Forwards Insp Rept 50-461/90-05 on 900314-0514.Violations Re Shutdown Svc Water Sys Having Inadequate Flow from Ultimate Heat Sink to Safety Components,Noted.Licensee Will Be Notified of Decision on Enforcement Action by Separate Ltr
ML20043C651
Person / Time
Site: Clinton Constellation icon.png
Issue date: 05/31/1990
From: Miller H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Jamila Perry
ILLINOIS POWER CO.
Shared Package
ML20043C652 List:
References
EA-90-108, NUDOCS 9006060008
Download: ML20043C651 (2)


See also: IR 05000461/1990005

Text

7-~

'

ei

i

O

hmY 311990

Docket No. 50-461

EA 90-108

1111nois Power Company

ATTN:

J. S. Perry

Vice President

Clinton Power Station

Mail Code V-275

P. O. Box 678

Clinton, IL 61727

Gentlemen:

This refers to the special team inspection conducted by Mr. J. F. Schapker and

others of this office during March 14 through May 14, 1990, of activities

related to the inadequata design flow through components using the shutdown

service water system for cooling water at the Clinton Power Station authorized

,

by NRC Operating License No. NPF-62 and to the discussion of our findings with

Mr. J. S. Perry at the conclusion of the inspection.

This inspection also

reviewed the licensee's actions associated with Generic Letter (GL) 89-13,

" Service Water System Problems Affecting Safety-Related Equipment".

The enclosed copy of our inspection report identifies areas examined during

the inspection.

Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

Dcring the course of this inspection, certain activities appeared to be in

violation of NRC requirements. These deficiencies concerned the Shutdown

Service Water System having inadequate flow from the ultimate heat sink to

certain safety-related components. The apparent violations, described in

Paragraphs 2.a., 2.c., 2.f., and 4. of this report, are being reviewed for

potential enforcement action.

You will be notified by separate correspondence

of our decision regarding enforcement action.

No written response is required

until you are notified of the proposed enforcement action.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

,y

0

oog 999331

OCK 05000461

0

PDC

< g 01.

.

~ to

1

-

_ - - .

_

__ _

. _ _ _ _

_ - _ _ _

=?

T

,

n
e

,

,,; A

o

MAY_ 311990

-

Illinois Power Company

2

o

We will gladly discuss any questions you have concerning .this inspection.

^

Sincerely,

(g;AL r;GNED BY !!UBEitT j. illLLEI

Hubert J. Miller, Director

Division of Reactor Safet)

o

,

,-

Enclosures:.

p

1.

Inspection Report

'

No.50-461/90005(DRS)-

..

2.

Division 1 EDG Engine

Closed Cooling Water

. Sy stem -

3.-

Division 1 SX Schematic

4..

DP-Measurements

5. . Heat Transfer Correlations

6.

Table 1 - Ficws through

Components in SX System

cc w/ enclosures:

J. Cook, Manager, Clinton Power Station

F. Spangenberg, III, Manager -

Licensing and Safety

DCD/DCB (RIDS)

Licensing Fee Management Branch

Resident Inspector, Rlll

b5 a ~T L d u e , O E.

.B

n

d,

egion 11

E b IO "O'

'

D. Jarrell, Battelle

Z Pa<UoA AU R-

D ' **~C '

-0. McCaff rey, Chief. Public:

b. AdodD3

A

-Utilities Division

L

H. Taylor, Quality Assurance

Division, Sargent & Lundy

Engineers

. Patricia O'Brien, Governor's

Office of Consumer Services

S.:Zabel Esquire, Schiff, Hardin,

',.

&'Waite

L. Larson, Project Manager,

General Electric Company

Chairman, DeWitt County Board'

Illinois Department of

$

' Nuclear. Safety

.

-

R1

RI

Rlli

RIlg

'

R

Rlli

Rill

ubb

htin

(i er

S

p r/jk-

La

ury Da e on

g

e

O' /: 0/90' ~

05/. /90 05/3/90 05do/90 05/3o/90 05/g/90 05/s /90 05/g/90

c'

Q.

\\

l