r
, . . .a T.: :.C :, :, .c.v. -- a.
4p
- POWER AUTHORITY OF THE STATE OF NEW YORK h INDIAN POINT NO. 3 NUCLEAR PCWER PLANT
- 85. O. SOX 215 SUCH AN AN. N. Y. tc511 Tei.cr ous. 914 739 82 l December 16, 1982 l :P-InL-4728 l
3 I
i
! Mr. I. Cohen
} Region I, U.S.N.R.C.
> 631 Park Avenue King of Prussia, PA 19406
Dear Mr. Cohen:
a As a follow-up to our ,recent exit interview I am summarizing the remaining.open items to the IP-3 Emergency Preparedness Appraisal. As we
, discussed some of these are appropriate to close by mail. The attached i pages are recent revisions of our procedures, towards addressing the comments of the Appraisal. .
ee It is believed, the intent of items A-2 and B-27 are adequately addressed in the attached pages. -
e A verbal discussion of item A-5 was held with Mr. H.W. Crocker en December 13, 1982. It was decided we would rcvise all the PEP's to address the deficiencies noted in A-5 by December 20, 1982.
e Correspondence to closecut item A-10 vill be forward by Public Relations in th'e near future.
Of the remaining open items, completion dates have been established as follows:
e A-3 January 1984 for complete installation. Material has been purchased and the engineering package is in the final review process.
e B-8 Conpletion is ' scheduled for 3 months after our mid-cycle inspection. With this in mind the completion of B-8 is j expected by May 1984 If'there are any questions or concerns please do not hesitate to call, Linda M. Lemonaco, (914) 739-8200 Ext. 246.
j Sin erely,
,B:k ff05' Linda M. Lomonaco Asst. to the Rad. & Env.
Services Supt.
LML/dp/lml-06 Attachments l 8304010345 830324 PDR ADOCK 05000286 O PDR
i g .
TABIE 4-1 I
XIX. RECOVERY PilASE y -
/
Criteria for entering the long term Recovery Phase are as follows: .
- 1. Radioactive releases,to the environment caused by accident conditions have been terminated. ;
5
- 2. Plant is in Cold Shutdown.
i
- 3. Plant is in a Stable Condition. ,
Prior to entering the recovery mode onsite and offsite officials shall be notified and confered with and appropriate lines of communication established for recovery operations. [
N 4 O !
I l-ta e W
- I a
if h
i I
v i
- ?.
(
i t
1 l
. . . . .. a . , . , . . - .- .
s .
=w~
- 1. Assign Personnel for Emergency Organi=ation, f ED l
'FATL i
Communicators in EOF
- 2. Assure EOF Habitability.
- 3. Contact CR for Plant Status Information.
- 4. Take over ED Responsibility from Shift Supervisor.
- 5. Accountability / Evacuation? ,
- 6. Review & Approve Search & Rescue operations (IP-lO54) .
- 7. Notify: INFO ANI Brookhaven National Lab Adjacent Businesses
- 8. Review & Recommend Corrective Actions.
- 9. Exceeding NRC Radiation Exposure limits (IP-1027) .
p
- 10. Planned discharge of Containment atmosphere (IP-1005) .
- 11. Periodic briefings to EOF staff & upper gallery.
- 12. _ riodically review the Habitability of the EOF:)if a move to the AEOF is required notify the POM and turn over ED responsibility to him and assure he
- delegates communicator and RATL positions to members of his staff.
f 13. Periodic updates to offsite authorities using EP Form #8 Radiological Emergency l Data Form Parts I, II, III. 6
- 14. Review EAL's for change in Emergency Classification.
15.
3p l Escalate or de-escalate Emergency Classification.
l 16. Consider entering the Recovery Phase refer to the last page of the EAL Table for Iy guidance. 4 m
! 17. Insure that OSC, TSC, CR, IAO, and security are aware of any changes in r Emergency Status.
l
- 18. Close cut to authorities.
L
- ..u.-e.e.e _ >
..n _ _, - . . . ~ .
, . IP 1030 EMERGENCY NOTIFICAIION, COMMLINICATION AND STAFFING 1.0 INTENT To describe the process for the notification and associated co==unications
. required when any of the four Emergency classes is declared, as well as the methods which will mobili:e the IP-3 Emergency Response Organization.
2.0 DISCUSSION j After the declaration of on Emergency (Notification of Unusual Event, Alert, Site Area or General), the Shift Supervisor (Emergency Director) will initiate and insure this procedure is implemented until he is relieved from the responsibility of Emergency Director.
( Persons who =ust (may) be not,1fied of an Emergency Condition include:
PASNY ,
NRC OFFSITE**
- Resident Manager
- Resident Inspector
- Con Edison
- Superintendent of Power
- Headquarters *Westchester County
- Information Officer .
- City of Peekskill
- N.Y.O. Duty Officer *Rockland County Emergency Response Personnel *0 range County
- Putnam County
- N.Y. State Dept. of Health U.S. Coast Guard Con Rail Corporation
- ANI l1
- Persons or agencies who must always be notified (NUE, Alert, Site Area, General)
Those not
- are notified under the appropriate circumstances as per procedure.
- 0ffsite Agencies should be notified within 15 minutes of the declaration of an emergency classification. PASNY and NRC notifications should be made simultaneously.or directly following offsite notifications.
- ANI must be notified at the Alert classification and above.
[
PASNY' maintains staffing consistent with the NRC requirements fcr onshift; minimum (30-60 minutes); and additional support staffing during emergency conditions.
Personnel required on shif t are supplied by members of the Watch Organization with additional personnel available through the Con Edison Sr. Watch Supervisor.
Emergency Personnel off-hours minimum staffing (30 to 60 minutes) shall be accomplished as follows:
Alert Site Area General Personnel as Personnel on Personnel on Emergency Director Roster III Roster III determines necessary.
Immediate and minimum staffing should be directed by the Shif t Supervisor.
Off-hours call in of Emergency Personnel will be done by Security.
