{{#Wiki_filter:_ AVERAGE DRILY UNIT POWER LEVEL Docket No. 50-272 Unit Name Salem # 1 Date July 10, 1983 Completed by L. K. Miller Telephone 609-935-6000 j Extension 4455 Month June 1983 Day Average Daily Power Level Day Average Daily Power Level (MWe-NET) (MWe-NET) 1 809 16 982 2 1085 17 1089 3 1087 18 1083 4 1070 19 1084 5 1096 20 1061 6 1087 21 1112 7 1093 22 1091 8 1065 23 1094 9 1107 24 1091 10 1084 25 1105 11 1087 26 1063 12 1081 27 1087 13 1090 28 1080 14 1071 29 1372 15 1186 30 1104 31 0 P. 8,1-7 R1 Page 2 of 18 1 -{,G 8307150072 830710 sI g PDR ADOCK 05000272 R PDR
OPERATING DATA REPORT Docket No. 50-272 Date July 10, 1983 Telephone 935-6000 Completed by L. K. Miller Extension 4455 Operating Status 1. Unit Name Salem No. 1 Notes 2. Reporting Period June 1983 3. Licensed Thermal Power (MWt) 3338 4. Nameplate Rating (Gross MWe) 1135 5. Design Electrical Rating (Net MWe) 1090 6. Maximum Dependable Capacity (Gross MWe)ll24 7. Maximum Dependable Capacity (Net MWe) 1079 8. If Changes Occur in Capacity Ratings (items 3 through 7) since Last Report, Give Reason N/A 9. Power Level to Which Restricted, if any (Net MWe) N/A
- 10. Reasons for Restrictions, if any N/A This Month Year to Date Cumulative
- 11. Hours in Reporting Period 720 4343 53352
- 12. No. of Hrs. Reactor was Critical 720 1214 23939.2
- 13. Reactor Reserve Shutdown Hrs.
0 2033.4 3006.5
- 14. Hours Generator On-Line 720 980.3 27628
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (bnHI) 2396964 3063272 82233463
- 17. Gross Elec. Energy Generated (BUGI) 814080 1038950 27003800
- 18. Net Elec. Energy Generated (MWH) 782222 955453 25550306
- 19. Unit Service Factor 100 22.6 51.8
- 20. Unit Availability Factor 100 22.6 51.8
- 21. Unit Capacity Factor
~ (using MDC Net) 100.7 20.4 44.4
- 22. Unit Capacity Factor (using DER Net) 99.7 20.2 43.9
- 23. Unit Forced Outage Rate 0
71.3 31.6
- 24. Shutdowns scheduled over next 6 months (type, date and duration of each)
N/A
- 25. If shutdown at end of Report Period, Estimated Date of Startup:
N/A
- 26. Urlts in Test Status (Prior to Commercial Operation):
Forecast Achieved Initial Criticality 9/30/76 12/11/76 Initial Electricity 11/1/76 12/25/76 Commercial Operation 12/20/76 6/30/77 8-1-7.R2 Page 3 of 18
UNIT SHUTDOWN AND POWER REDUCTIONS Docket No. 50-272 REPORT MONTH JUNE 1983 Unit Name Salem No.1 Date July 10, 1983 Telephone 609-935-6000 Completed by L.K. Miller Extension 4455 Method of Duration Shutting License Cause and Corrective No. Date Type Hours Reason Down Event System Component Action to 1 2 Reactor Report Code 4 Code 5 Prevent Recurrence Condenser Tube and Water Box Cleaning HC HTEXCH (incl circ water) 83-058 6/01 F 4.0 B 5 Traveling Screen / Trash Rack Canal 83-060 6/02 2.7 HF FILTER Screens 83-062 6/02 2.3 83-064 6/03 3.3 83-066 6/03 2.9 83-068 6/03 3.0 83-070 6/04 4.2 83-072 6/07 4.7 83-074 6/07 27.5 1 2 Reason 3 Method 4 Exhibit G 5 Exhibit 1 F: Forced A-Equipment Failure-explain 1-Manual Instructions Salem as S: Scheduled B-Maintenance or Test 2-Manual Scram. for Prepara-Source C-Refueling 3-Automatic Scram. tion of Data D-Regulatory Restriction 4-Continuation of Entry Sheets E-Operator Training & Licensing Exam Previous Outage for Licensee F-Administrative 5-Load Reduction Event Report G-Operational Error-explain 9-Other (LER) File H-Other-explain (NUREG 0161) Page 4 of 18
