t JOSEPH M. FARLEY NUCLEAR PLANT - UNIT 1 NARRATIVE

SUMMARY

OF OPERATIONS - SEPTEMBER 1978 During September the Unit was operated at 100% power up until September 15th, when it was taken off-line for a scheduled outage.

During the outage, p'rimarily scheduled for the Turbine Generator Availability Improvement Program, numerous modifications and testing were performed, and

~

repairs completed.

The following is a list of the significant modifications, testing, and repairs completed during September.

A majority of the items were worked during the outage:

1.

Performed 7300 Process Instrumentation and Control System wiring modifications for response time testing.

Completed Engineered Safety Feature Actuation System response time testing.

Calibrated all protection transmitters.

2.

Verified the setpoint of all Main Steam Line code safety valves.

3.

Reworked the pressurizer spray valves and pressurizer power operated relief valves.

4.

Replaced accumulator 1B vent / relief piping.

5.

Completed repairs on the 1C charging pump (replaced rotating element).

6.

Modified the component cooling water surge tank level transmitters.

7.

Replaced shorted diodes / blown fuses in diesel generator 1-2A control circuit (motor operated potentiometer) when automatic voltage / frequency control failed.

Modified air start systems on all diesel generators by adding air dryers and blowdown valves.

Repaired leaky relief valves / check valves on diesel generator air compressors.

8.

Modified motor driven auxiliary feedwater pump control circuitry to add a defeat of the auto start on loss of main feedwater in-order to be able to shutdown the pumps when the unit is shutdown.

9.

Added containment mini-purge modification to the containment purge system.

10.

Added additional fire proofing to cable spreading room.

7f/OIs 00F i

-m

-i 11.

Repaired boron injection system recirculation pump; restored flow in line between surge tank and l

recirculation pumps after boron in line had solidified.

a t

l i

4,

~

j l

f 4

4 4

9 6

A 4

I 4

7 4

-g---

,c-

- -+

w,,-

..nm,,

,.nn-.,

.,,,,-.-,,;,-w,.,

e s y

n.


m

,,w_.-

m - -

1, g//}

1

\\ i

~

U T

4 OPERATING DATA REPORT

{.i 4

50-348 DOCKET NO.

3 j'

[/(

DATE 10-1-16 COMPLETED BY W.

G. Hairston, III

'g TELEPHONE wa>6vy-3156 s

,/

f OPERATING STATUS

'[

, y

'h I Joseph M. Farley Unit 1 -

y

.h Notes 1/Since 12-1-77 date

1. Unit Name:

t4 '-

of commercial operation i

q ^(

2. Reporting Period: September 1978 2652
  • I'.
3. Licensed Thennal Power (MWt):

860

4. Nameplate Rating (Gross MWe):

829

, j S. Design Electrical Rating (Net MWe):

860*

6. Maximum Dependable Capacity (Gross MWe):

829*

7. Maximt:m Defendable Capacity (Net MWe):

4

8. If Changes Occur in Capacity Ratings (Irems Number 3 Through 7) Since Last Report. Give Reasons:

N/A N

N/A

9. Power Level To Which Restricted.lf Any (Net MWe):

N/A s

10. ReasonsFor Restrictions.lf Any:

?

5 s

(,

This Month Yr to-Data Cumulathe.

i

)I 720 6551 7295

' +

11. Hours in Reporting Period 4 12. Numba Of flours Reactor Was Critical 356.3 5671.6 6214.9 i
13. Reactst Reserve Shutdown Hours 363.7 717.3 827.4
14. Hours Gener.ior On-dne 356.3 5571.0 6082.8 3

i

15. Unit Reserve ShutdownNours 0

0 0

It'. C.ms Thermal Enstgy di.terried (MWH) 941,142 14,333,323 15,637,326

~

3 li'sGross Electrical Energ) Generated (MWH) 298,134 4,585,070 5,006,456

+

s1.8 Net Electrical Energy Generated (MWH) 279,712 4.338,748 4,734,678 l'*. Unit Smice Factor 49.5%

85.0%

83.4%

s p

20. Unit Availabliity Factor 49.5%

85.0%

83.4%

21. Unit Carcirr Intor (Using MDC Net) 46.9%

79.9%

78.3%

i

22. LEit Cspac4y F2Sor'(Using DER Net) 46.9%

79.9%

78.3%

i 6

23. Unithdied 'A.cce Rate 0%

7.6%

9.2%

24. Shutdownq5pheded Ger Next 6 Months (Type.Date.and Duration of Each):

'. RefuelinC, f M?cch 1979, 8 weeks s

s 2. If Shut Down At End Of Report Period, Estimated Date of Startup:

October 4, 1978

26. Units In Test Status (Prior to Commercial Operation):

Forecast Achiesed 8-6-77 8-9-77 INITIA L CRITICALITY

('

.INITIA L ELECTRICITY 8-20-77 8-18-77

'COMM ERCIA L OPERATION 12-1-77 12-1-77

  • The Na'ne Plate Rating / Design Electrical Rating will be used for the Maximum

' Dependable t%pacity until an accurate value can be determined from operating

~

.experieiceJ (o/77)

-y

(

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-348 Farley Unit 1 3.lT 10-1-78 DATE W. G. Hairston, III COMPLETED BY (205) 899-5156 TELEPHONE g

MONTH September DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net)

(MWe-Net) 794 0

,7 796 2

18 0

3 788 39 g

4 798 20 0

796 5

21 0

799 0

22 6

801 0

7 23 803 0

g 24 0

9 801 25 785 0

10 26 796 0

1I 27 795 0

12

g 796 0

13

,9 800 0

14 30 648 15 3,

0 16 l

INSTRUCTIONS On this format, list the average daily uriit power lesel in MWe-Net for each day in the reporting month. Compute to the nearest whole rnegawatt.

(9/77 )

n

/

" }

[}

.A O

,]

s j

50-348 DOCKET NO.

t UNIT SIIUTDOWNS AND POWER REDUCTIONS

/

UNIT NAME Farley linit 1 10-1-/3 DATE W. G. llairston, III COMPLETED BY REPORT MONTil September TELEPilONE (205) 899-5156

)

i 9*.

E c

i

-.! ?

}

hY5 Licensee

,E%

w

$"3 Cause & Corrective i

l No.

Date g

5g 2s5 Event Q?

g Action to g'

H f:

5 gig Report #

in U Prevent Receirrence

[

b 41 780915 S

363.7 B

3 NA ZZ ZZZZZZ Reactor trip occurred due to low S/G E

water level which resulted when IA SCFP recirc miniflow valve opened s

while a controlled shutdown was in progress. The SGFP llP governor valve Q

was isolated due to a steam leak and Q

the LP governor valves were control-ling SCFP speed. The HP governor valve j

which normally controls SGFP speed.,

g

]

at low power levels, was not put on J

line due to oversight. The unit was D

being shut down for a turbine AIP ou tage.

O t

I i

1 2

3 4

I 8

F: Forced Reason:

Method:

Exhibit G. Instructiims S: Scheduled A Equipment Failure (Explain) 1 Manual for Preparation or Data r

D Maintenance of Test 2-Manual Scram.

Entry Sheets or Licensee C Refueling 3 Automatic Scram.

Event Report (LERI File (NUREG.

D Regulatory Restriction 4-Other (Explain) 01611 E-Operator Training & License Examination F Administrative 5

{

G-Operational Error (Explain)

Exhibit I Same Source

('l/77)

II Other (Exp:ain)

Q i