Deficiency Rept DER 82-56 Re Condensate Storage Tank Design scaled-down W/O New Calculations for Seismic Response. Initially Reported on 821015.Time Extension Required Due to Extensive Investigation.Next Rept Expected by 830323
ML20064L275
Person / Time
Site: Palo Verde  
Issue date: 01/27/1983
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Sternberg D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, DER-82-56, NUDOCS 8302150186
Download: ML20064L275 (2)


Text

Docket Nos. 50-528g29/530 I

50.55(e) Rdpprt

4,p P O BOX 2166G e PHOENIX, ARIZONA 85036 r74 January 27, 1983

.j,,

ANPP-22845-GHD/BSK U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368 Attention:

Mr. D. M. Sternberg, Chief Reactor Projects Branch 1

Subject:

Time Extension for Report - DER 82-56 A 50.55(e) Potentially Reportable Deficiency Relating to Condensate Storage Tank Design Was Scaled-Down Without New Calculations for Seismic Response File:

83-019-026 D.4.33.2

Reference:

(A) Telephone Conversation between J. Eckhardt and G. Duckworth on October 15, 1982 (B) ANPP-22179, dated November 1, 1982 (Interim Report)

(C) ANPP-22696, dated January 11,1983 (Time Extension)

Dear Sir:

The NRC was notified of a Potentially Reportable Deficiency in Reference (A), an Interim Report was transmitted by Reference (B),and a Time Exten-sion was requested by Reference (C). At that time, it was estimated that a Final Report would be available by February 11, 1983.

Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by March 23, 1983, when a complete report will be submitted.

There is no new information or change to the Interim Report at this time.

Very truly your

\\

CL R

%LL E. E. Van Brunt, Jr.

APS Vice President Nuclear Projects ANPP Project Director EEVBJr/GHD:skc cc: See Attached Page 2 (t}_<

83021'S'0186 830127 PDR ADOCK 05000528 S

PDR

I i

s*

j U. S. Nuclear Regulatory Commission I

Attention:

Mr. D. M. Sternberg, Chief ANPP-22845-CHD/BSK January 27, 1983 Page 2 cc: Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission i

Washington, D. C.

20555 T. G. Woods, Jr.

I J. A. Roedel D. B. Fasnacht G. C. Andognini J. R. Bynum B. S. Kaplan W. E. Ide A. C. Rogers j

J. Vorees J. A. Brand A. C. Gehr i

W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher R. M. Grant D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiorelli P. P. Klute Lynne Bernabei, Esq.

Harmon & Weiss 1725 "1" Street, NW l

Washington, D. C.

20006 i

R. L. Greenfield Assistant Attorney General j

Bataan Memorial Building Santa Fe, New Mexico 87503 2

6

?

4 i

c

,,--.,.,.,,-n-,-.

c,,, - -.. - -,...

,-,---,c,-

-n

, - -. -,