UNIT SHUTDOWN AND POWER REDUCTIONS Docket No. 50-272 REPORT MONTH JUNE 1983 Unit Name Salem No.1 Date July 10, 1983 Completed by L.K. Miller Telephone 309-935-6000 Extension 4455 Traveling Screen / Trash Rack Canal HF FILTER Screens 83-076 6/07 F 5.6 B 5 83-078 6/08 5.1 83-080 6/09 4.5 83-082 6/09 5.2 Condenser Tube and Water Box Cleaning 83-084 6/10 2.7 HC HTEXCH (incl circ water) Condenser Tube and Water Box Cleaning 83-086 6/11 3.9 HC HTEXCH (incl circ water) Condenser Tube and Water Box Cleaning 83-088 6/12 2.0 HC HTEXCH (incl circ water) Traveling Screens / Trash Racks / Canal 83-090 6/13 8.8 HF FILTER Screens 83-092 6/15 4.1 83-094 6/15 1.7 83-096 6/16 5.0 1 2 Reason 3 Method 4 Exhibit G 5 Exhibit 1 F: Forced A-Equipment Failure-explain 1-Manual Instructions Salem as S: Scheduled B-Maintenance or Test 2-Manual Scram. for Prepara-Source C-Refueling 3-Automatic Scram. tion of Data D-Regulatory Restriction 4-Continuation of Entry Sheets E-Operator Training & Licensing Exam Previous Outage for Licensee F-Administrative 5-Load Reduction Event Report G-Operational Error-explain 9-Other (LER) File H-Other-explain (NUREG 0161) Page 5 of 18
UNIT SHUTDOWN AND POWER REDUCTIONS Docket No. 50-272 REPORT MONTH JUNE 1983 Unit Name Salem No.1 Date July 10, 1983 Completed by L.K. Miller Telephone 609-935-6000 Extension 4455 Traveling Screens / Trash Racks / Canal 83-098 6/18 F 4.4 B 5 HF FILTER Screens 83-100 6/18 7.9 83-102 6/19 9.3 83-104 6/20 3.1 83-106 6/21 2.5 83-108 6/21 0.6 83-110 6/21 4.3 83-112 6/21 1.9 83-114 6/22 3.8 83-116 6/22 2.4 83-118 6/23 2.4 83-120 6/23 3.1 83-122 6/26 2.3 1 2 Reason 3 Method 4 Exhibit G 5 Exhibit 1 F: Forced A-Equipment Failure-explain 1-Manual Instructions Salem es S: Scheduled B-Maintenance or Test 2-Manual Scram. for Prepara-Source C-Refueling 3-Automatic Scram. tion of Data D-Regulatory Restriction 4-Continuation of Entry Sheets E-Operator Training & Licensing Exam Previous Outage for Licensee F-Administrative 5-Load Reduction Event Report G-Operational Error-explain 9-Other (LER) File H-Other-explain (NUREG 0161) Page 6 of 18
UNIT SHUTDOWN AND POWER REDUCTIONS Docket No. 50-272 REPORT MONTH JUNE 1983 Unit Name Salem No.1 Date July 10, 1983 Completed by L.K. Miller _ Telephone 609-935-6000 Extension 4455 Condenser Tube and f Water Box Cleaning HC HTEXCH (incl circ water) 83-124 6/27 F 3.1 B 5 Traveling Water Screens / Trash Racks '83-126 6/29 3.2 HF FILTER Canal Screens 83-128 6/29 2.7 83-130 6/29 6.5 83-132 6/30 1.2 1 2 Reason 3 Method 4 Exhibit G 5 Exhibit 1 F: Forced A-Equipment Failure-explain 1-Manual Instructions Salem as S: Scheduled .B-Maintenance or Test 2-Manual Scram. for Pt.: para-Source C-Refueling 3-Automatic Scram. tion of Data D-Regulatory Restriction 4-Continuation of Entry Sheets E-Operator Training & Licensing Exam Previous Outage for Licensee F-Administrative 5-Load Reduction Event Report G-Operational Error-explain 9-Other (LER) File H-Other-explain (NUREG 0161) Page 7 of 18 i
C M NO3 50-272 MAJOR PLANT MODIFICATIONS I REPORT MONTH JUNE 1983 ~ DATE: JULY 10, 1983 COMPLETED BY: L. K. MILLER TELEPHONE: 609/935-6000 EXT. 4455'
- DCR NO.
