NRC-90-0092, Monthly Operating Rept for May 1990 for Fermi 2

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for May 1990 for Fermi 2
ML20043G451
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 05/31/1990
From: Anthony P, Dawson E, Gipson D
DETROIT EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CON-NRC-90-0092, CON-NRC-90-92 NUDOCS 9006200311
Download: ML20043G451 (4)


Text

i R*,"!N5?P*"

., ;3 Tw'e ow n,,,

Reg Guide 1.16 s

lNb $$iSUM"'"

$kI5ons June 15, 1990 NRC-90-0092 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C.

20555

Reference:

Fermi 2 NRC Docket No. 50-341 NRC Operating License No. NPF-43

Subject:

Monthly Operating Status Report for May, 1990 Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for May, 1990. This report includes the Operating Data Report Average Daily Unit Power Level, and the Summary of Unit Shutdowns and Power Reductions identified in NRC Regulatory Guide 1.16 and Fermi 2 Technical Specification 6.9 1.6.

If you have any questions, please contact Patricia Anthony, Compliance Engineer, at (313) 586-1617.

Sincerely, D. R. Gipson Assistant Vice President and Manager, Nuclear Production Enclosure cci A. B. Davis J. R. Eckert D. R. Hahn R. W. DeFayette/W. L. Axelson T. R. Quay W. G. Rogers l

l p

_ 900531es-= 1 7l 9G06200311 g/

I L

C

OPERATING DATA lulPORT DOCKET NO. 50-341 COMPLETED BY P. M. Anthony DATE June 15, 1990,

TELEPHONE (313) 586-1617 OPERATING STATUS 1.

UNIT NAME:

Fermi 2 INotes:

l 2.

REPORTING PERIOD: May, 1990 l

l 3

LICENSED THERMAL POWER (MWL):

3293 I

I 4.

NAMEPLATE RATING (GROSS MWe):

1154 l

l S.

DESIGN ELECT RATING (Net MWe): 1067 l

l 6.

MAX DEPENDABLE CAP (GROSS MWe): 1154 l

l 7.

MAX DEPENDABLE CAP (Net MWe):

1047 l

l 8.

IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: Line 7 revised based upon ECAR testing.

9.

POWER LEVEL TO WHICH RESTRICTED, IF ANY (MWe Net):

None

10. REASONS FOR RESTRICTION, IF ANY:

None THIS MONTH YR TO DATE CUMULATIVE

11. HRS IN REPORTING PERIOD 744 3623 20,629
12. HRS REACTOR WAS CRITICAL 744 3513.1 14,610
13. REACTOR RESERVE SHUTDOWN HRS 0

0 0

14. HOURS GENERATOR ON-LINE 744 3493 7 13,790 5
15. UNIT RESERVE SHUTDOWN HOURS 0

0 0

16. GROSS THERMAL ENERGY GEN (MWH) 2,361,984 10.836,480 40,198,442
17. GROSS ELECT ENERGY GEN (MWH) 783,130 3,622,110 13.366,467
18. NET ELE'CT ENERGY GEN (MWH) 750,779 3,472,388 12,785,239
19. UNIT SERVICE FACTOR 100 96.4 66.9
20. UNIT AVAILABILITY FACTOR 100 96.4 66.9
21. UNIT CAP FACTOR (USING MDC NET) 96.4 91.5 59.2
22. UNIT CAP FACTOR (USING DER NET) 94.6 89.8 56.9
23. UNIT FORCED OUTAGE RATE O

3.6 14.5

24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, DURATION OF EACH)

None.

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-341 UNIT FERMI 2 DATE June 15, 1990 i

COMPLETED BY E. Dawson TELEPHONE (313) 586-5027 Month May, 1990 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (NWe-Net)

(NWe-Net) 1 785 17 1044 2

833 18 1054 1

3 726 19 961 4

809 20 1043 5

1031 21 1059 6

1061 22 1060 7

1049 23 1058 8

1040 24 1056 9

1041 25 1054 10 1048 26 988 11 1056 27 1050 12 1053 28 1047 13 1060 29 1000 14 1058 30 1059 15 1048 31 1050 16 1044

__.'hV5 o

'.. l-tMIT Steff90Mf5 mem PEMER RE34pCTIWW$

~ DOCMET NO.

50-341 DATE

~ June 15. 1990 UNIT NAME Formt 2 COMPLETED FV P.

W.

Anthony VELEPHONE (313)586-1617 REPORT WONTH tes y. 1990 l

I i

i I

i I

i f

l I-1 I

'l NETHOD OF l LER SYS

.l Comp l CAUSE & CORRECTIVE I

NO.

l-DATE

TYPE l DUR I REASON l' SHUTTING DOWN I NO.

CODE I CODE I ACTION TO PREVENT-I l

l l

(3)

.I-

. l (4) l (5) l PECURRENCE I

I (1) l (HRS){

(2s l THE REACTOR l

l I

i i

I i

i i

I

~,

t I

i l'

l NONE I

l -

l I

I I

=- - -----

I I

I I

I I

i I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I (1) F FORCED (2). REASON:

(3) mETHOO:

(4) ExHIGIT G - INSTRUCTIONS S: SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - WANUAL FOR PREDARATION OF DATA B - WAINTENANCE OR TEST 2 - smANUAL SC#am FMTRY SMEETS FOR LICENSEE C - REFUELING 3 - AUTOnATIC SCRAw EVENT REPORT (LER) FILE

'D - REGULATORY RESTRICTION 4 - CONTINUED (NUREG-0161)

E - OPERATOR TRAINING & LICENSE EXAMINATION 5 - REDUCED LOAD F - ADetINISTRATIVE 9 - OTHER G.- OPERATIONAL ERROR (EXPLAIN)

H - OTHER (EXPLAIN)

(5) EXHIBIT 1 - SAwE SOURCE 4.,

e.

' I i

m

.v..w.m.,._

.r2.m

.,.,,,,---.,....c-.

,,-.va.-~,.,..,.

-._v,

.,--._7,.

,.m

-,...-_t

_,._m J..w'

-