1 of 19
- . . .:. .;c.m -.n. - _... . . .
[- 30 PROCI: DURE - NORMAL k'ORK HOURS
% 3.1 Notification cf Unusual Event /Non-Radiological Alert (Use EP-Form #10) 3.1.1 Shift Supervisor a) Designates a communicator
- b) Determines which support centers should be activated 3.1.2 Communicator a) Fill out Part I of the Radiological' Emergency Data-Form, (EP-Form #8).
b 1
~
b) Call the Resident Manager's Secretary and request her to notify the Resident Manager, Superintendent of Powdr, Information d Officer and the FYO Duty Officer using Part I of the
f c) Call the' Con Edison Unit 2 Control Room and alert them of IP-3
' conditions.
3 d) Notify offsite agencies within 15 minutes of a declaration of an emergency using the Hot Line Telephone and Part I.of
~
the Radiological Emergency Data Form (EP-Form #8).
i e) Notify NRC Headquarters using the direct line telephone.
f) Notify the USNRC Resident Inspector.
I g) Notify ANI at the Alert classification and above.
E 5 h) Using the Radiological Emergency Data Form, keep i offsite authorities (b,c,d,e,f & g) informed of j significant changes (approximately every 30 minutes) -
until the EOF has taken responsibility for offsite
- communications.
i '
j i) Notify authorities (b,c,d,e,f & g) of a reduction or escalation in the' Emergency Classification or Recovery i Intention.
~
3 j) Closecut to authorities (b,c,d,e,f & g).
~.
3.1.3 Personnel or Support Center Activation i 3.1.3.1 If Technical Assistance alone is required, use PA to j . announce:
- a) "All Technical Support Center personnel report to l to the Technical Support Center" b) " Shift Technical Advisor Report to the Control Room"
~7
=
I_
5 2 of 19 t_
r'
. . . . - . ._ c : n__ na ia - a m.<_.. - _ _ -. _ . .. . .. .m.__ . , ....,r - - -
. or 3.1.3.2 If operational and Technical Assistance is required, use the PA to announce:
a) "All Technical Support Center personnel report to the Technical Support Center" b) " Shift Technical Advisor report to the Control Room" c) " Operations Support Center Personnel Report to the Operations Support Center" or 3.1.3.3 If all Support Centers are to be activated, use the PA to announce:
a) 'IEmergency Directors and Radiological Assessment Team report to the Emergency Operation Facility" b) "All Technical Support Center personnel report to the Technical Support Center" c) " Shift Technical Advisor report to the Control Room" d) " Operations Support Center Personnel Report to the Operations Support Center" e) "All other personnel carry on with your normal duties" M
E l-l l=
f.
c.
Y i=
l=
i:
= .
ik
!=
!~
E E
I.
=
1?
'I l
T l 3 of 19 L- - ._ _ - - _- _ _ _ _ _ _ _ _ -
r-
- . . .-._._ _2 m m - - . . _ . . . 2 _ . . . . c _ . - _ . . . .
.m - . _1,,19 3 y , f .
3.0 PR.0CEDURE - NORMAL WORK HOURS (CONT'D) 3.2 Radiological Alert / Site Area / General (use EP-Form #11) ,
3.2.1 Shift Supervisor a) Designates a co=municator b) Initiates sounding site evacuation alarm and activation of support centers.
c) Initiates calculations for dose projection
. 3.2.2 Communicator a) Fill out the Radiological Emergency Data Form, l EP-Form #8 b) Call IP-3 Security:
- 1. Alert them of emergency status ii. Dire'et them to restrict access to the site c) Call the Resident Manager's Secretary and request her to notify the Resident Manager, Superintendent of Power, Information Officer and NYO Duty Officer using the Radiological Emergency Data Form (EP-Form #8) and Roster I (EP-Form #9). l d) Call Con Edison Unit 2 Control Room:
- 1. Alert them to IP-3 conditions
- 11. Request offsite monitoring teams to report to the Emergency Operation Facility.
e) Notify offsite agencies within 15 minutes of declaration of the emergency using the Hot Line Telephone and the Radiologiccl Emergency Data Form, (EP-Form #8). l L
f) Notify NRC Head' quarters using direct line telephone.
- g) Notify the USNRC Resident Inspector.
h) Notify ANI l
1 I l
- 1) Notify the U.S. Coast Guard if emergency is Radiological in nature and will impact Hudson River
- traffic.
L j) Notify Con Rail if emergency is Radiological in nature I and will impact railroad traffic.
l k) Using the Radiological E=ergency Data Form, keep l authorities (c.d.e,f,g,h,1 & j) informed of significant l l changes (approximately every 30 minutes) - until the EOF l is staffed and has taken over responsibility for
! offsite co==unications.
i l
i 4 of 19 l
t
a.-w...-.~.~......-.-
u.,,,, , o , 9 .. -
. 1) Kasp Euthoritiss (c.d.e.f g,h i & j) informtd of a l l*
reduction or escalation in the Emergency
. Classification or Recovery Intention.
i m) Closeout to authorities (c,d,e,f,g h,1 & j). l 3.2.3 Evacuation Alarm and Support Center Activation 3.2.3.1 Sounding Site Evacuation Alarm results in:
. Emergency Director & Assessment Team reporting to the Emergency Operation Facility
. Technical Support Center personnel reporting to the Technical Support Center
. Operations Support Center personnel reporting to the Operations Support Center.
- '. Shift Technical Advisor reporting to the Control Room
. Watch H.P. and Chemist reporting to the Control Room unless otherwise notified 3.2.3.2 Announce over PA:
a) "A emergency has been declared. All non-watch personnel report to your Assembly Area". (repeat) 3.2.4 Dose Projection Calculations:
a) Refer to IP-1002
?
i I
i t
t i
f h
I l
i
! 5 of 19 i
~. . . . . . - na...-.--... . -- - .. - : .: .. _ ..- - - - . . . - ., . . . . . _;; ;,, . ., ,, , a
. 4,0 PROCEDURE - NON NORMAL WORK HOURS
\
4.1 Notification of Unusual Event /Non-Radiological Alert (EP-Form #10) 4.1.1 Shift Supervisor a) Designates a communicator b) Determines which support centers should be activated, and initiates the call-in of Emergency Response Personnel as necessary.