PRINCIPLE SYSTEM SUBJECT 4 lEC-0540A Post Accident Sampling Addition of a post IOCA containment air and reactor coolant sampling system. lEC-0637 Fuel Handling Crancs Modify fuel handling crane to accomodate new fuel racks hook limit. lEC-1103 Control Room Overhead Replace interim overhead annunciator Annunciators windows with new permanently engraved finished windows. lEC-1629 Solid State Protection Revise wiring as required within the (R120) and Safeguards (R130) auxiliary relay rack #59 and 1RP1 such that components installed via lEC-0958 and associated wiring meet the separation requirements of CD-S-1, Rev. 5. ISC-0259 Fire Protection Install additional fire alarm pull stations at Service Water Intake Structure. 1SC-0665 Liquid Waste Disposal Remove FT1007 and replace with spool piece. ISC-0926 Steam Generator Blowdown Remove present GB186 valves. I i r
- DESIGN CHANGE REQUEST Page 8 of 18 l
8-1-7.R1 1 1
MAJOR PLANT MODIFICATIONS DOCKET NO.: 50-272 REPORT MONTH JUNE 1983 UNIT NAME: Salem 1 DATE: July 10, 1983 COMPLETED BY: L.K. Miller TELEPHONE: 609/935-6000 X4455
- DC R NO.
10CFR50.59 SAFETY EVALUATION 1EC-0540A The addition of some minor structural steel members to support non-safety related valves in the post-Loca sampling system does not result in an unreviewed safety question. No unreviewed environmental questions are involved. 1EC-0637 The changing of the indexing scales on the fuel handling crane does not alter any presently performed safety analysis nor does it create any new safety hazards. No unreviewed safety or environmental questions are involved. 1EC-1103 This change improves the presentation of alarm information and alters no functions. No unreviewed safety or environmental questions are involved. 1EC-1629 The wrapping added to the control, instrumentation, and protective systems cables is fire retardant and will enhance plant fire protection. No unreviewed safety or environmental questions are involved. 1SC-0259 This change adds more pull stations to more efficiently cover all areas of the service water intake structure. No unreviewed safety questions are involved. 1SC-0665 Replacement of a small bore flow meter with a section of flanged pipe does not involve any unreviewed safety questions. Additionally, no unreviewed environmental questions are involved. 1SC-0926 The original design concept of the blowdown system remains unchanged. Plant effluent discharges are unaffected. No l unreviewed safety or environmental questions are involved. l Design Change Request i Page 9 of 18
PSE&G SALEM GENERATHE SIATION SAFEIT PELATED KORK ORDER ILG Si1EM UNIT 1 WO NO DEPT UNIT EQUIPMENT IDD7FIFICATION 908933 MD 1 FIPE BARRIER rM FAILURE DESCRIPTIW: SURV. 200911-VISUAL INSP AREA 1418 IUX EQUIP AREA 100EL. TTC PENS AS NT. REPT DESC TO PEN CO-ORD. CORRECPIVE ACTICN: n.a<tORMED INSPECTICN, 'IEGING AND VERIFICATIW T DISCREPANCIES AS PER WORK ORDER. 830413 919929 MD 1 RX BYPASS BKR A FAIIURE DESCRIPTIW: BKR CLOSED & 125VDC 07fRL BG OET, BKR REMAINS CILGED BUT TRIP LIQff CN CWSOLE CCMES ON. 830404 CORRECTIVE ACTICN: REPL 527 RELAY & TESTED BREAKER. IOST CIOSED BUT DID NOT GET GREEN TRIP LIQfr. 