Ltr Contract NRC-39-89-133,awarding Task: Data Entry Support for Sinet, to NRC Sys Data Entry
ML20247B385
Person / Time
Issue date: 03/16/1989
From: Edgeworth P
NRC OFFICE OF ADMINISTRATION (ADM)
To: Hutchens T
DATA COMPUTER CORP. OF AMERICA
Shared Package
ML20247B360 List:
References
CON-FIN-D-1920, CON-NRC-39-89-133 NUDOCS 8903290376
Download: ML20247B385 (5)


Text

,

(

pnMo uq'o, UNITED STATES

+["

h NUCLEAR REGULATORY COMMISSION g

l WASHINGTON, D. C. 20555

\\

/

    • ao s VA~-

Data Computer Corporation of America Attn:

Thomas E. Hutchens Executive Vice President P.O. Box 2665 Columbia, MD 21045

Dear Mr.1lutchens:

Subject:

Task Order No. 5 Entitled, " Data Entry Support for SINET,"

Under Contract No. NRC-39-89-133 This confirms verbal authorization provided to you on January 31, 1989, to commence work under the subject Task Order with a temporary ceiling of

$4,000.00, s

In accordance with the task order procedures of the subject contract, this letter definitizes Task Order No. 5.

This effort shall be performed in accordance with the enclosed' Statement of Work and the Contractor's proposal for this Task Order No. 5 dated January 31, 1989, incorporated herein by reference.

Task Order No. 5 shall be in effect from February 1,1989 through January 31, 1990, with a total cost ceiling of $34,574.00.

The amount of

$32,162.00 represents the total estimated reimbursable costs and the amount of $2,412.00 represents the fixed fee.

The total cost ceiling of $34,574.00 is inclusive of the $4,000.00 verbally authorized as discussed above.

Accounting Data for this Task Order No. 5 are as follows:

B&R No.:

40-20-07-25 FIN No.-

D-1920 APPN No.-

31X0200.409 OBLIGATED AMOUNT:

$34,574.00 The issuance of this Task Order does not amend any torms or conditions of the subject contract.

Your contacts during the course of this Task Order are:

Technical Matters:

John Bell, Project Of ficer (301) 492-9561 Contractual Matters:

Edna Knox, Contract Administrator (301) 492-4731 9903290376 890316 PDR C ONTR NRC-39-89-133 PNV

i

~

NRC-39-89-133 Task Order No. 5 Please indicate your acceptance of this Task Order No. 5 by having an official, authorized to bind your organization, execute three copies of this document in the space provided and return two copies to the Contract Administrator. You should retain the third copy for your records.

Sincerely,

,) Edg0~A onth, Contracting Officer

- ul Cont act A ministration Branch Division of Contracts and Property Management i

Office of Administration j

l

Enclosure:

As stated ACCEPTED:

rmtw fbs m

l (Signature)

Nf6e bl/E t/P l

(Title) l

't -/l"V$

(Date) 4 l

I f

}

l Ei.

v'-

m

.I upttTE3 STATES

(

'g NUCLEAR REIULATORY COMMIS$10N o

3 I

wasu m oroer,e,c.aoses Task Order Number k*****

NRC-39-89-103 DATA COMPUTER CORPORATION OF AMERICA 5

To Be Completed By Task Mana9er TASK ORDER REQUEST FOR PROPOSAL.

Task Order

Title:

Data Entry Support for SINET 6000

/

SINET System Number /Name:

User Contact / Phone / Organization:

John Sullivan

/ 492-7979

/

ARM I

02/01/89 01/31/90 Requested Period of Performance: From Through TAC #:

A64081 STATEMENT OF WORK See Attachments I & II I

I l

Task Manager Signature j

[ [

_,w Date

/

4 9

l l/

'O v

n

(

(

ATTACHMENT I

-q l

Data Entry Support For SINET i

TASK ORDER #5 BACKGROUNO:

An a result of the development of a Safety Information Network, the Nuclear Regulatory Commission (NRC) has a need for data entry support for input of Licensee Event Reports (LERs) into an automated system residing at the NIH computer facility in Bethesda, Maryland.

1 J

STATEMENT OF WORK:

The contractor shall perform the data entry work at the NRC site in Bithesda, Maryland, using IDMS/R ADSO data input screens. This system resides at the NIH computer facility in Bethesda, Maryland. A source document for the data entry is presented in Attachment II (the data elements that will probably require entry have been circled).

It will consist of approximately 16 c'sta elements plus text (the abstract) averaging about 15 eighty character lines.

The "backfit" portion of the job shall consist of approximately 225 source documents. Simple instructions and training will be' provided to the data entry person at the NRC site. After an initial brief break-in period, it is i

anticipated that each document will take about 15-20 minutes to complete.

