Submits Suppl Info to Rev 4 of Common Nuclear Emergency Plan for Pbaps,Units 2 & 3 & Lgs,Units 1 & 2,submitted by .Exhibits 3-1 Through 3-7,4-1,5-1 & 5-2 Inadvertently Omitted from 940120 Submittal Encl
ML20064C277
Person / Time
Site: Peach Bottom, Limerick  Constellation icon.png
Issue date: 02/24/1994
From: Hunger G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20064C281 List:
References
NUDOCS 9403090236
Download: ML20064C277 (2)


Text

Station Support Department 10CFR50, Appendix E

-7 PECO ENERGY

== F;g=Ls 905 Chesterbrook Boulevard Wayne, PA 19087-5691 l

February 24,1994 Docket Nos. 50-277 50-278 i

50-352 l

50-353 License Nos. DPR-44 DPR-56 NPF-39 l

NPF-85 l

U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Subject:

Peach Bottom Atomic Power Station, Units 2 and 3 i

Limerick Generating Station, Units 1 and 2 Corrections to Common Emergency Plan Revision Gentlemen:

This letter submits supplementalinformation to Revision No. 4 of the common Nuclear Emergency Plan for Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3, and Limerick Generating Station (LGS), Units 1 and 2. Revision No. 4 of the common Nuclear Emergency Plan was submitted by letter dated January 20,1994, within 30 days of the changes in accordance with the requirements of 10CFR50.54(q) and 10CFR50, Appendix E, and in accordance with 10CFR50.4(b)(5). However, the Revision No. 4 package submitted by letter dated January 20,1994, did not include Exhibits 3-1 through 3-7,4-1,51, and 5-2. These exhibits were inadvertently omitted from the Revision No. 4 package and therefore, are attached.

As previously indicated in the January 20,1994 letter, the changes associated with Revision No. 4 to the common Nuclear Emergency Plan (which included the exhibits) were administrative and were evaluated and determined not to decrease the effectiveness of the PBAPS and LGS common Nuclear Emergency Plan. In addition, the changes had been reviewed by the Plant Operations and Review Committees (PORCs) at PBAPS and LGS.

.h (MPnsieE8SNF F

i

Page 2

\\

If you have any questions or require additional information, please do not hesitate to contact us.

Very truly yours,

. d.

'/

G. A. Hunger, Director Licensing Section Attachments cc:

T. T. Martin, Administrator, Region I, USNRC (w/ attachments,2 copies)

N. S. Perry, USNRC Senior Resident inspector, LGS (w/ attachments)

W. L. Schmidt, USNRC Senior Resident inspector, PBAPS (w/ attachments) l 1