830411 922297 MD 1 1C EFERGENCY DIESEL FAILURE DESCRIPTIW : PRE-LUBE PUMP MAKES EXCESSIVE NOISE APPROXIMATELY 30 SECWDS AFTER IT IS PUI IN SERVICE. 830517 CORRECTIVE ACTICN: INSTALTm NEW PRE-IEEE PUMP 83C317 922523 MD 1 11 SW PMP BKR FAILURE DESCRIPTIW: BKR SbOKED MIILE TRYING 'IO PUT IN SERVCE. OCUID NOT ICKNCWIEDGE SIOP PB ON BEZEL. 830505 CORRECTIVE ACTICN: REPL STRING COIL W BKR. 00IL SMDKED (STARTING RELAY), REPL STARTING REIAY (6) RC13-6-2-1. 930516 922637 MD 1 1C EMERGENCY DIESEL FAIIURE DESCRIPTICN: MECHANICAL SEAL W PRE-IUBE OIL PUMP IS LEAKING. 830509 CORRECTIVE ACTIW: REPIN'Fn SEAL AND ('rFANED UP SHAPT. 830516 Page 10 of 18 I
PSE&G SALEM GENERATING STATION LAFEIY REIATED h0RK GDER TIG SAIIM UNIT 1 WO NO DEPT WIT EQUIPMENT IDENTIFICATION 922 % 8-m 1 11 BOR 1CID XFR PMP FAILURE DESCRIPTICN: ICMP HAS BEARING OIL IEAKS. 830307 CNRECTIVE JCTIN: REPL. INBD & OFBD OIL SEALS. REPL. SHET & BRGS. REPL. STANRY & MECH SEAIS. REAIEN & RCRD VIB RDNGS 830317 923538 MD 1 VALVE 12CC16 FAILURE DESCRIPTICN: VLV WILL Nor EULLY CISE ELECTRLY. MJSr MAN CLSE VLV DWN 1 IN. AETER MUICR SIN S. 830321 CORRECTIVE JCIICN: RESE7f CLSNG TBQ SW 'IO 2. CLSD IND BEING RECD WITH BOIH PUMPS RUNNING. 830405 924272 MD 1 INCORE DET SYST FAILURE DESCRIPTICN: DRV A PATH NOR POS LIMP SW NEEDS JnTSIMP & DRVS B & F NEED DET & CABLE ASSY REPINDENr. 830122 CORMIVE JCTIm: REPAIRED CH A 5 PA'IH MO REPIJCED B & F DRIVE UNIT CABLES. 830124 924612 m 1 1A SBC FAILURE DESCRIPfICN: 1A SEC PASSED SURVL TST M3B EXGPT NHEN RE-ENERGIZED FAULT TRO IGIT WAS LIT. 830310 CORRECTIVE ACTICN: REPRD BROKEN WIRE IN P4 PLUG 'IO HORN CKT. REPL BAD PC BDS IN SLOTS 42 & 57. REPIJCED HORN. 830311 924654 m 1 12 BOR JCID XER INP FAIIURE DESCRIPTICN: ICMP HAS OIL IEAK 830316 CORRECf1VE JCTICN: REPL SHET BRGS, JOR4 CRANE MECH SEAL & SINRY SEAL. REINSTALLED, ALIGNED & CHECKED VIBR. 830323 Page 11 of 18
PSE&G SAI2M GENERATING STATION SAFE 1T REUGED WORK ORDER ILG SAIIM UNIT 1 WO ND DEPT WIT EQUIPMENT IDENTIFICATI N 924730 MD 1 UNIT 1 & 2 RCP's FAILURE DESCRIPTIW: INSP UNIT 1&2 BCP'S & VERIFY f3 SEAL SPIASH GUARD IS MIITE TEETIN INSIFAD OF r BICK RUBBER. 830324 00RRTTIVE'1CTICN: AIL BCP'S GECKED AtO O/C VERIFIED SAT. 830325 0 924801, MD 1 FIRE BARRIER INSP. t r E FAIIURE DESCRIPTIW: IO200899-PERF VISUAL INSP AREA 1426 OUTER PIG PEN AREA 100FL. TAG TS NEC.. I REPT DESC TO CCFCED 830328. .,. j j ? 00RRECEINE ICTIW: INSPECTED AREA, HUNG 'DGS, PREPARED MAPS,' RD FTTJm PENEFRATIWS A5 EEIDED. 'it i,, ' '830419 b, /924925 m 1 12 BPir PWP y 'FAIIURE DESCRIPPIW: ICMP MECHANICAL SEAL LEAKS. l830329 v ,j CORRECTIVE JCTICN: REPL MECH SEAL AND STATINARY SEAL. ' REALINED PUMP & CHECKED VIBRATIWS. h 5 ~.5 READINGS SAT. 830330 3 .i r, ,y a 924885 MD <1 " GECUP & VITAL BUSSES e Y FAILURE DESCRIPTIW: IO200921-CCIOCT UtOER VLTU SETPNP & TIME RESP TST FR VITAL & GRWP BUSSES. 830405 /, 0' 00RRECTIVE ACTIW: ONPLTD TEING. INSTATIE NEW TIME DELAY REIAY IN IC. 90i! UNDERVOLTIGE GT. /. K-830413 924971 m 1 VALVE 12SW57 1 FAIIURE DESCRIPTIW: OPEN AIO INSPECT VALVE FOR ANY CIIXEING DUE TO SILT OR SHELL LIFE. 830419 h 41' ,1 CORRECIIVE ACTIW: RENVE VLV, FOLND APPROK 10 PTFrPR T PIASTIC 1/4 IN DIA. CLEANED AND f f.
