ML20247E813
| ML20247E813 | |
| Person / Time | |
|---|---|
| Site: | U.S. Geological Survey |
| Issue date: | 05/05/1998 |
| From: | Timothy Debey INTERIOR, DEPT. OF, GEOLOGICAL SURVEY |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20247E815 | List: |
| References | |
| NUDOCS 9805180478 | |
| Download: ML20247E813 (1) | |
Text
_ _ _ _
., c, Olllited States Departinellt of tile 1111e1ior c
- ~ ".
GEOI.OGICAI, Sl'RVEY nox 25016
.u.s.SM' DENYFR FEDERAI. CENTER
"' """^""
May 5,1998 i u,,.,,,,,,, n, U.S. Nuclear Regulatory Commission Document Control Desk Washington DC 20555
Dear Sirs:
The attached pages are corrected pages for the 1997 annual report of the U.S.
Geological Survey TRIGA reactor facility that was origi.lally submitted on February 2,1998 in accordance with license conditions. The corrections are data that are shown in bold print in Section IV, Tables 1 and 2. The corrections are a result of a recent audit by the Reactor Operations Committee.
The facility license is R-113 and the docket number is 50-274.
Sincerely, W
Timothy M. DeBey Reactor Supervisor
\\\\
v 0
\\
9805100478 980505
~
PDR ADOCK 050 24 R
7
- -_