4.1.2 Communicator a) Fill out the Radiological Emergency Data Form, EP-Form #8.
b) Call security and request them to notify the Resident Manager, Superintendent of Power, Information Officer and the NYO Duty Officer using Part I of the Radiological t
Emergency Data Form (EP-Form #8) and Roster I (EP-Form #9) c) Call Con Edison Unit 2 Control Room:
- 1. Alert the'm to IP-3 conditions
- 11. Request 1 R0 immediately and if needed HP, Chem, I&C or Maintenance Techs to report to the IP-3 Control Room.
d) Notify offsite agencies within 15 minutes of declaration of the emergency using the Hot Line Telephore and Part I of the Radiological Emergency Data Form (E Form #8) .
e) Notify NRC Headquarters using the direct line telephone f) Notify the USNRC Resident Inspector
~
- g) Notify ANI at the Alert Classification and above.
[ h) Using the Radiological Emergency Data Form,' keep authorities
- (b.c,d,e,&f) informed of significant changes (approximately E every 30 minutes) - until the EOF is staffed and has taken
[. over responsibility for offsite communications.
<=
5 i) Notify. authorities '(b,c,d,e,f & g) of-a reduction or 3 escalation in the Emergency Classification or Recovery
? Intention.
b j) Closeout to authorities (b,c,d e.f & g).
}
i; 3 4.1.3 Support Center Activation & Staffing (initiated by the Shift
@ Supervisor) 5 g 4.1.3.1 Use the PA: ,
F a) " Shift Technical Advisor report to the Control Room" G
i:
t 4.1.3.2 If Technical Assistance alone is requested:
7 J a) Instruct Security (Command Post) to call-in i Technical Support Center Personnel; Appendix A.
J Roster II.
5 or i
E 6 of 19
a . . u a, . ..+.u... - .-.,.:. . ,. ......u. ;_.. . u.;
IP-1030/7 4.1.3.3 ff Operational and Technical Assistance is required:
a,) Determine which support areas.are needed, b) Instruct Security (Conmand Post) to call-in as needed from the Off Hours Personnel Call-in List, i Appendix A. Roster III sections A & B.
- i. HP
'. 11. Chem l . iii. Technical Support iv. Operations i v. Maintenance vi. I&C l or 1 If All Support Centers are to be activated:
4.1.3.4 i
a) Instruct Security to call-in all personnel on the off-hours Personnel Call-in List, Appendix A,
'Ros'ter III sections A & B.
t I
l i
P F
I; 1-L t
' 7 of 19
- . . _,- _ . . . . ...._a-- -~W~~-----s---- - - - - ---
j '
IP-1030/7
{ 4'. 0 PROCEDURE - NON NORMAI, WORK HOURS .(CONT'D) 1 4.2 Radiological Alert / Site Area /Ceneral (use EP-Form #11).
{
f 4.2.1 Shift Supervisor -
i j a) Designates a communicator i b) Initiates' sounding site evacuation alarm and activation i of support centers.
}
i c) Initiates calculations for dose projection
{ 4.2.2 Communicator a) Fill out the Radiological Emergency Data Form, EP-Form #8.
l i
b) Call IP'3 Security:
s 1.
Alert them of \mergency status i 11. Direct them to Yescrict access to the site A
iii. Call Security (Command Post) and request them to notify the Resident Manager, Superintendent of Power, Information j~ Officer and the NYO Duty Officer using Part I of the Radiological Emergency Data Form (EP-Form #8) and Roster I (EP-Form #9) l c) Call' Con Edison Unit 2 Control Room:
- 1. Alert them to IP-3 conditions
- 11. Request offsite monitoring teams to report to the
', Emergency Operation Facility, iii. Request 1 RO immediately and if needed H.P., Chem, I&C or Maintenance Techs. to report to the IP-3 Control Room.
d) Notify offsite agencies within 15 minutes of declaration of the emergency using the Hot Line Telephone and Part I of the Radiological Emergency Data Form (EP-Form #8).
e) Notify NRC Headquarters using the direct line telephone f) Notify the USNRC Resident Inspecto g) Notify ANI
- I h) Notify the U.S. Coast Guard if emergency is Radiological in nature and will i= pact Hudson River traffic.
- 1) Notify Con Rail if emergency is Radiological in nature and
, will impact railroad traffic.
I t
j) Using the Radiologica-1 Emergency Data Form, keep adthorities (b,c,d e.f,g,h & i) informed of significant changes i (approximately every'30 minutes) - until the EOF is staffed and has taken over responsibility for offsite communications, k) Notify authorities (b,c,d e,f,g,h & i) of a reduction or l
' escalation in the Emergency Classification or Recovery Intention.
- 1) Closecut to authorities (b,c,d e.f,g h & i). l.
, - - . - . . . . . . . . - . - . ;= ~ .. ..... ..-,:._.,
IP-1030/7 4.2.3 Evacuation Alarm and Support Center Activation:
4.2.3.1 Sounding Site Evacuation Alarm results in:
. Shift Technical Advisor reporting to the Control Room t
. Watch H.P. and Chemist reporting to the Control Room unless notified to the contrary 4.2.3.2 Announce over PA:
a) "A emergency has been declared, all non watch personnel report to your Assembly Ar_a". (repeat) 4.2.3.3 Support Center Activation:
a) Instruct Security to call-in personnel from the
. Off-hours Personnel Call-in List, Appendix A, Roster III sections A & B.
b)'If the Emergency Director determines additional staffing is required, a listing of PASNY personnel by department can be found in Appendix A, Roster.IV.
c) If the Emergency Director determines additional staffing other than PASNY personnel is necessary, he may request Con Edison personnel by calling the Unit 2 Watch Supervisor.
