Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000298/LER-1989-005, :Ac Voltage Regulation Concerns Identified During NRC Insp on 870511-0619.Caused by Inadequate Design. Design Change 88-263 Will Install Annunciation on 69 Kv Line to Alert Operator If Line Voltage Cannot Support ECCS + (02:33:28, 2 December 2024)
- ML20247B428 + (02:33:30, 2 December 2024)
- ML20247B427 + (02:33:30, 2 December 2024)
- ML20247B426 + (02:33:31, 2 December 2024)
- U-601443, Part 21 Rept Re Failure of Solenoid Operated Air Pilot Valves for Main Steam Sys Safety/Relief Valves to Meet Environ Qualification Requirements.Following Rev of Vendor Manual,Util Will Install Raychem Heat Shrink Sleeves + (02:33:31, 2 December 2024)
- ML20247B422 + (02:33:32, 2 December 2024)
- IR 05000382/1989010 + (02:33:33, 2 December 2024)
- ML20247B419 + (02:33:33, 2 December 2024)
- ML20247B417 + (02:33:34, 2 December 2024)
- ML20247B418 + (02:33:34, 2 December 2024)
- IR 05000498/1988042 + (02:33:35, 2 December 2024)
- 05000368/LER-1989-014-01, :on 870710,discovered That Portions of Piping & Supports,Associated W/Auxiliary Spray Piping Designed to Max Temp of 120 Degrees Instead of Possible Temp of 479 Degrees. Caused by Error in Analysis.Insp Performed + (02:33:37, 2 December 2024)
- ML20247B414 + (02:33:38, 2 December 2024)
- ML20247B411 + (02:33:39, 2 December 2024)
- ML20247B409 + (02:33:40, 2 December 2024)
- ML20247B410 + (02:33:40, 2 December 2024)
- IR 05000321/1989017 + (02:33:43, 2 December 2024)
- ML20247B403 + (02:33:44, 2 December 2024)
- ML20247B404 + (02:33:44, 2 December 2024)
- ML20247B402 + (02:33:45, 2 December 2024)
- ML20247B401 + (02:33:45, 2 December 2024)
- IR 05000498/1988087 + (02:33:46, 2 December 2024)
- ML20247B395 + (02:33:47, 2 December 2024)
- ML20247B393 + (02:33:48, 2 December 2024)
- ML20247B394 + (02:33:48, 2 December 2024)
- ML20247B392 + (02:33:49, 2 December 2024)
- ML20247B385 + (02:33:50, 2 December 2024)
- 05000458/LER-1989-019, :on 890411,unplanned ESF Actuation Occurred as Result of Blown Control Power Fuse During Surveillance Testing of Control Circuit.Cause Not Determined.Blown Fuse Replaced & Actuated Sys Restored to Normal + (02:33:52, 2 December 2024)
- ML20247B382 + (02:33:53, 2 December 2024)
- 05000457/LER-1989-001-09, :on 890223,loss of RHR 2B Loop Occurred as Result of Procedural Deficiency.Caused by Failure to Identify That Placing Ssps in Test Would Not Block auto- Closure of Pump Valves.Procedure Revised + (02:33:55, 2 December 2024)
- ML20247B380 + (02:33:56, 2 December 2024)
- ML20247B379 + (02:33:56, 2 December 2024)
- ML20247B377 + (02:33:57, 2 December 2024)
- ML20247B376 + (02:33:57, 2 December 2024)
- ML20247B372 + (02:33:58, 2 December 2024)
- 05000456/LER-1989-001, :on 890206,reactor Trip Occurred Due to Spurious Loss of Output Voltage on Instrument Inverter 112. Cause of Momentary Loss of Inverter Under Investigation. Feedwater Isolation Signal Reset + (02:34:00, 2 December 2024)
- ML20247B363 + (02:34:01, 2 December 2024)
- ML20247B361 + (02:34:02, 2 December 2024)
- ML20247B355 + (02:34:03, 2 December 2024)
- ML20247B351 + (02:34:04, 2 December 2024)
- NLS8900326, Forwards Endorsements 11 & 12 to Maelu Certificate M-41 & Endorsements 11 & 12 to Nelia Certificate N-41.Endorsement 12 Reflects Increase in Required Primary Financial Protection Limits + (02:34:05, 2 December 2024)
- ML20247B346 + (02:34:06, 2 December 2024)
- ML20247B347 + (02:34:06, 2 December 2024)
- 05000267/LER-1989-013, :on 890811,12 Cable Trays in Auxiliary Electric Room Found Filled Above Design Limits.Caused by Error in Cable Tray Loading Computer Program Omitting Cables from Calculations.Program Corrected + (02:34:08, 2 December 2024)
- IR 05000344/1989002 + (02:34:09, 2 December 2024)
- ML20247B344 + (02:34:09, 2 December 2024)
- ML20247B341 + (02:34:10, 2 December 2024)
- 05000254/LER-1989-010, :on 890629,reactor Scram Occurred Due to Turbine Stop Valve Closure.Caused by Loose Connection on Condenser Low Vacuum Pressure Switch Indicating Lamp 1-5600-PS-105B.Connection Tightened + (02:34:12, 2 December 2024)
- ML20247B339 + (02:34:15, 2 December 2024)
- ML20247B338 + (02:34:16, 2 December 2024)
- ST-HL-AE-2785, Provides Revised Response to IE Bulletin 77-07, Containment Electrical Penetration Assemblies at Nuclear Power Plants Under Const. Electrical Penetrations Will Not Be Pressurized Except During Testing + (02:34:17, 2 December 2024)