Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20246B000 + (05:27:57, 2 December 2024)
- IR 05000324/1989021 + (05:27:58, 2 December 2024)
- ML20246A998 + (05:27:58, 2 December 2024)
- 05000352/LER-1989-038, :on 890528,RCIC Sys Isolated & RCIC Turbine Received Trip Signal from Steam Leak Detection Sys High Differential Temp Isolation Signal.Caused by Procedural Noncompliance.Technicians Disciplined + (05:28:00, 2 December 2024)
- 05000354/LER-1989-006, :on 890310,discovered That 26 R Frequency Surveillance Procedures Exceeded Tech Spec Overdue Dates by Intervals of 1 to 10 Days.Caused by Data Inputting Error in Surveillance Tracking Computer Sys + (05:28:02, 2 December 2024)
- IR 05000334/1989012 + (05:28:06, 2 December 2024)
- ML20246A986 + (05:28:07, 2 December 2024)
- ML20246A983 + (05:28:07, 2 December 2024)
- AECM-89-0029, Forwards Summary of long-term Engineering Solution Re Fuel Pool Cooling & Cleanup Sys Heat Removal Capability.Solution Submitted Prior to Startup from Third Refueling Outage + (05:28:08, 2 December 2024)
- ML20246A975 + (05:28:09, 2 December 2024)
- ML20246A978 + (05:28:09, 2 December 2024)
- ML20246A970 + (05:28:10, 2 December 2024)
- ML20246A966 + (05:28:11, 2 December 2024)
- 05000260/LER-1989-007-02, :on 890317,wiring in Unit Neutron Monitoring Sys Intermediate Range Monitor & Source Range Monitor Found to Be Brittle & Cracked.Caused by Use of Inappropriate Wire.Wiring Replaced + (05:28:13, 2 December 2024)
- ML20246A961 + (05:28:14, 2 December 2024)
- ML20246A957 + (05:28:17, 2 December 2024)
- 05000295/LER-1989-007-04, :on 890311,RHR Supply to Train a Containment Spray Header Stop Valve Did Not Fully Open While Performing PT-2B Step A.5.Caused by Boric Aid Buildup on Valve Stem. Valve Stem Cleaned & Lubricated + (05:28:19, 2 December 2024)
- ML20246A954 + (05:28:20, 2 December 2024)
- ML20246A951 + (05:28:21, 2 December 2024)
- ML20246A953 + (05:28:21, 2 December 2024)
- ML20246A950 + (05:28:22, 2 December 2024)
- ML20246A949 + (05:28:23, 2 December 2024)
- ML20246A946 + (05:28:24, 2 December 2024)
- ML20246A947 + (05:28:24, 2 December 2024)
- JPN-89-044, Responds to Generic Ltr 88-11, Radiation Embrittlement of Reactor Vessel Matls. Mod of pressure-temp Limits Contained in Tech Spec Necessary in Order to Continue to Satisfy Requirements of 10CFR50,App G + (05:28:25, 2 December 2024)
- ML20246A942 + (05:28:26, 2 December 2024)
- IR 05000445/1989052 + (05:28:32, 2 December 2024)
- ML20246A936 + (05:28:32, 2 December 2024)
- ML20246A934 + (05:28:33, 2 December 2024)
- ML20246A935 + (05:28:33, 2 December 2024)
- ML20246A929 + (05:28:35, 2 December 2024)
- ML20246A930 + (05:28:35, 2 December 2024)
- ML20246A926 + (05:28:36, 2 December 2024)
- ML20246A922 + (05:28:37, 2 December 2024)
- ML20246A920 + (05:28:38, 2 December 2024)
- 05000324/LER-1989-007-03, :on 890603,unit Received Group III Isolation of RWCU Inboard & Outboard Isolation Valves During Calibr of RWCU Reject Flow Indicator.Caused by Lack of Specific Procedure.Calibr Procedures Will Be Written + (05:28:43, 2 December 2024)
- ST-HL-AE-3145, Concurs W/Nrc Re Understanding of Util Positions in Areas of Emergency Operating Procedures & Future Commitment + (05:28:44, 2 December 2024)
- ML20246A911 + (05:28:45, 2 December 2024)
- ML20246A914 + (05:28:45, 2 December 2024)
- ML20246A910 + (05:28:46, 2 December 2024)
- ML20246A906 + (05:28:47, 2 December 2024)
- U-601510, Revised Monthly Operating Rept for June 1989 for Clinton Power Station Unit 1 + (05:28:47, 2 December 2024)
- DCL-89-149, Requests Renewal of Approval of QA Programs for Radioactive Matl Packages + (05:28:48, 2 December 2024)
- ML20246A901 + (05:28:48, 2 December 2024)
- ML20246A900 + (05:28:49, 2 December 2024)
- IR 05000285/1989025 + (05:28:59, 2 December 2024)
- ML20246A896 + (05:28:59, 2 December 2024)
- ML20246A892 + (05:29:00, 2 December 2024)
- ML20246A887 + (05:29:01, 2 December 2024)
- ML20246A885 + (05:29:02, 2 December 2024)
- ML20246A883 + (05:29:03, 2 December 2024)
- 05000313/LER-1989-020, :on 890530,manual Actuation of Emergency Feedwater Pump Occurred.Caused by Tube Failures in Feedwater HX & Leaking B Startup Control Valve Which Necessitated Opening of Valve FW-8B.Tube Leaks Repaired + (05:29:05, 2 December 2024)