1 This is expected to be a one person' job, because only 1 work station will be available.

Input quality assurance and any resulting corrections shall be j

the responsibility of the contracto.T.

-l 1

In addition to backfit LER data, NRC receives about 10-15 LERs daily.

]

The contractor shall enter LERs 5 days per week, 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> per day rom obriiary TD989 through June 2,1989, and 24~nours per weeY (pref re y Tuesday, Wednesday and Thursday) from June 5, 1989 through Ja ry 31, 1990.

J l

The performance of this task order shall be from February 1,1989 through January 31, 1990.

The estimated level of effort is 2000 hours0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br />.

(

Page Ib umTosim

  • g NUCLEAR REEULATORY COMMISSION

[

a WASHING 7086. O. C. 20MB Task Order Ntsnbe?

NRC-39-89-133 5

DATA COMPUTER CORPORATION OF AMERICA To Be Completed By Project Officer Task Order Titie:

Data Entry Support for SINET System Number /Name:

6000

/

SINET SCHEDULE OF DELIVERABLES

~

Item Quantity form Date of. Deliver y*

(ifappTicable)

Computer Files As Required i s, l

l

  • Number of working days following effective date of Task Order

!J///

Da c 1/ 7f> / nq Project Of ficer Signature r

l

,y..-------

(

~

s-s TASK onpEx e J

/'

ATTA CllM $ N T f,.

as N.me ene, sees.eeen t}CENSEE EVENT REPORT (LER)

""**'*'m i

pavTr==u a 3

nas a Limerick Ceneratine Station -- Unit j ojsleleI.oftlpgp : lorl017


......./

,srety pelier Valve Setpoint Drift du to Corrosion Bonding

)

e h m.,e n

1

". m=4 um _ __

.et**.r* ta

      • '^c"3"""*"**d_
o. red ali-- I'u m vem l v.f ";gy b L*y; e,oertie ear

'em

  • "***4"*

_T r

/

0 l'f8f8 18 f f l i lbN N

0]

~

%,Q h.) -,, 'flli E dfddl8) If M & 7

' l'I'l'f'l II

~~f

. --- ~ - n m -- - - \\Wco. ta,om e

- - ~** * &

/

7

\\

,~

?-

1 ~~a,

( Tw

" *"8a a *

n, =,w.

Q

[

w.=wne e A

easm.ames J m..m wim.

sesa. sam cas a=4 y'

(

asweas.

v.

.s 1

m unre.<

l

.ns mna,ee mmann tc. us ca.,vact coa ri (s. nu l

.. ~..

u N

.W M

i

.Charl.ssJ nHengere enicr..EngineerifLicerising!E' deEon

[211f5 6 f 4 i !1-15 l'118 f M. S e

w

(

=,. _.... -,.. w J

'#4854 874T8*

Cowo=s.T f

  • [dY $,~.

h..f

.n...,

, m -

Cause tytfted Co.ac e.rY f

Qu ggky j

a cmaw.

wwsw f

l

~

{

/

ed[5;"$5%dk B S1B f f Rf V T l 0f 2f0 Yes

&a.mm$TW N

M i I I k i V1

_ m

\\

C J- ~ =

- -IT14)I PI 01 -Ires fI wM 4p.mqg ogm l RIM l ID I VJ Tlo f Pl 0 Yes M

S IB l ! RIV Tl01210 Yes / MINh!

n ~ m..n a.. n.

~

+,

nm (8 4GEO

] ' s r. - <e <cr<o n..,w o. $ r,,

o p,

, [

a,W'c' ~ ~f ~_--- q._

c Abstract:

87-034

--. ~

/

Pressure setpoint testing of the 14 Target Rock Hodel 7567 F pilot operated safety relief valves (SRVs) during the first refueling outage revealed that only four SRVs lifted within + lt of the nameplate setpoint.

In order to be considered'operabTe in i

accordance with Technical Specification 3.4.2 the valve must lif t i

(

within.+ 11 of its setpoint value.

There were no adverse I

conditions and no release of radioactive material associated with

?

this event.

Corrosion bonding'between the Stellite pilot valve disc and Stellite seat and labyrinth seal clearance restriction I

is considered to have caused the over 31 cetpoint drif t of the SRVs (see figures 1 and 2).

All 14 SRVs were replaced with spares that had been setpoint certified in 1986.

Mechanical Engineering in. conjunction with the Boiling Water Reactor Owner's Group (BWROG) is evaluating a pilot disc material change to j'

reduce the effects of corrosion bonding between the pilot disc and sea t.

SRVs which identify labyrinth seal induced friction yill be reworked to maintain the design clearance between the pi-lo Q od and liner.

f q

0.$

S."

0"400332 nne a