ML20246A892
| ML20246A892 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 06/30/1989 |
| From: | Milhoan J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Morris K OMAHA PUBLIC POWER DISTRICT |
| Shared Package | |
| ML20246A895 | List: |
| References | |
| NUDOCS 8907070124 | |
| Download: ML20246A892 (2) | |
See also: IR 05000285/1989025
Text
{{#Wiki_filter:- - - - - - . -- - - - _ _ _ ' r . $$ i c. . ' JUN 3 01989 In Reply Refer To: Docket: 50-285/89-25 Omaha Public Power District ATTN: Kenneth J. Morris, Division Manager Nuclear Operations 444 South 16th Street Mall Omaha, Nebraska 68102-2247 Gentlemen: This refers to the inspection conducted by Mr. L. Wilborn and Dr. J. B. Nicholas ' of this office during the period June 5-9, 1989, of activities authorized by NRC Operating License DPR-40 for the Fort Calhoun Station, and to the discussion of our findings with Mr. G. R. Peterson and other members of your staff at the conclusion of the inspection on June 9, 1989. Areas examined during the inspection included the water chemistry and radiochemistry programs and water chemistry and radiochemistry confirmatory measurements. Within these areas, the inspection consisted of selective examination of procedures and representative records, interviews with personnel, and observations by the NRC inspectors. The inspection findings are documented in the enclosed inspection report. Within the scope of the inspection, no violations or deviations were identified. Should you have any questions concerning this inspection, we will be pleased to discuss them with you. i Sincerely, f James L. Milhoan, Director Division of Reactor Projects Enclosures: 1. Appendix - NRC Inspection Report 50-285/89-25 2. Attachment 1 - Analytical Measurements 3. Attachment 2 - Water Chemistry Confirmatory Measurements Results (Secondary Chemistry Laboratory) 4. Attachment 3 - Water Chemistry Confirmatory Measurements Results (Radiochemistry Laboratory) 5. Attachment 4 - Criteria for Comparing Water Chemistry Analytical Measurements r)- RIV: FRPS: RPB h FRPS:RPB[# C:FRPS:RPB C:RPB D: S I D:DRP O 8Muryay AB- hLMilhoa JBNicholas/tw/d LWilborn EBapr f 6 /tc /89 /, /r4 /89 /Jf >/89 C /f8y'89 G/8l/89 6 /30/89 8 I 8907070124 890630 gDR ADOCK 0500 5 {{ _ _ _ _ -
, ___ _ _ - a - . s. . v.; i. ' ,. L . J -
- <
t
- ,
-Omaha Public Power District ' -2- i ! i ' Enclosures: (cont.) h 4 6. Attachment 5 - Radiological Confirmatory i= Measurements Results ' 7. Attachment 6' Criteria for Comparing Radiological. ' Analytical Measurements 8. Attachment 7 -. Documents Reviewed cc w/ enclosures: Fort Calhoun' Station ATTN: G. R. Peterson, Manager P.O.. Box 399 Fort Calhoun, Nebraska 68023 . , . Harry H. Voigt, Esq. _
- LeBoeuf,. Lamb,~Leiby & MacRae
-.1333 New Hampshire Avenue, NW Washington, DC 20036 1 Nebraska Radiation Control Program Director bec to DMB (IE06) bec distrib. by RIV:
- R.D. Martin, RA
- RPB-DRSS
' '*Section Chief (DRP/B)
- MIS System
- RIV File
- DRP
- RSTS Operator
.
- Project Engineer (DRP/B)'
Lisa Shea, RM/ALF
- DRS
- RRI
- R. E. Hall
' 4
- J. 8. Nicholas
- R. E. Baer
^B. Murray
- L. Wilborn
- A. B. Beach
4
- P. Milano,.NRR Project Manager (MS:
13-D-18)
- w/766
I l . -- - - - - _ _ _ _ _ . - _ _ _ _ _ _ }}