4.2.4 Dose Projection Calculations a) Refer to IP-1002 NOTE: There are 4 call-in rosters:
Roster I, PASNY Notification Telephone' Numbers is a listing of those people to be called (notified) in the event of any Emergency Plan Emergency. This should be used in conjunction with the Radiological Emergency Data Form.
- Roster ]:I_ is the Technical Support Center staff and call-in listing.
Roster III, sections A & B is the minimum staff personnel required within 30-60 minutes of the declaration of Emergency.
. This Roster contains Department Heads, HP, Chem., Rad. Assessment.
Technical Support Center, Emergency Operations Facility, Operations, Maintenance and I&C personnel.
Roster JO[ is a listing of PASNY personnel by department available for Call-in.
Roster III should be initiated if a Unit 2 emergency is
- declared and the Con Edison Watch Supervisor requests additional non-watch personnel from the PASNY Shift Supervisor. (This does i not include those PASNY watch personnel who will be sent to Unit
'2 immediately upon request; 1 RO, 1 Maintenance person, 1 I&C Tech, 1 HP or Chem. Tech.).
[ m.
_ .. _ . . . - . _... _._._ . . - - .. e : _,. . --,_.w..- '
IP-1030/7 1
5.0 PROCEDURE - EOF COMMUNICATIONS (Use EP-Form #12) 5.1 EOF Communicator -
5.1.1 Use " County Hot Line" (RECS) and Radiological Emergency Data Form (EP-Form #8) to notify offsite agencies.
5.1.2 Use direct line telephone to notify NRC Headquarters.
5.1.3 Notify the NRC Resident Inspector.
5.1.4 Notify ANI of significant change in plant status, recommendations to the public or change in emergency class.
5.1.5 Notify OSC, TSC, CR, LAO, Security re: plant status and emergency class reduction or escalation.
5.1.6 Notify INPO, Brookhaven and adjacent businesses.
5.1.7 Establish communications with the Recovery Center at Corporate Headquarters and keep them advised of plant status. .
5.1.8 Use Radiological Emergency Data Form to update authorities -
(5.1.1, 5.1. 2, 5.1. 3, 5.1.4) of significant changes (approximately every 30 minutes).
3.g _-
,(y 5.1.9 Notify authorities (5.1.1, 5.1.2, 5.1.3, 5.1.4) of reduction or escalation in the Emergency Classification or of Recovery Intention prior to declaring or entering the Recovery phase
,[ ir' V g'[ offsite officials should be notified and confered with to assure all parties agree on the appropriatness of entering the long term recovery phase.
N 5.1.10 Closecut of authorities (5.1.1, 5.1.2, 5.1.3, 5.1.4).
5.2 Radiological Assessment Team Communicator 5.2.1 Establish communications with Onsite and Offsite Monitoring Teams.
a) Dispatch teams to appropriate locations or Determitie locatior.s of teams if dispatched by CR.
b) Plot P,1ume c) Advise teams of plant status: location, direction, and speed of plume; projected rad. levels,.
d) Instruct as to type & location of sampling, surveying to be done.
e) Record survey data from teams.
f) Repeat all incoming =essages.
nsLMLun -- - - - -
_ _ . ~ , ._...._....m..... _ _ , . ..._a_,.,._.__ , . . . ..x ._
l IP-1030/7 r . . .
g) Provide RAT with survey data.
. h) Remind teams to check dosimeters.
[
( i) Insure teams are not left in high rad. fields, r
~
5.2.2 Establish communication with OSC, H.P., Chemistry to do y dose accountability.
C
@ 5.2.3 Interrogate Ludlum Monitors.
F I .
6.0 TRANSFER OF COMMUNICATION RESPONSIBILITIES IF ALTERNATE EOF IS ACTIVATED i 6.1 If the decision.is made to relocate to the Alternate Emergency Operation i Facility (AEOF), the Emergency Director will notify the Control Room and 3~ request that the Plant Ope. rations Manager assume Emergency Director control and communication activities. The Plant Operation Manager, after
- assuming the role of the ED, should then assure the following positions-
- are assigned: Communicator and Radiological Assessment Team Leader. The 5 flowchart for EOF communications (IP-1030) should be used by the POM (ED)
- and his staff during this' transition period. When the EOF has been F
established and c'n a resume these responsibilities, the Emergency Director j at the AEOF will notify the Control Room (POM) and will again assume ED
(- control and communication activities. .
5 e
- E i:
J
~=
e
.? ,
3 1
s 1
I i
=
C
.5 Y
a
?
w
.~ . - . . . . - . - - - . . . - . . . _ . . . . . - . . . . . . . . - :a.-...~.......-..
. e EP Form #8 IP-lG30 RADIOLOGICAL EMERGENCY DATA FORM PART I - GENERAL INFORMATION Westchester l
reekskill l
- 1. Date and Time of Message Transmittal: Rockland orange l / Putnam
)
Date Time (24 hr clock) NY State
! 2. Nuclear Facility providing the initial report: Coast Guard Con Rail l A Indian Pt. No. 2 E Fitzpatrick Plant gnz
! B Indian Pt. No. 3 F Shoreham Station C Ginna Station G Other D Nine Mile Pt. Unit 1 i 3. Reported by: A , B -
l Name Title
- 4. This A is B is NOT , an exercise.
h 5. Emergency Classification: ,
A Unusual Event C Site Area Emergency
. B Alert D General Emergency
- 6. This classification occurred at , .
Date Time (24 hr clock)
- 7. Brief Event Description / Initiating Condition:
- 8. There: -
A. has NOT been a release of radioactivity B. has been a release of radioactivity to the ATMOSPHERE C. has been a release of radioactivity to a BODY OF WATER D. has been a GROUND SPILL release of radioactivity
- 9. The release: A is continuing C is intermittent.
B has terminated D not applicable
,, 10. Protective Actions:
A There is NO need f'or protective actions outside the site boundary.
B Protective Actions are under consideration.
C Recocnended Protective Actions:
Shelter within miles /or sectors /or ERPA's.
