ML20042E739

From kanterella
Jump to navigation Jump to search
Amend 38 to License DPR-73,modifying Tech Specs to Allow Consolidation of TMI-1 & TMI-2 Radiological Controls Depts Into Site Organization
ML20042E739
Person / Time
Site: Crane Constellation icon.png
Issue date: 04/26/1990
From: Stolz J
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20042E735 List:
References
NUDOCS 9005030021
Download: ML20042E739 (4)


Text

-.. -.

[%p* %gk UNITED STATES NUCLEAR REGULATORY COMMISSION a

HAsemotow. o. c. rosos

?

g NUCLEAR CORPORATION

-DOCKET N0. 50-320 THREE MILE ISLAND NUCLEAR STATION, UNIT NO.__t AMENDMENT TO FACILITY OPERATING LICENSE i

Amendment No. 38-License No. DPR-73 1.

The Neclear Regulatory Comission (the Comission) has found that:

A.

The application f or amendment by GPU Nuclear Corporation, (thelicensee)datedNovember 23, 1988, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (theAct),andtheCommission'srulesandregulationsset forth in 10 CFR Chapter I; l

t B.

The facility will o>erate in conformity with the application, i

the provisions of tie Act, and the rules and regulations of the Comission; l

C.

Thereisreasonableassurance(1)thattheactivitiesauthorized f

by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public, and E.

The issuance of this amendment is in accordance with 10 CFR Part i

51 of the Commission's regulations and all applicable requirements I

have been satisfied.

J 990665*d%CT f 20 FDR ADO PDC P

l

I

=*

d

~2~

l-I

2..

Accordingly,- the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.c.(2) of Facility Operating License

'No. DPR-73-is hereby amended to read as follows:

1 (2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 30, are hereby incorporated in the license. GPU Nuclear Cor? oration shall operate the facility in accordance wita the Technical Specifications.

3.

This license amendment is effective as of its date of issuance, to be i

implemented within 30 days of issuance.

FOR THE NUCLEAR' REGULATORY COMMISSION

/)

r-O

. w /

.$ )

/.l Y oh' 1. Stolz,< Director /

[DivisionofReactorProjects-1/II Pro ect Directorate I-4 Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance:

April 26, 1990

+

i e.-

-,.e

,,-.-.~.w

. +,, - -

,.e.-,

ATTACHMENT TO LICENSE AMENDMENT NO. 38 FACILITY OPERATING LICENSE NO. DPR-73 DOCKET h0. 50-320 Replace the following page of the Appendix A Technical Specifications with the attached page. The revised page-is identified by amendment tiumber and contains a vertical line indicating the area of change, Remov,e Insert 6-3 6-3 n.

l 1

i f

6 J

ve

4 kDMINISTRATIVECONTROLS l

6.3 UNIT STAFF QUALIFICATIONS l

6.3.1 Each member of the unit staff shall meet or. exceed the minimum quali-fications of ANSI-N 18.1 of 1971 for comparable positions unless otherwise noted in the Technical. Specifications.

During Modes 2 and 3, the requirements of ANSI N18.1-1971, that pertain to unit staff operator license L

qualifications shall not apply.

1 6.3.2 The Management position responsible for radiological controls shall meet or exceed the qualifications of Regulatory Guide 1.8 of 1977.

Each t

Radiological Controls Technician in responsible positions / Foreman shall meet or exceed the qualifications of ANSI 18.1-1971, paragraph 4.5.2/4.3.2, or be formally qualified through an.NRC approved TMI-2 Radiation Controls training program.

Individuals who do not meet ANSI 18.1-1971 Section.4.5.2 are not considered technicians for purposes of determining qualifications but are permitted to perform work for which qualification has been demonstrated.

All l

Radiological Controls Technicians will be qualified through training and examination in each area or specific task related to their radiologiual I

controls functions prior to their performance of those tasks.

6.4 TRAINING l

6.4.1 A retraining and replacement training program.for the unit staff shall be maintained under the cognizance of the Plant Training Manager and shall meet or exceed the requirements and recommendations of Regulatory Cuide 1.8 of 1977 Appendix "A" of 10 CFR Part 55 except that Radiological Controls training may

+

be under the direction of Vice President-Radiological and Environmental Controls.

6.4.2 A training program for the Fire Brigade shall be maintained under the direction of the Plant Training Manager and shall meet or exceed the require-ments of+Section 27 of the NFPA Code-1976.

6.5 REVIEW AND AUDIT 6.5.1 Technical Review and Control The.0ffice of THI-2 Division Director and Support Division.Vice-Presidents within GPU Nuclear Coporation as indicated in Organization Plan Figure 1.1, shall be responsible for ensuring the preparation, review, and approval of documents required by the activities within their functional area of respon-sibility for TMI-2.

Implementing approvals shall be performed at the cogni--

zant section manager / director level or above.

Independent safety review and audit shall be conducted in accordance with this Technical Specification.

l l

THREE MILE ISLAND - UNIT 2 6-3 Amendment No. 38

_