ML20064C298

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Sept 1978
ML20064C298
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 10/12/1978
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA)
Shared Package
ML20064C303 List:
References
NUDOCS 7810180079
Download: ML20064C298 (1)


Text

-_

4 A!abama Power Company 600 Ppr e 18:n St'eet

, Post 4f :e Ben 2641 B rm.ng*am A:atama 35291 Te'epewre 205 323 5341 F. L CLAYTON. JfL Senior Sce Prescent g3hgg3 g,g the southem e,ectre system October 12, 1978 Director, Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C.

20555 RE: Joseph M. Farley Nuclear Plant Unit No. 1 Docket No. 50-348 Monthly Operating Data Report i

Dear Sir:

Attached are two (2) copies of the September, 1978 monthly operating report for Joseph !!. Farley Nuclear Plant, Unit 1, as required by Section 6.9.1.6 of the Appendix A Technical Specifications. As requested by letter from Mr. John F. Stolz to Mr. Alan R. Barton, dated October 21, 1977, a j

" Narrative Summary of Operating Experience" is included in the attached j

report.

i If you have questions, please advise.

Yours very truly, k'

F. T Clayton, r.

/

FLCJr/TNE:bhj Attachments cc: Director, IE (10 copies)

Director, RII (1 copy) 50-#8 1

giorgoo77 C

.