Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20072M710 + (09:50:38, 15 December 2024)
- ML20072M703 + (09:50:41, 15 December 2024)
- ML20072M706 + (09:50:41, 15 December 2024)
- ML20072M698 + (09:50:42, 15 December 2024)
- ML20072M696 + (09:50:42, 15 December 2024)
- ML20072M695 + (09:50:43, 15 December 2024)
- ML20072M694 + (09:50:44, 15 December 2024)
- 05000324/LER-1983-058-03, /03L-0:on 830606,HPCI Sys Steamline Area Differential Temp High Logic a Isolation Signal Occurred, Causing Automatic Closure of HPCI Sys Steam Supply Outboard Valve PCIV 2-E41-F003 + (09:50:45, 15 December 2024)
- ML20072M690 + (09:50:46, 15 December 2024)
- 05000293/LER-1983-034-03, /03L-0:on 830606,nitrogen Purge Isolation Valve AO 5033B Failed to Meet Tech Spec Required Closing Time. Caused by Use of 3/8-inch Solenoid Air Supply Valve SV 5033B.Valve Replaced w/1/2-inch Solenoid Valve + (09:50:48, 15 December 2024)
- 05000286/LER-1983-004-03, /03L-0:on 830604,leak Observed at elbow-to-pipe Weld on Charging Pump 31 Relief Line 210 Downstream of Relief Valve RV231.Cause Not Stated.Valve 231 Replaced & Pump Returned to Svc + (09:50:50, 15 December 2024)
- RC-94-0226, Forwards Amend 94-01 to Updated Fire Protection Evaluation Rept + (09:50:51, 15 December 2024)
- ML20072M668 + (09:50:52, 15 December 2024)
- ML20072M676 + (09:50:52, 15 December 2024)
- ML20072M657 + (09:50:53, 15 December 2024)
- ML20072M655 + (09:50:54, 15 December 2024)
- 05000416/LER-1983-067-01, /01T-0:on 830311,Div 1 ECCS Discovered Inoperable When Switching from Refueling to Cold Shutdown.Caused by Nonfunctional Annunciators Due to Blown Fuse in Control Room Panel.Annunciators Repaired + (09:50:55, 15 December 2024)
- ML20072M638 + (09:50:56, 15 December 2024)
- ML20072M637 + (09:50:57, 15 December 2024)
- ML20072M632 + (09:50:58, 15 December 2024)
- ML20072M625 + (09:51:00, 15 December 2024)
- ML20072M621 + (09:51:01, 15 December 2024)
- RA-20-0012, License Amendment Request to Revise Technical Specifications Related to Accident Monitoring Instrumentation, Refueling Operations Instrumentation, and Electrical Equipment Protective Devices + (09:51:02, 15 December 2024)
- 05000416/LER-1983-067, Forwards LER 83-067/01T-0 + (09:51:03, 15 December 2024)
- ML20072M612 + (09:51:03, 15 December 2024)
- ML20072M606 + (09:51:04, 15 December 2024)
- ML20072M592 + (09:51:05, 15 December 2024)
- ML20072M591 + (09:51:05, 15 December 2024)
- ML20072M588 + (09:51:06, 15 December 2024)
- ML20072M579 + (09:51:07, 15 December 2024)
- ML20072M586 + (09:51:07, 15 December 2024)
- 1CAN038307, Advises That Plans & Schedule for Resolution of TMI Action Item II.K.3.5 Re Reactor Coolant Pump Trip Will Be Submitted by 830701,in Response to Generic Ltr 82-10f.Uniform Pump Trip Criteria Desirable + (09:51:08, 15 December 2024)
- ML20072M560 + (09:51:09, 15 December 2024)
- ML20072M561 + (09:51:09, 15 December 2024)
- ML20072M555 + (09:51:11, 15 December 2024)
- ML20072M557 + (09:51:11, 15 December 2024)
- 05000305/LER-1983-006-03, /03L-0:on 830221,ICS Sys Train B Inadvertently Activated When Technician Depressed Test Lightbulb in Preparation for Performing Safeguards Logic Test.Action Resulted in Decreased Tank Level.Procedure Revised + (09:51:13, 15 December 2024)
- 05000364/LER-1983-015-03, /03L-0:on 830223,during FNP-2-STP-80.1 Operability Test,Diesel Generator 2B Declared Inoperable When Max Load Achievable Below Tech Spec Limit.Cause Unknown.Fuel Injector Linkage Adjusted.Load Demand Will Be Monitored + (09:51:15, 15 December 2024)
- ML20072M540 + (09:51:15, 15 December 2024)
- 05000305/LER-1983-006, Forwards LER 83-006/03L-0 + (09:51:16, 15 December 2024)
- ML20072M523 + (09:51:17, 15 December 2024)
- ML20072M508 + (09:51:22, 15 December 2024)
- ML20072M507 + (09:51:22, 15 December 2024)
- 05000416/LER-1983-059-03, /03L-0:on 830215,low Sys Flow Observed for Standby Gas Treatment Sys B Subsystem During Performance of 10 H Surveillance Run.Caused by Broken Shaft Arm on Actuator Assembly.Shaft Arm Replaced.Surveillance Run Completed + (09:51:24, 15 December 2024)
- 05000302/LER-1983-009, Forwards LER 83-009/03L-0 + (09:51:25, 15 December 2024)
- 05000335/LER-1983-010-03, /03L-0:on 830217,reactor Protection Sys Logic Matrix Relay AB-1 Found Failed During Periodic Testing. Caused by Open CP Clair Model HGZX-1011 Mercury Wetted Relay.Relay Replaced in Kind + (09:51:26, 15 December 2024)
- ML20072M486 + (09:51:28, 15 December 2024)
- ML20072M485 + (09:51:28, 15 December 2024)
- 05000416/LER-1983-059, Forwards LER 83-059/03L-0 + (09:51:29, 15 December 2024)
- ML20072M482 + (09:51:29, 15 December 2024)
- 05000335/LER-1983-010, Forwards LER 83-010/03L-0 + (09:51:30, 15 December 2024)
- ML20072M476 + (09:51:30, 15 December 2024)