Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20043G462 + (20:00:01, 19 December 2024)
- IR 05000290/2009001 + (20:00:08, 19 December 2024)
- NLS9000224, Forwards Endorsements 72-78 to Maelu Policy MF-70 & Endorsements 88-94 to Nelia Policy NF-200 + (20:00:09, 19 December 2024)
- ML20043G456 + (20:00:12, 19 December 2024)
- ML20043G454 + (20:00:12, 19 December 2024)
- IR 05000424/1990008 + (20:01:13, 19 December 2024)
- TAC:74844 + (20:01:14, 19 December 2024)
- ML20043G452 + (20:01:15, 19 December 2024)
- NRC-90-0092, Monthly Operating Rept for May 1990 for Fermi 2 + (20:01:17, 19 December 2024)
- ML20043G448 + (20:01:20, 19 December 2024)
- 05000311/LER-1990-021, :on 900515,radiation Monitoring Sys Channel 2R12A Failed Resulting in ESF Signal Actuation for Containment Purge/Pressure Vacuum Relief Sys Isolation. Caused by Equipment/Design Concerns + (20:01:24, 19 December 2024)
- ML20043G437 + (20:01:26, 19 December 2024)
- BVY-90-070, Requests Temporary Waiver of Compliance from Tech Spec Requirements for Limiting Conditions for Operation for Certain post-accident Monitoring Instrumentation Listed in Tech Spec Table 3.2.6.Parameters Listed + (20:01:27, 19 December 2024)
- ML20043G433 + (20:01:30, 19 December 2024)
- ML20043G429 + (20:01:31, 19 December 2024)
- ML20043G426 + (20:01:32, 19 December 2024)
- ML20043G425 + (20:01:33, 19 December 2024)
- ML20043G423 + (20:01:40, 19 December 2024)
- IR 05000327/1990015 + (20:01:41, 19 December 2024)
- 05000425/LER-1990-001, :on 900103,misleading Task Sheet Leads to Inadequate Tech Spec Surveillances Found.Caused by Deficient Technical Review of Rev to Sts.Personnel Involved Counseled Re Importance of Reviewing Procedure Carefully + (20:01:43, 19 December 2024)
- ML20043G417 + (20:01:52, 19 December 2024)
- IR 05000309/1990006 + (20:01:55, 19 December 2024)
- ML20043G415 + (20:01:58, 19 December 2024)
- ML20043G412 + (20:01:59, 19 December 2024)
- ML20043G410 + (20:02:01, 19 December 2024)
- ML20043G407 + (20:02:02, 19 December 2024)
- ML20043G403 + (20:02:04, 19 December 2024)
- ML20043G402 + (20:02:04, 19 December 2024)
- ML20043G400 + (20:02:06, 19 December 2024)
- IR 05000344/1990006 + (20:02:09, 19 December 2024)
- 05000423/LER-1990-014, :on 900519,manual Reactor Trip Initiated as Result of Anticipated Turbine Trip Due to Condenser Vacuum. Caused by Design Deficiency in That Traveling Screen Capacity Inadequate.Traveling Screen Modified + (20:02:11, 19 December 2024)
- NLS9000220, Forwards Endorsements 14 & 15 to Nelia Policy N-41 & Maelu Policy M-41,respectively + (20:02:13, 19 December 2024)
- 0CAN069001, Responds to Violations Noted in Insp Repts 50-313/90-04 & 50-368/90-04.Corrective Actions:Decision Made to Staff Unit 1 Exit Location Point W/Health Physics Technician 24 H Per Day + (20:02:16, 19 December 2024)
- ML20043G377 + (20:02:18, 19 December 2024)
- TAC:76654 + (20:02:19, 19 December 2024)
- ML20043G374 + (20:02:19, 19 December 2024)
- ML20043G372 + (20:02:26, 19 December 2024)
- 3F0690-08, Forwards 1990 Internal Cash Flow Projection for Plant Which Updates Utils Utilization of Alternative (E) + (20:02:27, 19 December 2024)
- ML20043G369 + (20:02:29, 19 December 2024)
- LR-N20-0012, Technical Specification 6.9.1.5.b: 2019 Annual Report of SRV Challenges + (20:02:30, 19 December 2024)
- ML20043G365 + (20:02:30, 19 December 2024)
- ML20043G362 + (20:02:31, 19 December 2024)
- ML20043G358 + (20:02:34, 19 December 2024)
- ML20043G356 + (20:02:35, 19 December 2024)
- 05000293/LER-1990-008, :on 900513,automatic Scram Resulting from Load Rejection Occurred While at Full Power,Resulting in Trip of Generator Field Breakers.Caused by Fault on Offsite 345 Kv Transmission sys.Loss-of-field Relay Replaced + (20:02:36, 19 December 2024)
- ML20043G351 + (20:02:38, 19 December 2024)
- ML20043G347 + (20:02:39, 19 December 2024)
- W3P90-1147, Requests That All NRC Correspondence Re Plant Be Addressed to RP Barkhurst at Address Indicated in + (20:02:40, 19 December 2024)
- ML20043G345 + (20:02:40, 19 December 2024)
- ML20043G342 + (20:02:42, 19 December 2024)
- ML20043G338 + (20:02:47, 19 December 2024)