Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20064C383 + (02:05:29, 17 December 2024)
- ML20064C382 + (02:05:31, 17 December 2024)
- ML20064C378 + (02:05:31, 17 December 2024)
- ML20064C375 + (02:05:32, 17 December 2024)
- ML20064C366 + (02:05:33, 17 December 2024)
- ML20064C372 + (02:05:33, 17 December 2024)
- ML20064C365 + (02:05:34, 17 December 2024)
- ML20064C364 + (02:05:35, 17 December 2024)
- ST-HL-AE-0047, Forwards non-proprietary WCAP-13838 & Proprietary Rev 1 to WCAP-13803, Generic Assessment of Asymmetric Rod Cluster Control Assembly Withdrawal. Rev 1 to WCAP-1308 Withheld, Per 10CFR2.790(B)(4) + (02:05:36, 17 December 2024)
- ML20064C362 + (02:05:37, 17 December 2024)
- ML20064C350 + (02:05:38, 17 December 2024)
- 05000348/LER-1978-063-03, /03L-0:on 780913,feedwater Flow Instrument Associated W/Flow Transmitter FT-476 Failed Low.Caused by Failure of Loop Power Supply Card Due to Instrument Drift + (02:05:39, 17 December 2024)
- HL-4495, Application for Amends to Licenses DPR-57 & DPR-5 Revising Units 1 & 2 TS to Be Consistent w/NUREG-1433 Standard TS GE Plants,BWR/4 + (02:05:41, 17 December 2024)
- BECO-94-022, Forwards Semiannual Long Term Program Update in Accordance W/Section V.A of Plan for Long Term - Pilgrim Nuclear Power Station, Including Schedules for a & B Regulatory Items & Commitment Descriptions & Process Since Last Update + (02:05:42, 17 December 2024)
- 0CAN029407, 1993 Occupational Exposure Data Rept, Including Description of Special Maint Resulting in Notable Personnel Exposure & Whole Body Exposure Statistics + (02:05:43, 17 December 2024)
- 05000348/LER-1978-063, Forwards LER 78-063/03L-0 + (02:05:44, 17 December 2024)
- ML20064C339 + (02:05:44, 17 December 2024)
- ML20064C337 + (02:05:45, 17 December 2024)
- RC-94-0052, Semiannual Effluent & Waste Disposal Rept for Operating Period,930701-1231 + (02:05:46, 17 December 2024)
- 05000348/LER-1978-065-03, /03L-0:on 780912,steam Generator 1A Pressure Indicator on Hot Shutdown Panel Showed 0.Channel for Steam Generator 1A Declared Inoperable.Failure of Indicator Believed to Be Struck Meter Movement + (02:05:48, 17 December 2024)
- ML20064C332 + (02:05:49, 17 December 2024)
- 05000348/LER-1978-065, Forwards LER 78-065/03L-0 + (02:05:55, 17 December 2024)
- ML20064C329 + (02:05:55, 17 December 2024)
- RBG-40293, Annual Operating Rept for 1993. W/ + (02:05:56, 17 December 2024)
- ML20064C326 + (02:05:57, 17 December 2024)
- ML20064C318 + (02:05:58, 17 December 2024)
- 05000348/LER-1978-064, Forwards LER 78-064/03L-0 + (02:05:59, 17 December 2024)
- ML20064C316 + (02:05:59, 17 December 2024)
- 05000457/LER-1994-001-07, :on 940131,discovered Valves Not Included in Primary Containment Integrity Verification Surveillance Due to Preservice Deficiency.Valves Immediately Verified to Be Closed in Field + (02:06:01, 17 December 2024)
- ML20064C313 + (02:06:02, 17 December 2024)
- BECO-LTR-94-020, Number of Personnel & Man-Rem by Work & Job Function for 1993 + (02:06:03, 17 December 2024)
- ML20064C308 + (02:06:04, 17 December 2024)
- ML20064C310 + (02:06:04, 17 December 2024)
- ML20064C305 + (02:06:05, 17 December 2024)
- ML20064C306 + (02:06:05, 17 December 2024)
- ML20064C301 + (02:06:06, 17 December 2024)
- ML20064C300 + (02:06:07, 17 December 2024)
- ML20064C296 + (02:06:08, 17 December 2024)
- ML20064C298 + (02:06:08, 17 December 2024)
- 05000266/LER-1978-012-01, /01X-0:on 780627,during Visual Insp of Fire Barrier Penetration Seals,Horizontal Seals Found Constructed Differently than Specified.Caused by Change in Const Drawings + (02:06:10, 17 December 2024)
- 05000266/LER-1978-012, Forwards LER 78-012/01X-0 + (02:06:11, 17 December 2024)
- ML20064C283 + (02:06:12, 17 December 2024)
- ML20064C280 + (02:06:12, 17 December 2024)
- 05000266/LER-1978-014-01, /01T-0:on 780920,primary-to-secondary Leakage Noted During Normal Operation.Caused by Two Leaking Tubes & One Leaking Plug on Inlet Side of Steam Generator A.Tubes Will Be Plugged & Plug Will Be Weld Repaired + (02:06:14, 17 December 2024)
- ML20064C277 + (02:06:15, 17 December 2024)
- 05000266/LER-1978-014, Forwards LER 78-014/01T-0 + (02:06:16, 17 December 2024)
- ML20064C268 + (02:06:20, 17 December 2024)
- U-602257, Proposed TS 3/4.4.3.1, RCS Leakage-Leakage Detection Sys + (02:06:21, 17 December 2024)
- 05000265/LER-1994-002-04, :on 940127,control Rods M-8 & M-6 Mispositioned During Testing.Caused by Inappropriate Work Practices,Mgt/ Supervisory Methods & Verbal Communications.Rods M-8 & M-6 Returned to Position 00 + (02:06:23, 17 December 2024)
- 05000219/LER-1978-017-03, /03L-0:on 780914,circuit Breaker for motor- Operated Valve Tripped When Valve Closed by Isolation Signal.Caused by Component Failure Allowing Switch Setting to Shift.Setting Corrected & Set Screw Tightened + (02:06:25, 17 December 2024)
- JSP-079-94, Application for Amend to License NPF-62,revising TS 3/4.4.3.1, RCS Leakage-Leakage Detection Sys, in Response to Inoperability of Drywell Floor Drain Sump Flow Rate Monitoring Instrumentation + (02:06:26, 17 December 2024)
- 05000219/LER-1978-017, Forwards LER 78-017/03L-0 + (02:06:27, 17 December 2024)