- \\, ~ i" 4-REINST7JJ.m GIlv'E.
630424 i Page 12 of 18
PSE&G SALD4 GENERATING STATIN SAFELY RELATED WORK ORDER IOG SALEM UNIT 1 WO NO DEPP LNIT EQUIINENT IDENfIFICATIN 924972 MD 1 14 CNf. ECU 1 WIT FAILURE DESCRIFfICN: OPEN & INSP MIR CLR EOR EVIDENCE CF CIOG;ING 00E 'IO SILT & SHFHS. GECK BOI'IEM OF SEC. CLR. 830419 CORRMIVE ACTIW: NO mnXING E0GO IN MUIOR COOLER OR SEIXNDARY CDOLER. 830425 925369 MD 1 11 SERV WATER PUMP FAILURE DESCRIPTICN: EXPANSIN JOINT W PWP DISCHARGE IS CRACKED FRCM OVER PRESSURIZATIN. 830201 Cuc<ELnVE ACTICE: REPINE EXPANSION JOINP 830208 925371 MD 1 VALVE 16SW26 FAILURE DESCRIPTICN: STRAINER BACIMASH VALVE APPEARS 'IO HAVE BION DIAPHRAM. TELL TALE LEAKING. 830211 CORRMIVE ACTICN: REPLACED DIAPHRAM 830214 925382 MD 1 1C 125V AC BUS PWR FAILURE DESCRIPTICN: IC INVRIR AC SIBY AVAIL & BEING USED LITES CN/AM4EITER 0 40 AMPS. SOLA DENRGZD I LITCS OUT ArMPR @ 40 AMP CORRECTIVE ACTICN: unwd COIL CN K4 RELAY WIICH CAUSED EUSE F1 TO BIOW. REPL RE[AY & EUSE. RESID INVRTR 'IO SERVICE. 927300 FD 1 12 RCP MOIOR FAILURE DESCRIFFICN: 12 BCP TRIPPID (N HIGH CURRENT 830129. CuoeL'nVE ACTICE: REMOVED 12 BCP M7IOR FOR REPAIR AND REPIKED WI'IH 24 BCP M070R 830216 928523 ND 1 12 (PTTJRR CCNDENSER FAILURE DESCRIPTICN: RECIRC PUMP LEAKS HATER EXCESSIVELY. 830209 Cuoex;nVE ACTICN: REPIKED MECHANICAL SEAL. 830228 Page 13 of 18
- - _ =. - PSE&G SALEM GENERATING STATION SAFEIT REUGED WORK ORDER LOG SAIDi UNIT 1 w WO NO DEPT LNIT EQUIPMENT miNnrICATIN 928765-m 1 12 CUTTIm WrR INP FAILURE DESCRIPTICN: REP HAS MECHANICAL SEAL LEAK. 830119 Cuoci.nVE ACTION: REPIACED INBOARD AND CUFBOARD OIL SEALS. REPIJCED MECHANICAL SEAL AND GASKET. REALIGNED PLNP 830329 - 984782 m 1 12 STEAM GENERAIOR FAILURE DESCRIPTICN: PEREORM Uf INSPECTIN W STEAM GENERA'IOR CIR'IH NEID FIOi CUISIDE. 820618 i Cuoci'nVE ACTION: INSPECTION PERFORMED AND FOUND ACCEPTABLE. 821030 985811 FD 1 VALVE 1SA119 FAILURE DESCRIPTIW: OPEN VALVE FOR INSPECTICN BY SITE ENGINEER AIO REPAIR AS DIRECTED '10 ACHIEVE PROPER LEAK RATE 830107. 1 CORRECTIVE AcrIm: REPAIRED AND REASSEMBLED VALVE PER VELAN REP INSTRUCTIN. 830107 991743~ MD 1 VALVE OP 120C3 FAILURE DESCRIFfIm : BREAKER KEEPS TRIPPING WHILE TRYING 'IO OPEN VALVE. 820529 CORRECTIVE ACTIN: FOUND MTR WIRED FOR 460V ON 230V PWR SOURCE. MTR SENT CUf FOR REPRS. REBUILT & INSTArrm. SAT. 821105 919731 PD 1 11S/G SIM DUMP A'INOS FAILURE DESCRIPTICN: VERIFY CPERABILITY T ICOP. 830214 CORFECTIVE ACTIW: REPIM HAGAN COrrBarIER IN PC-516E. TEST SAT. 830215 919734 PD 1 14S/G LVL SEPPfff DEV FAILURE DESCRIPTICN: DEVIATICN AIARM DOES NOT cme UP 5% FROi LEVEL SEEPOINT. 830220 CWRECTIVE ACTICN: REPIACED C2,3,4,6, AND 7 IN ISOIA'IOR 11M-505D. 830220 Page 14 of 18