Evacuate within miles /or sectors /or ERPA's.
- 11. Weather:
A Wind Speed miles per hour or meters per second B Direction (from) degrees.
C Stability Class (A-G)
D General Weather Conditions (if available)
' 1R mR 1@
...... ..--...,-a.--..-~.~.~.a..----.~-
. . - ~ ~ -...---J--.-- ~ ~ - ~ ~ ' - - - ~ ~ -
i '
i EP Form #8 -
IP-1030 RADIOLOGICAL EMERGENCY DATA FORM PART II - RADIOLOGICAL ASSESSMENT DATA I
Date Time
- 12. Prognosis for Worsening or Termination of the Emergency:
- 13. In Plant Emergency Response Actions Underway:
- 14. Utility Off-Site Emergency Response Action Underway:
- 15. Release Information A ATMOSPHERIC RELEASE , Actual Projected Date and Time Release Started
. Duration of Release hrs hrs Noble Gas Release Rate C1/see C1/sec
, Radioiodine Release Rate C1/see C1/see Elevated or Ground Release .
Inplant Monitors B WATERBORNE RELEASE Date and Time Release Started Duration of Release hrs hrs Volume of Release gal gal Radioactivity Concentration (gross) uC1/ml uCi/ml Total Radioactivity Released C1 Ci Radionuclides in Release uCi/ml uC1/ml uCi/ml uCi/ml uCi/ml- uC1/ml Basis for release data e.g. effluent monitors, grab sample, composite sample and sample location:
16 Dose and Measurements and Projections
'A SITE BOUNDARY Actual Projected Whole Body Dose Rate mR/hr mr/hr Whole Body Commitment (for duration above) Rem Thyroid Dose (1 hY. exposure) mrem mrem Thyroid Dose (Total Committment) Rem B PROJECTED OFFSITE 2 Miles 5 Miles 10 Miles Whole Body Dose Rate (cr/hr)
Whole Body Dose (Rem)
Thyroid Dose Commitment (1 hr Exposure) (mrem)
Thyroid Dose (Total Commitment) (Rem)
- 17. Protective Action Recommendations and the basis for that recommendation:
E'
. . . - . . - . . - - . . . . . . . . . ..2. ..: . :: . . . - . . . . . . . . -. . . . .
i EP Form #8 IP-1030 RADIOLOGICAL EMERGENCY DATA FORM i
j PART III - IP-3 PLANT PARAMETER DATA Date Time
! STATUS OF ENGINEERED SAFEGUARDS EQUIP.
! MAJOR PARAMETERS (circle those in use)
- 18. RCS pressure 37. Containment Spray - VC Spray Pumps
}
Recirculation Mode
- 19. RCS temperature
- 38. Containment Fan Cooler units -
- 20. Reactor Shutdown (Y/N) 31, 32, 33, 34, 35
- 21. Natural / Forced circulation 39. Auxiliary Feed Pumps - 31, 32, 33
- 22. Pressurizer level 40. VC Phase A Isolation Complete Yes / No 1 23. S/G levels #31 % #33 % 41. VC Phase B Isolation Complete
- 32 % #34 % Yes / No
- 42. VC Ventilation Isolation Complete
- 24. Off-site /On-site power available Yes / No
- 43. CR Ventilation Isolation Complete
- 25. Containment Pressure Yes / No
- 26. Containment Temperature (31, 32, 33)
Running / Leaded / Secured /00S
- 27. RCS Subcooled/ Saturated psig Subcooled RADIOLOGICAL MONITORS Plant Vent:
- 29. RWST Level 46. R-14 (gaseous) i.
- 30. CST Level 47. RM-16 (High Range gas)
Li MODES OF SAFETY INJECTION (circle modes in use) Area Monitors:
-31. Passive Injection - Accumulators 48. R-2 Containment
- 32. High He'ad Injection 49. R-7 Containment i
j 33. Low Head Injection 50. R-10 Accident Monitor
) -
(Steamline penetration MODES OF RECIRCULATION (cirice modes in use) 51. Containment High Range Monitor i.]
(:
] 34. Low Head Recirculation - Recire Pumps
- RHR Pumps Additional Monitors of Importance:
2
- 35. High Head Recirculation -
1
? - Recire Pumps to S.I. Pumps
- - RHR Pumps to S.I. Pumps
- 36. Hot Leg Recirculation - Recire Pumps
- RHR Pumps l
M @@ W _
.,. . . . . .- . . - - _ . . . . > , . . . . . . . , . . . . . . . . . . . .. ...w....,._.
l IP-1030 1 . . .
?
b i ROSTER I I
i PASNY NOTIFICATION TELEPHONE NUMBERS
, (For use by Resident Manager's Secretary and Security)
, The personnel below shall be called and given the details of the Emergency as listed on the Radiological Emergency Data Form. Notification to these people is mandatory and contact should be made under all circumstances.
-- = -- - - -- -
i
! Contacted or
- Work Ext. Home Phone # Beeper # Returned Call I A. Resident Manager, J. Brens 201 (914)762-7362 694-0366 L
B. Supt. of Power, W. Josiger 202 (914)271-5397 694-0373 C. Information Officer, Jack Brumfield 368 (914)831-2881 694-0376 Alternate, C. Spieler 81-6224 (914)739-0357 (914)739-2171 (unlisted)
D. N.Y.0. Duty Officer ** (212)396-7005
- During normal work hours, if the Resident Manager's Secretary uses
- any beeper number, she should call Security, Ext. 261 to tell them a beeper was used and she should leave the message for their call-q in to Security.
1 4
j ** During normal work hours it is appropriate to call the Senior Vice President j Nuclear Generation and notify him of the emergency occurrence.
l h NOTE: When contacted by beeper, the,se persons will call back Security and
[ the appropriate infor=ation should be relayed to them.
i
+
NOTE: THE SS/ED SHOULD BE NOTIFIED OF THE STATUS OF MESSAGE TRANSMITTED TO l'
THE ABOVE PEOPLE.
p l
l 9
I E t ate E
r
-.i ._:. ,- - .--n..... . .. .
m--~..-
~ .
