ML20247B392

From kanterella
Jump to navigation Jump to search
Forwards Completed Licensee Questionnaire Re NRC Expanded Activation Site Team Survey
ML20247B392
Person / Time
Site: Oyster Creek
Issue date: 03/20/1989
From: J. J. Barton
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
IEIN-86-018, IEIN-86-18, NUDOCS 8903290379
Download: ML20247B392 (3)


Text

)

l J

GPU Nuclear Corporation Nuclear  ; g = = s88 Forked River,New Jersey 08731-0388 l) 609 971-4000 l Writer's Direct Dial Number:

March 20,1989 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 SJdect: Oyster Creek Nuclear Generating Station Docket No. 50-219 Subject License Questionnaire: NRC Expanded Activation Site Team

Dear Sir:

Please find enclosed the completed subject questionnaire. Should you have any questions, please contact Brenda DeMerchant, Oyster Creek Licensing Engineer, at (609) 971-4642.

Very truly yours, John J. b ton Deputy D: ector Oyster Creek JJB:bdm:aa Enc.

(0712A):05 cc: Mr. William T. Russell, Administrator Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 l Mr. Alexander W. Dromerick, Project Manager U.S. Nuclear Regulatory Commission Division of Reactor Projects I/II Washington, DC 20555 NRC Resident Inspector Oyster Creek Nuclear Generating Station Yj i l

Forked River, NJ 08731 I 8903290379 890320

  • I l

PDR ADOCK 05000219 i P PNV GPU Nuclear Corporation is a subsidiary of the General Public Utilities Corporation

ii Q 1 ,

u .

Licensee Expanded Activation Site Team Survey.

Name of Facility: cct3S Date of

Contact:

Point of

Contact:

R.L. Sullivan Inspector: C. Amato 1.

Is the licensee preceed familiar with IE Information Notice 86-18:'(If answer is no, to item 13)

NO:

?.

Who in the licensee-organization is responsible for addressing the suggestions contained in the Notice:

No One Identified:

Contact:

R.L. Sullivan 3.

During a major event, what is the maximum number of NRC personnel that can be assigned to the EOF in the licensee's opinion controllers, observers, etc. will not be presen(emphasize t during aexercise real event):

10

4. During a major event, what is the maximum number of NRC personnel that can be assigned to the TSC in the licensee's opinion (emphasize exercise controllers, observers, etc will not be present during a real event):

-10

5. For a major event response, has the licensee designated overflow facilities f
  • the NRC response team members not assigned to the EOF or TSC (e.g.

c.. porate offices, annex, etc):

Yes

6. If yes to number 5, identify location of overflow facility in relation to the EOF or TSC, and/or geographic proximity to the s'.te:

Second floor of building housing EOF.

NBC Residents Office - Site Dnergency Bld. - next to TSC

7. How many NRC staff personnel.will each overflow facility accomodate:

12

8. What type of communications capability available for NRC use does each overflow facility have; e.g., approximate number of telephone lines, facsimile equipment etc. (estimates are sufficient):

TSC Xerox copier EOF Xerox copier 2 - outside phone lines 1 - Outside phone line 1 - Inside extension

L-.; g -

e

.O' 4 l e

9A.

Are there sufficient communications in each overflow facility for continuous NRC connunications with:

EOF - Yes TSC - Yes Emergency News Center - No Federal Radiological Monitoring Assessment Center (FRMAC) - No Federal Response Center (FRC) - No State EOC - No Base Team - No NRC Operations Control Center - Yes State Field Operations Center (SFEOC) - No 9B.

Should additional communications equipment be brought to each overflow necessary: facility lii-fax machineby the NRC? If yes, list items which may be Field radio / phone for carunication 2/ facilities of 9A above.

10. _Are there any particular equipment needs the NRC response team members will need when using each overflow facility:

No TJB. Should additional equipment be brought to each overflow facility by the NRC?

If yes, list items which may be necessary:

No

11. Are the additional overflow facilities hardened?

No

12. Are 15ere any other special considerations that should be known in advance about a particular overflow facility:

2e EDF and its overflow facility are housed in an operating utilities business office. During working hours, business will be conducted as usual.

13. If the licensee has not yet considered the suggestions in Information Notice 86-18, are there any plans to do so in the near future and who is or will be assigned the planning responsibility: '

N/A

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - - - - - - - - - - - - - - - - - - - - - - - -