PSE&G SALEM GENERATING SIATION SAFEIY RELNIED WORK CEOER IOG SAIDI UNIT 1 9 WO NO DEPT WIT EQUIPMENT IDENTIFICATICN 923072 PD 1 13MS18 NmINIOR FAILURE DESCRIPTIN: PC'IUA'IOR DISPHRAM IS BIOWN 830301 Cri<RELnVE ACTIN: RFPLACED DIAPHRAM & JCIUNIOR PICKING. TIGH'fENED YWE STROKED VLV & SEP LIM SWICHS. OPERTS SAT. 830301 923100 PD .1 RMS 1R41B FAIIIJRE DESCRIPTIW: GANNEL FAILED HIGH. 830306 CORRBCTIVE ACTIW: REPL ACIA'S IN LOCAL Of1RLR, AELTUS'TD IOCAL OffRLR EDR MORE POS PIN CNICr. 'IESID SAT 830307 923224 PD 1~ CQfrAD@ENT D/P IND FAILURE DESCRIPfIW : GCK D/P GAGE CAL-CURRENTLY DOING 4 'IO 6 RFLTFFS/ DAY, CAN'T GET PRESS GREATER THAN.125. 830209 CORREC' RIVE 1CfIW: CALTRRATED CWSnTR DOICNIOR 1PA-96071B. 'IESTED SAT. 830301 925216 PD 1 A & B RX TRIP BKRS FAILURE DESCRIPTIW: 12 S/G IOID LEVEL FAIIID 'IO TRIP RX TRIP BKRS NHEN SIGNAL NAS RECEIVED. 830225 CORRBCTIVE ACTICN: VERED TRIP SIGNAL TO SSPS. VERED SSPS CUTPUT TO UV COILS. REPLACED BKRS WITH UNIT 2 BKRS. 830225 925243 PD 1 11 FCP SEAL REIURN FAILURE DESCRIPTIW: NO FION INDICATICN CN SEAL REIURN RECORDER. FICW HAS BEEN VERIFIED. CCRRBCTIVE ACTIN: VERIFIED S&K NOT S'IUCK. OPRTR RAISED RCS PRESS TO 340 PSI & ICWERED VCT 'IO 20 PSI. IND NORM 830229 925421 PD 1 VALVE ICV 55 FAILURE DESCRIPTIN: INCREASE SETPOINT. CAN GET WLY 82 GPM CUT W 11 CHARGING PWP 830212. CORRBCTIVE ACTICN: VERIFIED MAX FIOW CF 105 GPM 820214 Page 15 of 18
PSE&G SALEM GENERATING STATION SAFETY REUGED WORK WDER IDG SAIEM UNIT 1 WO NO DEPT LNIT EGJIPMENT NNrwICATIm .927506 PD 1 PRZR PRESSURE CCNTRL FAILURE DESCRIPPIW: GANNEL CUT T CALIBRATIN. 830106 CWRECTIVE ACTIN: REPIJCED StM9 DOR. 830303 927537 PD 1 PRZR LEVEL CHAftEL 3 -FAILURE DESCRIPTIW: W3 READS 6% HIGHER 'IHAN CH 2. 830104 CWRECTIVE ACTION: REMOVED LT-461 FRCM SERVICE. DRAINED RED LEG FOR MAINT TO WEED IEAKING CONECTIN. 830205 927651 PD 1 REACIOR TRIP BKRS FAILURE DESCRIPTIW : PERFORM TIME RESPWSE W A MAIN, B MAIN, MO A BYPASS AND B BYPASS BREAKERS. 830310 CORRECTIVE ACTIN: CmPLETED TIME RESPWSE W A AND B MAIN AND BYPASS REACIOR TRIP BREAKERS. 830310 927652 PD 1 13 CNDMT ECU FAILURE DESCRIPfIW: INVESTIGATE FION PROBLEM MIIIE PEREORMING IO W TRANENITTERS 830311 CunxrLnVE ACTION: BLEW DWN XMTITERS & BLED AIR FRCM XMITIERS. ON HIGH SPEED BKR TRIPS 50% T TIME FIiW GOOD BOTH SPEEDS 927721 PD 1 RMS W 1R46E f FAILURE DESCRIPTIN: GANNEL INDICATES HI ALARM, WARN AND FAIIURE. 830225 4 i CORRECTIVE ACTION: FtND HI VOLTAGE CKT INOPERABLE. REPLACED R1,R2,Ql,02,CR2, AND CR3. CALIBRATED CHANNEL. 830303 '986736 PD 1 11 S/G. STEAM FION i . FAILURE DESCRIFFI W: GANNEL CUT T CALIBRATIN 830224 l' CORRECTIVE ACTIW: REPL Cll & C12 IN CILCK CKT. REALIGNED MULTIPLIER 1 FM-513B & SQR ROOP AMP lEM-513C. ONPL CAL. 830224 i j Page 16 of 18