0FFSITE NOTIFICATION & COMMUNICATION PROCEDURE TELEPHONE NUM3ERS l Work Ext. Home Phone l
~
l USNRC Inspector, T. Kenny 318 (914)226-5611 (Unit 2 Alternate to T. Kenny) P. Koltay 739-9360 (914)245-1007 l_
U.S. Coast Guard Port Safety Officer (212)668-7936 t Consolidated Rail Corp.:
(Conrail Chief Train Dispatcher) East Side of River (212)340-2050 340-2052
- West Side of River (201)S58-2385 American Nuclear Insurers '
(203)677-7305 IF THE HOT LINE', RADIO AND NAWAS ARE NOT WORKING call, Westchestar County Warning Point (914)769-3100 (Ask for Watch Officers Desk)
Putnam County Warning Poin't -
(914)225-4300 Rockland County Warning Point (914)354-8300 Orange County Warning Point (914)294-6860 City of Peekskill Police Commissioner (914)737-8000 X224 N.Y. State Warning Point (518)457-2200 457-6811 If all communication lines are down, radio the State Police by means of the Security Plectron device. Request the State Police to contact the State Police
[ in Albany and make contact with Westchester, Rockland, Orange & Putnam Counties &
- the City of Peekskill.
l IF THE NRC DIRECT LINE IS NOT OPERATIONAL, call l
[ 1. NRC Operations Center (via Bethesda Central Office) (202) 951-0550
- 2. NRC Operations Center (via Silver Spring Central Office) (301) 427-4056 r
- 3. Health Physics Network Line (to NRC Operations Center) 22 l'
- 4. NRC Operator (via Bethesda Central Office) (301) 492-7000 l
[
s i
16 of 19
.o e
TOT I F ICATION -GNPesNICK.T I ON-ST AFF I tal i LP-rosa e la NON R ADIOLOGICAL Eff ERGENCY . ' .
a)ertsut. POOM ranCEDupAL FIEW CHART Dr.CIJhpATIOff Or s *
-Unusual twent t
-Non p.aJ. Aler t N " W" ' M t Technical Assistance Alesee la SitIFT SHPFSVISon
.Deeignates ll" I ' *d 8 echnical s Ogerationa Technical Assistance C Of f esours y pequest STA to pelort to e pequest Seceerit y to 3262 To:
} SuPgert Centers Ast,1sstance penguirest Alone is perpeltest enicator the Control Roamm o se Actleata=3 -Detesmine which -Call in Pes sosinal oro nonc er s ,
Support Centers ase j
- 4 tlkcLirair i.
I I Nij {'
PA to Announces Use PA to Aswooisnees Use PA to Aeinconces
-" Technical Suggett Technical 6 Operational
'igency Dissctoes - " Technical Seginee t Center Persosenel peger Asslastance peijula _ del ,
pet. Assessament Centers Personnel peiluost Security x262 Tus Eelost to the f.t
- peles t to this TSC" to the TSC* -Call in Perseawniel ag Hecessar Pas sonnel peror t ~~Ol "*'
- E IO"S S*44*' t "Shif t Technical ,
j.
Cent er Pes sosuie t , Advisor peport to the lioster III. Sections A&n the ySc=
. tit loess Fug1=>s t 8'lest to t he 09C" Control poom" ,,
OH F g
r Pitsoneet. l "STA Report to the . ;
of t to t ime '36C* Control R.jusn" gyesingrATOtt f.91 Santigwat t Center s to lie {
[A Erg os t to the -rilt out 944. Emerg.
Act - - - -
- -.Beatests-j pequest Securit y 3/62 To I '* I 8""'. gg,g,yo,, ,
.c,gg g,p,,,on,,g on gg,,g,,
I uther Pessoeuwt g,gg gp,3 gogggggy ggggg ggg i FT *** Tour nos mi \,
<. l int Information on pad, incrg.
Call pesident M.wi.egers Sec. I200s
--> luta Fosa opf
-Cive Informatlon est Its1. Fw rg. w(.-
""*I -Etespeest them to feutifva BM,$OP IO & If Ad'Altle nal Perssuneel is s
Dat a roep work Off _ljyg h u fficer esecessary . ,
- Mc< est see o notify:MM.SGP.IO & ,,,,, no,,r s '
II ""' * *
- I"8"I E* ' ""#
Call IP-2 Control II< ween I Call IP-2 Comtsol poemas e t I s nc Wth 2) c. p c .g ipnr 4 }A
-Alert them to IP-3 Feesgency 4 g penguest Persseetnel Seegg=y
,,, g Cond1 tion HP or Chm J W m ;
8
)
i 3r k
e The Communicator Will Hot if y !
sif f stle Antinorities Within ,
15 Minute s of the Declarat for 8
ln ~ - of "an Faergeewy l pg . peggdeset theeager ?
If tam r9ency Ogn= ration sop, s,q,c, Int ceplent of Po=*er Facility is Staffeel 4 {
catlong y go ,g,go,,ngg ,oggg c. ;
. Tranaifer Cmsnam , ;
- Westehester - Putnam f 1f E
- Peckskill - N.Y. State
= Shif t Segervisor penponsibility - Newkland - f ack to sk>t Line las Radio ,
y - Os ange _ nacg ,p t o giaagu $ss NAWAS, one f
trale Direct f.Ine fiumer call seashef.
l - Cdii NHC He.n4psartere is a1encic1 l
\ = Shif t Supervisor pestynste Jb Telephrwee. , ,a,g,p g , ,,gugg g ,, pc.p,g,, ,g ga g ,& -
, f r - Call pesident. Inf.pector g e g ephonses b f l s WB
= Commenwelcator (agslined by Shif t Segervisor) 8.cep Of f alte huttw*ritle9 inergency Deen l n., o H (^
Infosmed Of S!qnificant Nes pQnulet.fpe ".TcLiniDAL@l 'd Ctsateg.)s or of t"per s gesery Clang th>hect ion or o ,
Escalation or peewery - gg g gy ] tJ O
Ino ce.s le oglove H.ed.
