Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20043C770 + (20:57:26, 19 December 2024)
- ML20043C766 + (20:57:27, 19 December 2024)
- ML20043C768 + (20:57:27, 19 December 2024)
- ML20043C763 + (20:57:28, 19 December 2024)
- ML20043C760 + (20:57:29, 19 December 2024)
- ML20043C759 + (20:57:30, 19 December 2024)
- B13529, Forwards Bimonthly Progress Rept 22 Re New Switchgear Bldg Const,Per 860930 Commitment.All Const Work Complete Except Minor Punchlist Items + (20:57:31, 19 December 2024)
- ML20043C754 + (20:57:33, 19 December 2024)
- ML20043C752 + (20:57:34, 19 December 2024)
- U-601676, Forwards Rev 20 to Illinois Power Nuclear Program QA Manual. Rev Evaluated by Util as Not Reducing Quality Program Commitments + (20:57:36, 19 December 2024)
- B13515, Annual Reporting of Changes to & Errors in ECCS Models or Applications for 881017-891231 + (20:57:38, 19 December 2024)
- ML20043C746 + (20:57:40, 19 December 2024)
- ML20043C745 + (20:57:41, 19 December 2024)
- JPN-90-040, Forwards Structural Evaluation of Indications in Reactor Top Head at Ja Fitzpatrick Power Station, Based on Evaluation Analyses for Flaw Indications Identified During Routine Inservice Insps + (20:57:42, 19 December 2024)
- 05000498/LER-1990-007-01, :on 900430,discovered That All Three Trains of ESFAS Placed in Test & Incapable of Actuating for Approx 35 Minutes.Caused by Inadequate Prerequisite Conditions in Maint Procedure.Procedure Being Modified + (20:57:45, 19 December 2024)
- ML20043C731 + (20:57:53, 19 December 2024)
- 05000321/LER-1990-008-01, :on 900505,determined That Reactor Vessel Head Vent Valves 1B21-F004 & 1B21-F005 Closed Contrary to Tech Spec 3.7.C.2.a(2) Requirements.Caused by Cognitive Personnel Error.Reactor Vessel Head Vent Valves Reopened + (20:57:55, 19 December 2024)
- ML20043C726 + (20:57:57, 19 December 2024)
- ML20043C721 + (20:57:58, 19 December 2024)
- ML20043C719 + (20:58:03, 19 December 2024)
- ML20043C716 + (20:58:05, 19 December 2024)
- ML20043C714 + (20:58:06, 19 December 2024)
- IR 05000005/1990001 + (20:58:07, 19 December 2024)
- ML20043C708 + (20:58:08, 19 December 2024)
- ML20043C706 + (20:58:09, 19 December 2024)
- ML20043C705 + (20:58:10, 19 December 2024)
- ML20043C703 + (20:58:12, 19 December 2024)
- ML20043C702 + (20:58:13, 19 December 2024)
- ML20043C701 + (20:58:14, 19 December 2024)
- ML20043C696 + (20:58:28, 19 December 2024)
- ML20043C693 + (20:58:29, 19 December 2024)
- ML20043C691 + (20:58:30, 19 December 2024)
- ML20043C686 + (20:58:34, 19 December 2024)
- ML20043C685 + (20:58:35, 19 December 2024)
- ML20043C677 + (20:58:40, 19 December 2024)
- ML20043C675 + (20:58:41, 19 December 2024)
- 05000416/LER-1990-006, :on 900502,review of Effluent Sample Analysis Revealed That Turbine Bldg Ventilation Exhaust Had Not Been Analyzed Exceeding Time Limit.Caused by Personnel Error. Training & Counseling Conducted + (20:58:43, 19 December 2024)
- ML20043C672 + (20:58:45, 19 December 2024)
- ML20043C671 + (20:58:46, 19 December 2024)
- ML20043C667 + (20:58:47, 19 December 2024)
- ML20043C651 + (20:59:05, 19 December 2024)
- ML20043C649 + (20:59:12, 19 December 2024)
- ML20043C643 + (20:59:14, 19 December 2024)
- ML20043C642 + (20:59:15, 19 December 2024)
- ML20043C641 + (20:59:16, 19 December 2024)
- ML20043C637 + (20:59:17, 19 December 2024)
- ML20043C632 + (20:59:19, 19 December 2024)
- ML20043C629 + (20:59:21, 19 December 2024)
- ML20043C628 + (20:59:28, 19 December 2024)
- ML20043C622 + (20:59:30, 19 December 2024)
- BVY-90-063, Forwards YAEC-1659-A, Simulate-3 Validation & Verification + (20:59:31, 19 December 2024)