Informs NRC of Need to Revise Reg Guide 1.97 Commitment Re Installation of post-accident Neutron Flux Recording Device. Items 1 & 2 Completed During 1990 Refueling Outage
ML20043C671
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 05/31/1990
From: Walt T
PORTLAND GENERAL ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RTR-REGGD-01.097, RTR-REGGD-1.097 NUDOCS 9006060033
Download: ML20043C671 (2)


Text

___

3' cf j

4_

n-5

'b i

May'31, 1990

!9 Trojan Nuclear Plant Docket 50-344; e

License NPF-1

<f

'L U.S. Nuclear Regulatory Commission

. Attn: Document Control Desk Washington DC 20555

Dear Sirs:

Regulatory, Guide 1.97 Revised Comitment Implementation The intent. of this. letter.is to inform the Nuclear Regulatory Comission (NRC) of the need to revise a Regulatory Guide 1.97 comitment concerning installation of post-accident neutron flux recording devices, provide a' brief explanation for the revised commitment, provide the current status-of the comitment, and: identify when the comitment will. be ' completed.

In a letter to the NRC dated January 26, 1987, Portt....I General Electric e

Company (PCE) comitted to complete the following three items by the end of s

l-the 1990 refueling outage:

(1) install a redundant post-acciisnt neutron l-flux instrumentation channel, (2) make all connect:.ons to the Technical Support Center computer and Emergency Operations. Facility regarding l

post-accident neutron flux, and (3) provide recording of both channels of post-accident neutron flux indication.

During the 1990 refueling outage, Items 1 and 2 above have been completed.

Item 3 (installation of redundant post-accident neutron flux channel recorders) has not been completed.

9006060033 900531 PDR ADOCK 05000344 i

i P,

PDC 00 0

/

121 S.W Sa ron Street. Portand, Oregon 97204 1'

Q

i-4

pl,,

e s

Document Control Desk May 31,1990-4 page 2 PGE experienced difficulty in-identifying a qualified recorder supplier in

~

sufficient time to meet the original comitment. However, a qualified' recorder supplier has been identified; the recorders have been ordered and are expected to be onsite early in the third quarter of 1990. The

.]

cecorders will be installed by September 20, 1990 assuming no further..

delays from the supplier.

Sincerely, Y

s-

- T. D.> Walt Acting Vice President, Nuclear.

c:

Mr. John B. Martin Regiona1' Administrator, Region V U.S. Nuclear Regulatory Comission Mr. David Stewart-Smith State of Oregon

-Department of Energy Mr. R. C. Barr NRC Resident Inspector Trojan Nuclear Plant r

)

n.-

..m,--

ns,

..n.,-.,-,,w--


,~,.~,-,.o.-


E