3,,g hs r li ka j DJoerg. tut.* Forn L
. . ..~u 2 . u es . .- %_
.J e
NUT I F ICAT ION-CONFglNICATIOfs-STAFF I NG rP-rorm e 11 H ADIOLOGICAL EMEHGENCY Control Rmma Procedural Flow Char t l*CIARAf ton cry
-padiological Alegt
-Site Area rmergency
-General rmergency ,,
srRfHD SITE STACUATION A8 ARMS wggg p,g, sit Inc Use pas
- rqcacy la rects>s s & Ba l . Asseg e t'
[r? St1PrpVISon tr. "
.A Emergency has been i
-Designates declared. All ston-watch pessonnel toseProjectif
~ * "" " **I"C""'" """"
- e
@'" \
N:IIo! M ic. { 05 r tenues CalI Security n X2f>2s l
-pequest them t.s call in ter soewiel (
on moster IEE.
Call IP-) Scoerity I M .
-Alert to emes 4 .x y t'enal t tons 4 4
-ptreet tlwei to Festelet Access to ;
- Call IP-3 Sertority 32fs2s 541e 3r Nos mal 1 -Alert to Fancrqcacy Conilition i
"' k ICAW" ' 4 0" I"I *" Rdd
- Id""r g saat a Fr.f m j Call pesident M.in.wjers Sewset ary: og g
,,"'Up.- -Respaest these to that t fy: DM.SOPe10 &
4 piarE g -Fill Out pad. Emegg. Laata t'orm -
-Give Info. Ote Rael Daerg, Data f'orm NYO Diety Of ficer 4
-peepeegt het to Notifya RM, SOP,10 5 -plsect tlices to pent rict Access in NYO Dut y OII neer y gc S
~
Call IP-2 Cont rol thwans
-Alert tlwm in IP- 3 f acrgency reisedi t t. n C I P-7 Cemit s ol poema s
%
- pcipseg t I MO Immimila t ely
-Alert them to IP- 3 Faergens.y conditlang
?' '-
.gg ,,c,..a,y ,,,,,,,g n,,g,g,, g sc ,,,p
"' CI*"* T*C8*8-b_1 1 1. . _ -scarnest Of f sit e Minnitoring 1eam to {
3, s c6=>s t t o t he rJ W .__
The Comununicatw Will saatify of f site Aettu.sttles Wphlen f
. IS Minutes of the twctwat ton )
of an Im.rgency
/w -
if r.iergency operation lacility is Staf fed -
- " - - - - - " - ~ ~TsangIer Communtrations'~ FJG = pesident M.nn.nyer Use ht B.ine & fag.l. pane,rg. p. eta ros e
- Westthegter - Putnam SUP= Super int eneleott of Poseer
'r - Peckskill '- N.Y. State 10 = Informe.st ion Of firer
- Rocklarvt 6-4
- Shift Stepervisos Resguins t hi li t y - Or meyge Unn Direct B.Ine Phones p i
- Call NetC Hea4pnet ers O I Shift Supervlnor Deistynce ,
d' use Tele.itww et
- Call pegident Inspector !
= Shift Supervisor Desiquee Ii $
ycep of f site Aut hor t t le" "
Y
- Has fai=rqcen y Been Is. forme.I of nn gnificant v'eT htas l p agel IO Nin.
l {%p i Ter minated . packup to p+ tin Lg NAWAS, one Call re*Cl## (**1"5 I *S Chasiges or of smeegency
= Comenseilc.ator ( Asslyned t>y Shif t S*spervisoft Cl. ass Re hscr ion or i' yes - Packup in NAWAS lse pcquiar dlat teleidusnes
^
INealation nr Fernvery g g Intent lon seglewg R.sil . l gut iust i t les I FJee?e q. D.et a Form
9 FF-ros e $ 12 te7FirtCATIN4Dece281 CAT OH-STAf7310G '
mAhlotoGICAL t>Es W27sCT e
sur Isu1CIDumAL rider OtART NWATim we me H a me to th AM le wessas y t ransfer Waue ,
- Cack up to skit I.ine in Isadio
- M d ogleal Alert mMcahMMeehNOMM M MrN e 3.ck go to p.4to 3. uneeng * ** 9""#I mact up to mAwAs as regislar dial telephone -ceneral panergenecy se plate the laittal statlfication to ANI at the Alert or Alwwwe clatelfication, rot teve-ug. sustif t-
) j c.ations are nnly necessary for algnificant plant Sittr7 Start:NVI5ne (ED) status cleaswpes, change in emesgenry class. when teotify Emergency Director k rectmanemlat ions to ledelle are oude, or closeuset. and Itad. Assessment Team 7 to report to Enr via ?
. -P.A. System (th>tatt temak Mrs.) *
-Security lof f Hrte.) 's b a, Wesen staffed, Ecr ,
Ct>setact Coattot j 8'"'" I *f PI**L )
assessee control and a ce==nue l ca t iosos status -
I e
E11r Ceuumienicatog Bad. Asseaement Int er gewpat e Team C Scator tmtlum Sheltosse +
pecord 6 Fleet Emet.i !
1 r
I I f- i 1 :
5** 8k*t LineI6 s>>tification HistifD GC TSC. CR, EAo teotify Iser0 Estals. Cusamunications Estate. Csemunicatises Est ats. D eusesencat losee .
recurity mes riante Status with onelte Itsettorin=3 witio offelte stelte. stag uitless5C,str. Cheeletty .
' 88'I t C helt* K -reatnam g 3,,,9, y Class Brookhaven Tamme Teams to enn ebene arecessetability
- = ",i :;;,;,,,, s-i-tton o, e.c.l. u on or re exswee r Ipet ent lose. s;st .t..
