Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20042E773 + (22:28:42, 19 December 2024)
- ML20042E775 + (22:28:42, 19 December 2024)
- ML20042E771 + (22:28:43, 19 December 2024)
- ML20042E769 + (22:28:44, 19 December 2024)
- ML20042E768 + (22:28:45, 19 December 2024)
- ML20042E766 + (22:28:46, 19 December 2024)
- ML20042E765 + (22:28:46, 19 December 2024)
- ML20042E764 + (22:28:47, 19 December 2024)
- TAC:76437 + (22:28:48, 19 December 2024)
- ML20042E762 + (22:28:49, 19 December 2024)
- ML20042E761 + (22:28:50, 19 December 2024)
- ML20042E758 + (22:28:51, 19 December 2024)
- ML20042E757 + (22:28:52, 19 December 2024)
- ELV-01516, Requests Approval to Return Facility to Mode 2 & Subsequent Power Operation,Per 900320 Event Re Loss of Offsite Power Concurrent W/Loss of Onsite Emergency Diesel Generator Capability + (22:28:54, 19 December 2024)
- ML20042E750 + (22:28:54, 19 December 2024)
- ML20042E743 + (22:28:57, 19 December 2024)
- ML20042E742 + (22:28:59, 19 December 2024)
- ML20042E739 + (22:29:00, 19 December 2024)
- ML20042E737 + (22:29:01, 19 December 2024)
- NUREG-1319, Provides Third Rept of Nuclear Safety Research Review Committee 8900523 & 24 Meetings Re NRC Disposition/ Implementation of Recommendations of Natl Research Council Rept, Revitalizing Nuclear Safety Research + (22:29:02, 19 December 2024)
- TAC:71395 + (22:29:04, 19 December 2024)
- ML20042E733 + (22:29:05, 19 December 2024)
- ML20042E734 + (22:29:05, 19 December 2024)
- ML20042E731 + (22:29:06, 19 December 2024)
- ML20042E730 + (22:29:06, 19 December 2024)
- ML20042E729 + (22:29:07, 19 December 2024)
- ML20042E728 + (22:29:08, 19 December 2024)
- ML20042E727 + (22:29:09, 19 December 2024)
- ML20042E726 + (22:29:19, 19 December 2024)
- ML20042E725 + (22:29:21, 19 December 2024)
- PMNS20200117, Pre-Submittal Meeting with Talen Energy Susquehanna Steam Electric Station, Units 1 and 2, Proposed License Amendment Request to Create New Condition for Inoperable Manual Synchronization Circuit and Institute Completion Time of 14 Days + (22:29:22, 19 December 2024)
- ML20042E723 + (22:29:22, 19 December 2024)
- B13513, Point Site Radiological Environ Monitoring Program,1989 + (22:29:24, 19 December 2024)
- ML20042E717 + (22:29:26, 19 December 2024)
- ML20042E716 + (22:29:30, 19 December 2024)
- ML20042E713 + (22:29:31, 19 December 2024)
- ML20042E711 + (22:29:32, 19 December 2024)
- ML20042E709 + (22:29:33, 19 December 2024)
- NRC-90-0078, Responds to NRC Bulletin 90-002, Loss of Thermal Margin Caused by Channel Bow. Util Has Decided That Fuel Channel Boxes Will Not Be Used After First Bundle Lifetime + (22:29:34, 19 December 2024)
- B13503, Proposed Tech Specs Re Fire Detection Sys,Spray &/Or Sprinkler Sys & CO2 Sys + (22:29:35, 19 December 2024)
- ML20042E701 + (22:29:37, 19 December 2024)
- IR 05000309/1990004 + (22:29:41, 19 December 2024)
- ML20042E697 + (22:29:43, 19 December 2024)
- ML20042E696 + (22:29:43, 19 December 2024)
- GO2-20-006, Summary of Changes and Analysis for Revision 44 of PPM 13.4.1 Emergency Notifications + (22:29:44, 19 December 2024)
- ML20042E693 + (22:29:45, 19 December 2024)
- ML20042E692 + (22:29:46, 19 December 2024)
- ML20042E691 + (22:29:46, 19 December 2024)
- ML20042E688 + (22:29:47, 19 December 2024)
- 05000285/LER-1990-009, :on 900316,potential Overpressurization of Auxiliary Feedwater Piping Could Have Occurred During Thermal Expansion of Process Fluid Between Closed Valved. Caused by Design Deficiencies + (22:29:51, 19 December 2024)
- 05000366/LER-1990-003-02, :on 900328,reactor Scram & Group II Containment Isolation Occurred.Caused by Inadequate Procedure.Procedure Will Be Changed to Require Instruments to Be Pressurized to Process Pressure Before Valved Into Svc + (22:29:53, 19 December 2024)