i SALEM UNIT 1 OPERATIONS
SUMMARY
REPORT JUNE 1983 . Unit No. 1 began the month at full power and continued to maintain 100% power'throughout the period, acheiving a total net generation of 782222 MWH. This is the highest total net generation for the unit for a thirty (30) day month since the beginning of commercial operation. f i Page 17 of 18
REFUELING INFORMATION DOCKET NO.: 50-272 COMPLETED BY: L.K. Miller UNIT NAME: Salem 1 DATE: July 10, 1983 TELEPHONE: 609/935-6000 EXTENSION: 4455 Month June 1983 1. Refueling information has changed from last month: YES X NO 2. Scheduled date for next refueling: August 4, 1984 3. Scheduled date for restart following refueling: October 21, 1984 4. A) Will Technical Specification changes or other license amendments be required? YES NO NOT DETERMINED TO DATE 7/1/83 B) Has the reload fuel design been reviewed by the Station Operating Review Committee? YES NO X If no, when is it scheduled? July 1983 5. Scheduled date (s) for submitting proposed licensing action: July 1984 (if required) l 6. Important licensing considerations associated with refueling: NONE 7. Number of Fuel Assemblies: A) Incore 193 B) In Spent Fuel Storage 212 8. Present licensed spent fuel storage capacity: 1170 Future spent fuel storage capacity: 1170 9. Date of last refueling that can be discharged to spent fuel pool assuming the present licensed capacity: September 1996 8-1-7.R4 Page 18 of 18 l
O PSEG Public Service Electric and Gas Cornpany P.O. Box E Hancocks Bridge, New Jersey 08038 Salern Generating Station July 10, 1983 Director, Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555
Dear Sir:
MONTHLY OPERATING REPORT SALEM NO. 1 DOCKET NO. 50-272 In Compliance with Section 6.9, Reporting Requirements for the Salem Technical Specifications, 10 copies of the following monthly operating reports for the month of June 1983 are being sent to you. Average Daily Unit Power Level Operating Data Report Unit Shutdowns and Power Reductions Major Plant Modification Summary of Safety Related Maintenance Operating Summary. Refueling Information Sincerely yours, }.Jf. 2 Ly s M. Zup o, Jr. General Manager - Salem Operations LKM:sbh cc: Dr. Thomas E. Murley - Acting Regional Administrator USNRC Region I 631 Park Avenue King of Prussia, PA-19406-Director, Office of Management' Information and Program Control U.S. Nuclear Regulatory Commission Washington, DC 20555 Enclosures Page lof 18 8-1-7.R4 6*O l S n\\ Il = The Energy People - 95 2189 (20M) 1181}}