Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20064L469 + (01:23:33, 17 December 2024)
- ML20064L468 + (01:23:34, 17 December 2024)
- 05000361/LER-1982-171, Forwards LER 82-171/03L-0.Detailed Event Analysis Submitted + (01:23:35, 17 December 2024)
- ML20064L453 + (01:23:35, 17 December 2024)
- ML20064L448 + (01:23:36, 17 December 2024)
- ML20064L446 + (01:23:37, 17 December 2024)
- ST-HL-AE-4732, Application for Amends to Licenses NPF-76 & NPF-80, Incorporating TS 3.1.2.3,by Modifying Note Which Will Permit Energizing of Inoperable Centrifugal Charging Pump in Preparation for Switching of Centrifugal Charging Pumps + (01:23:38, 17 December 2024)
- 05000247/LER-1982-050, Forwards LER 82-050/03L-0 + (01:23:39, 17 December 2024)
- ML20064L436 + (01:23:39, 17 December 2024)
- ML20064L435 + (01:23:40, 17 December 2024)
- ML20064L431 + (01:23:40, 17 December 2024)
- ML20064L429 + (01:23:41, 17 December 2024)
- ML20064L423 + (01:23:42, 17 December 2024)
- ML20064L413 + (01:23:46, 17 December 2024)
- ML20064L412 + (01:23:49, 17 December 2024)
- ML20064L411 + (01:23:50, 17 December 2024)
- 05000361/LER-1983-006, Forwards LER 83-006/03L-0.Detailed Event Analysis Submitted + (01:23:51, 17 December 2024)
- ML20064L390 + (01:23:52, 17 December 2024)
- 1CAN028301, Advises That 100% Insp of Core Fuel Assembly Holddown Springs Performed on 821231,per 810213 Commitment.No Failures Occurred During Cycle 5 Operation + (01:23:53, 17 December 2024)
- SNRC-2159, Personnel Monitoring Rept for Shoreham Nuclear Station Unit 1 for 1993 + (01:23:53, 17 December 2024)
- ML20064L361 + (01:23:54, 17 December 2024)
- ML20064L373 + (01:23:54, 17 December 2024)
- 05000362/LER-1982-010-03, /03L-0:on 821115,during Surveillance Testing,Fire Detection Instrumentation Found Inoperable.Testing Revealed Need to Replace/Repair Parts of Sys.Replacements/Repairs Expected to Be Complete in 90 Days + (01:23:56, 17 December 2024)
- 05000333/LER-1993-027, Reissues LER-93-027 Re Fire Protection Sys Functional Test Procedure Weaknesses Due to Incorrect Date on Block 7 of Form NRC 366.Rept Text Remains as Issued on 940120 + (01:23:57, 17 December 2024)
- ML20064L353 + (01:23:57, 17 December 2024)
- ML20064L340 + (01:24:02, 17 December 2024)
- ML20064L335 + (01:24:03, 17 December 2024)
- ML20064L337 + (01:24:03, 17 December 2024)
- 05000362/LER-1982-010, Forwards LER 82-010/03L-0.Detailed Event Analysis Submitted + (01:24:04, 17 December 2024)
- ML20064L328 + (01:24:05, 17 December 2024)
- 05000321/LER-1983-001-03, /03L-0:on 830102,during Surveillance Procedure, Two Control Room Ventilation Bypass Isolation Valves Would Not Close within Required 7 S.Caused by Instrument Drift. Rate Set Valves Adjusted + (01:24:10, 17 December 2024)
- ML20064L312 + (01:24:11, 17 December 2024)
- 05000321/LER-1983-001, Forwards LER 83-001/03L-0 + (01:24:13, 17 December 2024)
- ML20064L304 + (01:24:13, 17 December 2024)
- ML20064L293 + (01:24:17, 17 December 2024)
- ML20064L291 + (01:24:18, 17 December 2024)
- ML20064L290 + (01:24:19, 17 December 2024)
- ML20064L282 + (01:24:20, 17 December 2024)
- ML20064L281 + (01:24:21, 17 December 2024)
- ML20064L277 + (01:24:21, 17 December 2024)
- ML20064L275 + (01:24:22, 17 December 2024)
- ML20064L273 + (01:24:22, 17 December 2024)
- ML20064L267 + (01:24:24, 17 December 2024)
- ML20064L271 + (01:24:24, 17 December 2024)
- ML20064L266 + (01:24:25, 17 December 2024)
- ML20064L264 + (01:24:26, 17 December 2024)
- ML20064L265 + (01:24:26, 17 December 2024)
- ML20064L256 + (01:24:27, 17 December 2024)
- ML20064L248 + (01:24:28, 17 December 2024)
- ML20064L250 + (01:24:28, 17 December 2024)
- ML20064L247 + (01:24:29, 17 December 2024)