Boger,.

A.' Dromerick 9 W. Lanning OGC -]

E. Jordan j

.B. Grimes Receptionist (Building where meeting.is being. held)

NRC Participants J. Sniezek A. Thadani-J.- Stolz J. Kudrick:

S. Brown ACRS(10)-

GPA/PA

-V. Wilson L. Thomas H. B. Clayton (Region I Plants)*

K. Abraham, Region I**

l 1

I, 1

i

)

I L l j

i

_ _ _ _ _ . - _ - _