ML20043G417

From kanterella
Jump to navigation Jump to search
Notice of Violation from Insp on 900501-31.Violation Noted:On 900427,improperly Installed Agastat Relay to 1DA Bus Under Voltage Trip Control Logic Resulted in ESF Actuation of Diesel Generator
ML20043G417
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 06/11/1990
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To:
Shared Package
ML20043G411 List:
References
50-395-90-15, NUDOCS 9006200261
Download: ML20043G417 (2)


Text

-

i ENCLOSURE 1 4

b NOTICE OF VIOLATION South Carolina Electric & Gas Docket No. 50-395 V. C Summer Nuclear Station License No. NPF-12 During the Nuclear Regulatory Commission (NRC) inspection conducted on May 1 -

31, 1990, a violation of NRC requirements was identified.

In accordance with h

the " General Statement of Policy and Procedure for NRC Enforcement Actions,"

,u 10 CFR Part 2, Appendix C (1990), the violation is listed below:

Technical Specification 6.8.1.a requires that written procedures be y

established, implemented, and maintained for activities referenced in Appendix A of Regulatory Guide 1.33, Rev. 2, February 1978.

Electrical Ll Maintenance Procedure. Agastat Relay Replacement, Rev. 4 EMP-300.012,-

o requires that replacement and reconnection of the relay wires be recorded 4

and verified by two electrical technicians and a quality control inspector.

Contrary to the above, on April 27, 1990, an improperly installed Agastat relay to the 10A bus under voltage trip control logic resulted in an ESF actuation of the A diesel generator when an under voltage signal was present when it actually did not exist.

The root cause of the improperly-installed relay was inadequate verification by the electrical technicians and the Quality Control' inspector of the work activities as described in the Electrical Maintenance Procedure.

This is a Severity Level IV violation (Supplement 1).

Pursuant to the provisions of 10 CFR 2.201, South Carolina Electric & Gas Co.

is hereby required to submit a written statement or explanation to the Nuclear Regulatory Commission, ATTN:

Document Control Desk, Washington, DC 20555, with a copy to the Regional Administrator, Region II, and a copy to the NRC Resident Inspector, V.C. Summer Nuclear Station, within 30 days of the date of m

the letter transmitting this Notice. This reply should be clearly marked as a

" Reply to a Notice of Violation" and should include: (1) admission or denial of the violation, (2) the reason for the violation if admitted, (3) the corrective v

steps which have been taken and the results. achieved, (4) the corrective steps J

which will be taken to avoid further violations, and (5) the date when full compliance will be achieved.

Where good cause is shown, consideration will'be given to extending the response time.

If,an adequate reply is not received within the time specified in this Notice, an order may be issued to show cause 9006200261 900611 ADOCK 0300gb.

Fnn l

4 mk4 4

r A '

, ', " R d j

I Fo M--

. l lt;;.

.9 :W

\\

South Carolina Electric &~ Gas ~

2-Docket No. 50-395 V. C Summer Nuclear Station License No, NPF-12 m.

/

why the license should not be modified, suspended, or revoked or why such other action as may be proper should not.be taken.

p:c.

FOR THE NUCLEAR REGULATORY COMMISSION

.n t.

g w

CA w Day d M. Ver li, Chief Reactor Projects Branch 1 t,

Division of Reactor Projects 1

Dated at Atlanta, Georgia this /rfk day of June,1990 e