A.li.e.s.t . . . -
g Camemmeltat8eeen elIh Itaeovery '
)
1 t 11 useC Ctaaepsastera 8' enter anet becp adviscil of all realsk-nt Ins pect or status. -Dispatch teamie to aggstgrlate -DispatcIn teams to apprags tate #
_ l.canos.. or l_.aus [
.e l l A,.. .e
-tartermine locat ione of teas == if -Plot Plimme ,
dispatcled I,y C.st. -A.tvise teams of 1,lant statues
-rlot Please ' location, directiose ased opsend of
-Advise teams of plant statuse plasses puojecte.l t ad. levels .
l lascattee, disectinee enri specaJ -Enetruct as to t yge & larat iese Have 10 Min 88 0 d of plusses pres)ected raJ . levels of easyllag, susveying to te eme g y*recay ] **"]l -lantsuct as to type a locatiose -peceed musvey data f aces teams e.f e.implise3. nueveylsus to le done megeat all incuelseg massagae i Vee Yes -Inecord survey data f ree teams -rsovide SAT m/sensway data
-peleat all lensaming messages -penised teams to check doelmeters
,, -Ensure teams ase not left in hig0n
-rsovide DAT m/seervey eLata
-peatseil tease to check doelmeteve sad. fleide.
'Feef Eft'filts Authorittee. <r
- '"*"'" * **"" "'" ' >t l e f t l a higie ;
Os f nee.l af storaficant l uot a ry Antt ,r n e se. l rad. fielde 64 changes or of Emergenty Olama peductice or Escalattos t a merevrery inee tlan. es O
Ra'8. Esmerg. that n 3 oe s. ta O,
l . ,
- , . . - . . ?*:4# W.W.,
', IP-1040
[ HABITABILITY OF THE EMERGENCY FACILITIES ,
1.0 TNTENT To describe the necessary checks to determine if the radiological conditions of the E=ergency Operations Facility (EOF), the Technical Support Center (TSC) and Operations Support Center (OSC) are such that a move to their alternates is required.
2.0 PROCEDURE'FOR THE EOF:
- 2.1 The Emergency Director, or the Radiological Assistant Team Leader upon arrival at the EOF, vill immediately call the Unit No. 3 Control Room to confer with the Shift Supervisor on whether or not the EOF has been involved in the plume since the start of'the emergency, and if so, for how long.
2.2 Interrogate the Meteorological system at the EOF to determine if the meteoroldgical conditions have prevailed for the past hour.
2.3- Follow guidance in section 3.0. .
2.4 The EOF will be considered tenable after careful consideration of the following:
. 2.4.1 Radiation fields inside and outside the EOF.
2.4.2 Meteerological Conditions at the time a) Plume direction b) Atmospheric Stability c) Weather forecast obtained from the National Weather Service at 914-936-1212.
. If the decision is made to relocate to the Alternate Emergency Operation Facility (AEOF), the Emergency Director will notify the Control Room and and request that the Plant Operations Manager assume Emergency Director control and communication activities. The POM after k'e4 assuming the role of the ED should then assure the following b positions are assigned: Communicator and Radiological Assessment p Team Leader. 'fhe Flowchart for the EOF communications (IP-1030) should be used b.y the POM (ED) and his staff during this transition period. When the AEOF has been established and can resume those 9 responsibilities, the Emergency Director at the AEOF will notify the Control Rocm (POM) and will again assume ED control and communication activites.
t
~
3.0 N" m "Y EO F , T E C . /."O ^ ^ C 3.1 The Emergency Locker should be unlocked.
3.2 If the emergency is one where radiological conditions are expected, the radiation monitoring equipment should be put in use i=cediately.
3.3 An initial survey should be be made for beta and gacma fields, and results recorded in the log book.
1 of 1 1
I . ,. ,. . . . , .
. . . . - . . - . . - _ . . . . . . . .. - . - _ . -. ~..t _.
).
IP-1040/5 3.4 If at tLa EOF perform beta and gacca surveys outside the building.
Record readings in the log book.
3.5 After the initial survey, an H.P. technician may be contacted (through the OSC) to discuss and/or set up further monitoring equipment.
3.6 The results of the radiation surveys are to be analyzed, and an evaluation of potential radiation hazard is to be made by Radiological Assessment personnel, Health Physics personnel or the Facility supervisor.
3.7 Check Radiological conditions frequently and record all readings in log book.
3 8Jon11 erin for personnel should ba in accordance with IP-1041.
4.0 HABITABILITY CUIDANCE ,
VI Kous factors and d ditions niust be considered when deciding on the Habitability of the Operation Facilities and Canters. Whole body, beta and iodine doses sust be measured and evaluated along with the accident conditions and circumstances.
l The basic .? actor to consider is whether or not the accident is under control:
is tne radiological release terminated? or will stop it shortly? or, is the release expected to continue for hours or days? The duration of expected 4 re2+.ase, along with advantages and disadvantages of moving, must be e considered. The following is offered as general guidance:
4.1 Whole_ Body ard Beta Doses Maximum acceptable total dose for a 10 hr. release l Fields 10 mR/hr
. Considerations move if feasible
[
100 mR
/3
- 300 mR 100 mR/hr move if at all possible 1000mR 3000mR i
500 mR/hr move 5000 mR 15000 mR f
I *#G = 3 x WB rather than 6 x WB because the lens of the eye has i been factored into the calculation.
4.2 Iodine Doses i
From the Iodine sample taken the concentration of I-131 can I be determined a'nd from this the dose of I-131 is determined.
L 6 j
Dose a Concentration x 1.5 x 10 x hr breathed = Rem thyroid If the dose is 1 R or greater distribution of KI should be considered.
! If the dose is 5 25R KI should be given.
l If doses are greater than 252 give KI and re-evaluate the dose to the thyroid on that basis. Then make the deter =ination r,f whether or
~
j i not to evacuate the facility or center and ralocate.
4.3 The Radiological Assessment Team should be consulted for
- recommendations and dose proje
- :tions prior to any relocation of the l Operation Facilities.
L _ J