Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20247E857 + (01:56:53, 2 December 2024)
- ML20247E856 + (01:56:53, 2 December 2024)
- ML20247E853 + (01:56:54, 2 December 2024)
- ML20247E855 + (01:56:54, 2 December 2024)
- ML20247E850 + (01:56:55, 2 December 2024)
- ML20247E849 + (01:56:55, 2 December 2024)
- ML20247E848 + (01:56:56, 2 December 2024)
- 05000414/LER-1989-017-02, :on 890731,during Monthly Surveillance Testing on Turbine Driven Auxiliary Feedwater Pump,Turbine Repetitively Tripped on Mechanical Overspeed.Caused by Pitting & Corrosion on Valve Stem + (01:56:58, 2 December 2024)
- ML20247E842 + (01:57:03, 2 December 2024)
- ML20247E840 + (01:57:04, 2 December 2024)
- ML20247E839 + (01:57:05, 2 December 2024)
- ML20247E836 + (01:57:09, 2 December 2024)
- IR 05000289/1989015 + (01:57:11, 2 December 2024)
- ML20247E833 + (01:57:11, 2 December 2024)
- ML20247E831 + (01:57:12, 2 December 2024)
- L-98-093, Informs That as of 980413 RW Lindsey Has Assumed Position of Director,Operations Training at Beaver Valley Power Station, Units 1 & 2 + (01:57:13, 2 December 2024)
- NRC-89-0083, Forwards Revised Tech Spec Pages to Util 880127 Application for Amend to License NPF-43,per Discussions W/Nrc to Clarify Bases & Titles of Tech Spec Sections & Figures + (01:57:13, 2 December 2024)
- ML20247E828 + (01:57:14, 2 December 2024)
- ML20247E825 + (01:57:15, 2 December 2024)
- IR 05000213/1989004 + (01:57:16, 2 December 2024)
- ML20247E820 + (01:57:17, 2 December 2024)
- ML20247E822 + (01:57:17, 2 December 2024)
- 1CAN038913, Forwards Primary Reactor Containment Integrated Leakage Rate Test, Final Rept + (01:57:18, 2 December 2024)
- ML20247E818 + (01:57:18, 2 December 2024)
- 05000370/LER-1989-007-04, :on 890810,discovered That Unit Operated in Violation of Tech Specs 3.1.2.1a & 3.1.2.3 When Both Centrifugal Charging Pumps Inoperable During Refueling. Caused by Mgt/Qa Deficiency + (01:57:20, 2 December 2024)
- ML20247E814 + (01:57:21, 2 December 2024)
- ML20247E812 + (01:57:22, 2 December 2024)
- ML20247E813 + (01:57:22, 2 December 2024)
- ML20247E811 + (01:57:23, 2 December 2024)
- ML20247E810 + (01:57:24, 2 December 2024)
- 05000348/LER-1989-001-01, :on 890328,fire Door 401 Declared Inoperable Because of Cracks Through Metal Around Striker Plate.On 890414,addl Fire Doors Declared Inoperable Due to Cracks. Fire Watches Established + (01:57:25, 2 December 2024)
- IR 05000352/1989016 + (01:57:26, 2 December 2024)
- ML20247E805 + (01:57:27, 2 December 2024)
- ML20247E799 + (01:57:28, 2 December 2024)
- ML20247E801 + (01:57:28, 2 December 2024)
- ML20247E796 + (01:57:35, 2 December 2024)
- 05000369/LER-1988-049, :on 881123,RHR Pump 1B Lost Suction Pressure & Operations Manually Stopped Pump to Prevent Damage.Caused by Design Deficiency Because Inadequate Sys Venting Allowed Air to Be Trapped.Personnel Vented Nd Train 1A + (01:57:37, 2 December 2024)
- PNO-I-89-078, notifies of Potential Strike by Svcs Personnel on Weekend of 890909-10.Personnel from Bargaining Unit Will Assist Util Staff in Certain Maint & Const Activities & Util Developed Contingency Plan + (01:57:38, 2 December 2024)
- ML20247E792 + (01:57:38, 2 December 2024)
- ML20247E791 + (01:57:39, 2 December 2024)
- ML20247E789 + (01:57:40, 2 December 2024)
- ML20247E788 + (01:57:41, 2 December 2024)
- ML20247E786 + (01:57:42, 2 December 2024)
- ML20247E784 + (01:57:43, 2 December 2024)
- ML20247E779 + (01:57:47, 2 December 2024)
- ML20247E780 + (01:57:47, 2 December 2024)
- ML20247E777 + (01:57:48, 2 December 2024)
- 05000277/LER-1989-014-01, :on 890517,noted That Required Surveillance Test for Radwaste Bldg 116 Ft Elevation Chemical Addition & Laundry Room Smoke Detectors Overdue. Caused by Procedural Deficiency + (01:57:50, 2 December 2024)
- ML20247E775 + (01:57:51, 2 December 2024)
- ML20247E772 + (01:57:53, 2 December 2024)
- ML20247E774 + (01:57:53, 2 December 2024)
- 05000354/LER-1998-003-01, :on 980407,concurrent Inoperability of a & B CR Chillers Was Noted.Caused by Personnel Error. Performed IST Tests,Equipment Repairs,Training & Revised Procedures + (01:57:55, 2 December 2024)